T-013 CONSTRUCTION OF A NEW 110/13.8kV SUBSTATIONS (MNA-7) TO


DEVELOP POWER SUPPLY FOR KIDANAH PROJECT AT MINA, MAKKAH

SIZING CALCULATIONS OF DC-DC CONVERTER


00

REVISIONS
DESIGNED
BY: BM
-
DATE:-
CHECKED
BY:
-
DATE:-
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:- AS BUILT BY DATE 19-02-2024
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

T-013 CONSTRUCTION OF A NEW 110/13.8kV T MK521 WD-823030 01 OF 02 00


SUBSTATIONS (MNA-7) TO DEVELOP POWER
SUPPLY FOR KIDANAH PROJECT AT MINA,
MAKKAH

CONTRACT NO: 4400019238


WOA SAUDI ARABIA JOB ORDER NO. 3-2312002.08 DWG. CONT. SHT. WE-821921

DMS EXCEL
F.L

Details of Telecommunication Load


V.R

DC CONVERTER (1+1) SYSTEM CALCULATION BASED ON FINAL TELECOMMUNICATION LOAD


Per Unit
Per Unit Total Power
Consumption Power consumption
Equipment Qty Consumption Consumption in
with Efficiency in amps at 48V DC
(Watts) Watts
(watts/0.9)
DVM CABINET 1 850 944.44 944.44 19.68
ISSUED FOR APPROVAL

MPLS-TP CABINET 1 868.55 965.05 965.05 20.11


SWITCH S5731-H48T4XC 1 259.2 288 288 6

Cyber security=249.6 watt


RFTS cabinet = 37.8 watt
IP telephone = 369 watt
Total Consumption in watts 2197.49 4815.7
Total Equipment Consumption in Amps 114.66 45.79
V.R

25% Safety/Design Factor 28.66 11.4475


50% Spare Capacity Factor 57.33 22.895
Required output DC output Power in Amps 200.65 80.1325

210Amps 7 NO's
19-02-2024

Selected Converter 90Amps (1+1)DC DC CONVERTER WITH EACH CABINET EQUIPPED WITH 3NO's OF
30AMPS BM4830DC MODULES

11760 W
THE PROPOSED CONFIGURATION I EQUIVALENT TO 4500W NOMINALOUTPUT POWER AND 5040W
MAXIMUM OUTPUT POWER. TOTALNUMBER OF ALL MODULES BMD4830 IS THREE DC-DC CONVERTER
OUTPUT CURRENTTHE BRAGA MORO BMD4830 RATED OUTPUT CURRENT IS 90A
00

REVISIONS
DESIGNED
BY: BM
-
DATE:-
CHECKED
BY:
-
DATE:-
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
BY:-
DATE:-
CERTIFIED.
BY:-
DATE:- AS BUILT BY DATE 19-02-2024
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.

T-013 CONSTRUCTION OF A NEW 110/13.8kV T MK521 WD-823030 02 OF 02 00


SUBSTATIONS (MNA-7) TO DEVELOP POWER
SUPPLY FOR KIDANAH PROJECT AT MINA,
MAKKAH

CONTRACT NO: 4400019238


WOA SAUDI ARABIA JOB ORDER NO. 3-2312002.08 DWG. CONT. SHT. WE-821921