DIMENSI VOLUME
UNIT PEKERJAAN UNIT
P (m) L (m) T (m) (m3)
URUGAN PASIR
57.50 0.70 0.05 1.00 2.01
BAWAH PONDASI
PONDASI BATU
57.50 0.50 0.43 1.00 12.22
KALI
BERAT TOTAL
UNIT PEKERJAAN DIA BESI SPACE PANJANG UNIT
(Kg/m) PANJANG
TIMBUNAN TANAH
7.25 6.00 0.70 1.00 30.45
EL. -0.2 m
TIMBUNAN TANAH
1.75 2.75 0.60 1.00 2.89
EL. -0.3 m
TIMBUNAN TANAH
1.25 8.50 0.60 2.00 12.75
EL. -0.3 m
TIMBUNAN TANAH
1.50 6.00 0.60 2.00 10.80
EL. -0.3 m
TOTAL VOLUME TIMBUNAN 56.89
PASIR URUG
BAWAH LANTAI 7.25 6.00 0.10 1.00 4.35
EL. -0.2
PASIR URUGm
BAWAH LANTAI 1.75 2.75 0.10 1.00 0.48
EL. -0.3 m
PASIR URUG
BAWAH LANTAI 1.25 8.50 0.10 2.00 2.13
EL. -0.3
PASIR URUGm
BAWAH LANTAI 1.50 6.00 0.10 2.00 1.80
EL. -0.3 m
TOTAL VOLUME PASIR URUG BAWAH LANTAI 8.76
BETON COR t = 5
7.25 6.00 0.05 1.00 2.18
cm EL. -0.2 m
BETON COR t = 5
1.75 2.75 0.05 1.00 0.24
cm EL. -0.3 m
BETON COR t = 5
1.25 8.50 0.05 2.00 1.06
cm EL. -0.3 m
BETON COR t = 5
1.50 6.00 0.05 2.00 0.90
cm EL. -0.3 m
TOTAL VOLUME BETON COR t= 5 Cm 4.38
SL1 (15/25)
DIMENSI VOLUME
UNIT PEKERJAAN UNIT
P (m) L (m) T (m) (m3)
BETON K-125 89.50 0.15 0.25 1.00 3.36
BEKISTING (3 KALI
89.50 0.15 0.25 1.00 14.94
PAKAI)
BERAT TOTAL
UNIT PEKERJAAN DIA BESI SPACE PANJANG UNIT
(Kg/m) PANJANG
DIMENSI VOLUME
UNIT PEKERJAAN UNIT
P (m) L (m) T (m) (m3)
BETON K-250 0.19 0.19 4.65 4.00 0.64
BEKISTING (3 KALI
0.19 0.19 4.65 1.33 4.59
PAKAI)
BERAT TOTAL
UNIT PEKERJAAN DIA BESI SPACE PANJANG UNIT
(Kg/m) PANJANG
KOLOM KP (13 X 13 )
DIMENSI VOLUME
UNIT PEKERJAAN UNIT
P (m) L (m) T (m) (m3)
BETON K-125 0.13 0.13 4.65 10.00 0.79
BETON K-125 0.13 0.13 2.55 12.00 0.52
TOTAL VOLUME BETON 1.30
BEKISTING (3 KALI
0.13 0.13 4.65 3.33 8.06
PAKAI)
BEKISTING (3 KALI
0.13 0.13 2.55 4.00 5.30
PAKAI)
TOTAL VOLUME BEKISTING 13.36
BERAT TOTAL
UNIT PEKERJAAN DIA BESI SPACE PANJANG UNIT
(Kg/m) PANJANG
DIMENSI VOLUME
UNIT PEKERJAAN UNIT
P (m) L (m) T (m) (m3)
BETON K-125 17.50 0.12 0.15 1.00 0.32
BEKISTING (3 KALI
17.50 0.12 0.15 1.00 1.76
PAKAI)
BERAT TOTAL
UNIT PEKERJAAN DIA BESI SPACE PANJANG UNIT
(Kg/m) PANJANG
DIMENSI VOLUME
UNIT PEKERJAAN UNIT
P (m) L (m) T (m) (m3)
BETON K-125 67.00 0.15 0.20 1.00 2.01
BEKISTING (3 KALI
67.00 0.15 0.20 1.00 8.95
PAKAI)
BERAT TOTAL
UNIT PEKERJAAN DIA BESI SPACE PANJANG UNIT
(Kg/m) PANJANG
Ø10-200 Ø10-200
Ø10-200 Ø10-200
Ø10-200
Ø10-200
Ø10-200
Ø10-200
DIMENSI VOLUME
UNIT PEKERJAAN UNIT
P (m) L (m) T (m) (m3)
BETON K-125 4.25 3.00 0.10 2.00 2.55
BEKISTING (3 KALI
4.25 3.00 0.10 1.00 4.25
PAKAI)
BERAT TOTAL
UNIT PEKERJAAN DIA BESI SPACE PANJANG UNIT
(Kg/m) PANJANG
PEKERJAAN
DINDING 1:4
DIMENSI VOLUME
VOLUME
UNIT PEKERJAAN UNIT TOTAL
P (m) L (m) T (m) (m2)
UNIT
DR1 1.80 3.00 1.00 5.40 5.40
DR2 0.80 3.00 2.00 2.40 4.80
DR3 1.20 1.20 2.00 1.44 2.88
DR4 0.80 0.40 2.00 0.32 0.64
PJ1 3.05 2.20 2.00 6.71 13.42
P2 0.80 2.20 2.00 1.76 3.52
PJ3 3.05 2.20 2.00 6.71 13.42
P1 0.80 2.20 2.00 1.76 3.52
P3 0.80 2.20 2.00 1.76 3.52
GRANITE 60 X 60 TOTAL
LUAS UNIT
POLISHED LUAS
41.13 1.00 41.13
TOTAL GRANITE 60 X 60 POLISHED 41.13
KERAMIK
UNPOLISHED 25 X
25
KLOSET 0.56 2.00 1.12
TOTAL KERAMIK UNPOLISHED 25 X 25 1.12
PEKERJAAN ATAP DAN PLAFOND
TOTAL
UNIT
LUAS
RANGKA ATAP FURING 8.50 9.75 1.00 82.88
PENUTUP ATAP
8.50 9.75 1.00 82.88
GENTENG MONIER
TOTAL
BERAT KETERANGAN
(Kg)
348.48
TINGGI 4,65 m
29.74
120.38
TINGGI 2,55 m
8.08
506.69
TOTAL
BERAT KETERANGAN
(Kg)
42.70 POKOK
14.04 TUMPUAN
4.72 LAPANGAN
61.45
TOTAL
BERAT KETERANGAN
(Kg)
235.84 POKOK
193.16 TUMPUAN
64.53 LAPANGAN
493.53
Ø10-200
Ø10-200
Ø10-200
Ø10-200
TOTAL
BERAT KETERANGAN
(Kg)
153.72 ARAH X
155.55 ARAH Y
309.27