You are on page 1of 12

Attn : Mr / Madam

CURRICULUM VITAE
I. PERSONAL DETAILS ( Data Personal)
Full Name (Nama Lengkap): Sigit Purnomo, ST
Nick Name (Nama Pendek) : Sigit / Henri
A.Surabaya Address ( Alamat di Surabaya):
Jl Medokan Asri Barat 3 MA I - E No 49
Perum YKP Rungkut (UPN), Surabaya (60295 )
B.Batam Address (Alamat di Batam):
Graha Permata Indah Cluster Cendana
Blok G No. 3, (SMP 25) Tiban Indah. Kec . Sekupang
Batam (29426)
C. Jakarta Addres:
Jl Haji Samali No 39 A, Kalibata Pasar Minggu
Jakarta Selatan
- Home Telp In Surabaya City : 031- 8709994
- Mobile No : +628121651956
- (WhatsApp No ) : +6281275444732
- E-mail : sigitp2008@gmail.com
Date & Place of Birth( Tempat & Tgl Lahir) Gender ID. No.
Malang, 17th of July 1975 (Jenis Kelamin): 2171091707750004
Male
Nationality ( Kebangsaan): Marital Status :
Indonesian Maried
Language (Bahasa Yang dikuasai): Religion :
English ( Writing , Listening, Conversation, Speaking) Moslem
and Indonesia
NPWP : 57.764.681.3-215-000 BPJS : -
Computer Literate :
a. Operating System : DOS, Ms. Windows
b. Spread Sheet and word : Ms. Office
c. Drawing : AutoCAD ( Design Mechanical , Piping , Vessel, P&ID)
d. Program : Turbo Pascal
e. Sub filed Engineering : Maxsurf, Basic Drawing Plant & Detail Engineering Design ( Power plant
For specialist Piping , Mechanical , PID & Electrical System , FPSO
Specialist system Piping & Mechanical, and Ship building for vessel
Specialist ship building, piping system & diagram, Mechanical & electrical.
Refinery Oil & Gas : DED Storage Tank, DED Pressure Vessel, Piping
system & PID, mechanical )

II. EDUCATION ( Pendidikan )


1995 – 1998 @ Bachelor (D3) - Surabaya Shipbuilding State Polytechnic of ITS Dept: Marine Engineering,
GPA: 2.59. ( Politehnik Perkapalan Surabaya – ITS, Program Study : Permesinan Kapal)
1999 – 2002 @ Faculty of Marine Technology ITS , Surabaya Dept Of Marine Engineering, GPA: 2.68.
(Fakultas Kelautan Institut Tehnology Sepuluh November/ ITS Program Study Tehnik Sistem
Perkapalan
Title Of the thesis ( Judul Tugas Akhir )
( ANALISA KEKUATAN MEMANJANG KAPAL SELAMA PROSES PERTUKARAN AIR BALLAST
PADA VARAIASI GELOMBANG LAUT )

1 / 12
Attn : Mr / Madam

III. COURSE
1. 1997 @ Pelatihan Pengembangan Kepribadian Methode “ DALE CARNEGIE” In ITS by PLSPT
Subject : 1. The acuity of memory and's the communication skills
2. friendly to people
3. The technique making the people approve for of our thoughts
4. Effective method of in chairing meetings
5. The technique of to being a good leader
6. The techniques for dealing with anxiety and the techniques of for resolving
them well
2. 1997 @ Khursus Goefisika Ekspoitasi Gas & Minyak Bumi In ITS by HAGI
Subject : 1. The basic of engineering geological, oils and natural gas
2. The techniques geophysical exploration
3. The preliminary techniques geophysical operation
4. The data collection techniques on field
5. Field data processing techniques
6. Data interpretation techniques
7. Exploration database & Data Inventory
8. Interactive Exploration Application Systems
3. 2002 @ Welding Inspector in ITS By MIGAS & DEPNAKER
Subject : 1. Welding Inspection ( Welding Inspection, Interpretation of welding
construction drawing & Welding Qualification )
2. Standard Of Design Fabrication, Construction And Inspection For Pressure
Vessel, Boiler, Piping, Storage Tank, Structural Welding
3. Non Destructive & Destructive Test
4. Welding Technology & Welding Metallurgy
5. Health & Safety
6. Practical & The knowledge of some standard codes ASME Sect I Until ASME
Sect XII, API , AWS, ASTM, DNV, BS, BKI, Safety Regulations
4. 2008 @ Training Liquid Penetrant & Magnetic Particle Testing Level II (NDE LEVEL II PT& MT )
Specific Standard : ASME Sect V & Sect VIII Div 1, ASTM E 165, AWS D 1.1 &
Specification ( Note : I will immediately extend the active period if the
company needed, With in personal my
expense. To support the requirements needed
by the company )
5. 2006 @ SEA SURVIVAL RAFT{ In house } ( Date :22 – 23 June 2006 )
6. 2007 @ Training Radiography Testing Level II (NDE LEVEL II RT)
Specific Standard : ASME Sect V & Sect VIII Div 1, ASTM E 165, AWS D 1.1 &
Specification ( Note : I will immediately extend the active period if the
company needed, With in personal my
expense. To support the requirements needed
by the company )
7. 2007 @ In House Training ,Bimbingan Teknis Penilaian Tingkat Komponen Dalam Negeri (TKDN)
& Bobot Manfaat Perusahaan ( BMP ) Di lingkungan Industri Minyak & Gas Bumi By SI
8. 2007 @ In House Training Pelatihan Demistifying ISO 9001:2000 By SI
9. 2009 @ Marine Surveyor By BKI
Subject : Machinery Installation & electrical ,ISM code, ISPS Code, Load Line,
Marpol , Ship Construction, Ship Classification , Stability , & Conditional
Survey
10. 2010 @ In house Marine Surveyor by PT. Surveyor Indonesia
Subject : Draught Cargo monitoring, Type Marine survey, Liquid Cargo Monitoring
11. 2011 @ K-3 Migas ( Safety Officer For MIGAS )
Subject : Regulation of Safety & Fire Danger in MIGAS Area

2 / 12
Attn : Mr / Madam

III. COURSE
12. 2012 @ Basic Marine Surveyor By AISI ( Asosiasi Independent Surveyor Indonesia )
Subject : Cargo Handling Monitoring, Type Of Vessel , Type Of Vessel Cargo

13. 2013 @ Liquid Cargo Surveyor By AISI ( Asosiasi Independent Surveyor Indonesia )
Subject : Type Liquid Cargo for Vessel , Cargo Monitoring, Tank Survey
14. 2014 @ Draugth Survey Monitoring By AISI ( Asosiasi Independent Surveyor Indonesia )
Subject : Draugth Survey calculation & Type Of Cargo
15. 2015 @ Ahli K-3 Kebakaran Tingkat D & B ( LPK Mandiri – Yogyakarta )
Subject : Government Regulation For Health & Safety, Fire Protection In Building,
Fire Emergency Drill
16. 2019 @ SKA Safety By Lembaga Pengembangan Jasa Konstruksi
17. 2020 @ CAD DRAFTING Batch 157 ( Rekayasa Engineering Drafting School)
Subject : Introduction Of AutoCAD, Speed & Quality Drawing, Engineering Procedure
Of AutoCAD, Case Study Of Project Exercise & Mechanical ( Piping 2 D,
Pressure vessel, P & I D , Isometric, storage tank , Mechanical )

IV. JOB TRAINING


Name of Activity Period Company & Position
From To
1. On The Job Training June 21,1997 July 21,1997 PT. Dock &
Perkapalan Sby
(PERSERO)
Position of work:
Ass. Maintenance
- Overhaul Auxiliary machine , main machinery and repairing system at Engine room vessel
- Help QC at after end repair system dry doc ship or vessel
2. On The Job Training May 15,2000 June 30, 2000 PT. Biro Klasifikasi
Indonesia ( BKI )
Position of work :
Ass. Marine Surveyor
- Helped us the BKI surveyor to inspection the vessel. Start New building process for vessel, annual
survey for ship, dry doc inspection ship ( inspect the plate WSA area , cargo system, electric,
machinery, ect )

3 / 12
Attn : Mr / Madam

Name of Activity Period Company & Position


From To
3. On The Job Training September November 24, PT. PAL INDONESIA
18,2000 2000 Position of work :
Marine Surveyor Asst
At Germanischer Lloyd
4. On The Job Training February 1,2001 March 29, 2001 PT. PAL INDONESIA
Position of work :
Marine Surveyor Asst
At Germanischer Lloyd
- Helped The GL Surveyor to inspection the new building for construction, machinery system, electric
system for MV Palwobuono ship and MV Birthe Onder dof ship
5. On The Job Training July 1, 2002 July 30, 2002 PT. PELNI
Position of Work :
Ass Maintenance For
Auxiliary
Engine and Main
Engine
- Repairing & Overhaul Auxiliary engine ship, Main Engine , Machinery System at Engine room for
Auxiliary , Main Engine, and Machinery of the Deck

V. WORK'S OF EXPERIENCE
Name of Activity Period Company & Position
From To
1. Work’s Of Experience October , 02 1998 June ,30 1999 Notaries / PPAT :
Field Specialization : NANO
Just Officer SUNARYO,SH,Spn
Position of work :
Staff Administration
(Banyuwangi )
- Management Of Law for Area legality at Banyuwangi Town and area of vicinity .

2. Work’s Of Experience October 1, 2002 July 30, 2003 CV. Asri Dharma
Field Specialization : ( Surabaya )
Technician Position of Work :
Staff Office
Area Of Work
Sup layer Office
Equipments
- Supply service order of equipment office for what is good for fluency work in office, what is in the
form of office stationery, etc
3. Work’s Of Experience September 20 November 20 PT Filsung Indo Raya
Field Specialization : , 2003 , 2003 Jakarta Timur
Marketing Position of Work :
Technical staff
Marketing
- Management order at the company how to get the customer for have job and supervision the
production

4 / 12
Attn : Mr / Madam

V. WORK'S OF EXPERIENCE
Name of Activity Period Company & Position
From To
4. Work’s Of Experience March 1 , 2004 May 7 , 2004 PT . Bangun Bejana
Field Specialization : Baja
PPC (Plant Project Control) Position of Work :
EPC Assistance Project
Control As the work
Project Schedule
Plan’s
- Making planning program a project in order that the project can walk at ease.
5. Work’s Of Experience June 1 , 2004 September 30 PT Surya Besindo
Field Specialization : , 2004 SaktI, Project at
Engineering EPC TPPI TUBAN.
Position of Work :
Field Engineering
- Inspection the Storage tank scope of work make sure diameter tank, peaking & banding , thickness of plate
before production or construction , read drawing storage tank(DED, Field Drawing For Construction & read
drawing Piping ( isometric, DED, PID )
6. Work’s Of Experience November 1, 2004 March 30, 2006 PT BARATA
Field Specialization : INDONESIA, Project at
Welding Inspector TPPI Tuban
EPC Position Of Work :
Welding Inspector For
Storage Tank and
Piping Installation
- Reviewed drawing of the storage tank, Piping installation and make sure for construction process
- Verification material before welding process , dimensional Check & fit Up process
- Visual , and make sure & read ( Witnessing) NDT process ( MT, PT, RT,UT, Leak test , Vacuum test )
- Dimensional check , Hydrostatic test
- Prepared of QC document , report and Procedure
- Read Drawing Storage Tank ( DED& Field Drawing) , Piping ( Isometric, PID , DED )
7. Work’s Of Experience April 1, 2006 Dec,15 2006 PT KALI RAYA SARI
Field Specialization : at Chevron
Welding Inspector ( Call out Project )
EPC Position Of Wok :
Welding Inspector for
Vent stack & Piping
platform installation
- Reviewed drawing of Piping installation & Vent Stack and make sure for construction process
- Verification material before welding process & dimensional check & Fit Up process
- Visual , and make sure & read NDT process ( MT, PT, RT,UT, Leak test )
- Dimensional check , Hydrostatic test
- Prepared of QC document , report and Procedure
8. Work’s Of Experience Jan 2, 2007 March 30,2007 PT AQUA MARINE
Field Specialization : DIVINDO
NDT Method RT, MT & PT Position Of Work :
NDT for Shipbuilding
- Prepared of NDT Procedure For Shipbuilding
- Prepared Of Document NDT
- During NDT process MT, PT at shaft Propeller Vessel
9. Work’s Of Experience April 4, 2007 July 1, 2017 PT. Surveyor
Field Specialization : Indonesia (Persero)
QC Inspector , Engineering, Branch Batam
NDT , Marine Surveyor, Third
Party Oil and Gas & Industrial
5 / 12
Attn : Mr / Madam

Position Of Work :
Inspector & Surveyor
- Assessor local contain for Oil project & gas Industry Refer to Government Regulation
- Assessor audit company & reviewed of document legality company & Procedure
Note : ( 2007 ) Plat Foam ( RIG ) For Poleng Project ( West Madura )
- Certification Of DEPNAKER For Crane , Pressure Vessel, Electrical Installation, Lightening
Protection, Safety Fire System Protection and Machinery Equipment, Boiler Ref To Human
Resource Government Republic Indonesia Regulation, Quantity Surveyor, Marine Surveyor,
Quantity & Quality Surveyor For Liquid Cargo
Note : ( 2008 – 2016 ) Inspection For Company : PALMA Shipyard, SAIPEM , KOP , Vetco Gray
Indonesia, ATB , Citra Tubindo, PLN, Mitra Energi , Imeco Tuboscope, Hydrill Tenaris, Mc
Dermott, Profab, Panasonic, Schneider Electric Manufacturing Batam
- Second Hand Good Survey For Export & Import Equipment Ref To NO. 127/M-DAG/PER/12/2015
DATED DECEMBER 29TH, 2015
Note : ( 2009 -2016 ) Inspection & Survey Second Hand Good ( SHG/ Barang Bekas Modal Bukan
Baru) Refer to government Regulation For Company : BJ Services, Baker Hughes, Weather
Ford
- Conditional survey On & Off hire vessel For Chartering, Costumer Requirement & Assessments
Note : ( 2008 – 2016 ) : PT Kondur Petrolium Sa, PT. Bredero Shaw Indonesia, PT. Bandar Victory
Ship Yard, Energy Logistigs, Guna Nusa
- Loading Liquid Cargo Monitoring & Draught Survey For Quantity & Quality
Note : ( 2008 – 2012 ) Draught Survey Cement Cargo For PT. Semen Padang , Liquid Cargo
Monitoring supply For Songa Epilascape
- Towing & Lashing , Loading & Un loading Vessel Survey For Safety Staffing , Un Staffing Cargo
On Vessel C/W Towing Barge Process With Tug Boat
Note : ( 2008 – 2015 ) Towing & Lashing , Staffing & Un Staffing Cargo PT. Chevron Pacific Indonesia
- Gas Test Survey For safety in Confine space Ref To IACS Confined Space Safe Practice Rev.2
( April 2007 )
Note : ( 2008 – 2016 ) Gas Test For Company : Technip , SLC ( Saipem Lighton Con )
- Gas Freeing Inspection LPG Tanker ( Before & After Purging Gas Freeing Or Before & After
Docking ) For knowlage N2 in LPG tank
Note : ( 2014 – 2015 ) Gas Test For Company : Pertamina Tongkang ( PTK ) Name Vessel MT. Gas
Patra
- Gassing Up Process Survey For Before Loading LPG Process
Note : ( 2015 ) Name Vessel : MT. Symbio One
- Statutory Inspection , Inspection Statutory Ref To Client Requirement
Note : ( 2012 – 2015 ) : Statutory Inspection Ref To client Req. For Company : KOP ( Load Test Rack),
Rigspek Perkasa ( Witnessing Cable Laid Sling And Grommets With methode visual & Proof Load
Test Client Mc Dermott ), Delta Ship Yard ( Bollard Test With Metdhode Load Test ), Nexus (
Crane Load Test ), PT. Djass Succes Support ( Load Test Rack ), Lighten Offshore ( Method
Load test Crane, Smitt Bracket , Bollard , Wire Rope Test With Intros Equipment )
- Assessment Condition Of Jetty Refer to Engineering Design
Note : ( 2008 – 2016) : Jetty Nongsa Pura Batam

6 / 12
Attn : Mr / Madam

- NDT man for fabrication at HEI , Toyokanetsu ( Method : MT, PT & Radiography Test )
Note : ( 2007 – 2016 ) :
Des’11 ~ Present : PT. TOYO KANETSU INDONESIA ( Batam )
Conducted MT, PT / Radiography Testing on Project:
ETHANE CRACKER AND PE/PP PLANT-TURKMEN
PETRONAS RAPID PROJECT-MALAYSIA
PHASE-VI PROJECT VCM-3 PLANT - P.T. ASAHIMAS CHEMICAL (ASC)
PMPC / VIETNAM
AURORA/EOS OFF-PLOT PROJECT
PETRONAS LNG 9 SDN BHD (PL9SB)
DONGGI SENORO LNG
GLNG PROJECT
BRUNEI LNG PROJECT
PERTAMINA STORAGE TANK T1
PT. KALTIM NITRATE INDONESIA ( Bontang-KALTIM )
Conducted MT, PT Testing (Thickness Gage) for variety vessels and tanks
PT. TOYO KANETSU INDONESIA ( Batam )
Conducted MT, PT / Radiography Testing on Project:
Ethydco Ethylene Project - EGYPTIAN ETHYLENE AND DERIVATIES COMPANY
TANK & PIPING QUEENSLAND – AUSTRALIA PROJECT
OSAKA GAS PROJECT
INPEX PROJECT
Nov ’11 : PT. MITRA ENERGI / MEDCO ENERGY ( Batam )
Conducted MT, PT / Radiography Testing on Project:
Gas Heater Existing Pipe.
April ’10 ~ Oct. ‘11 : PT. TOYO KANETSU INDONESIA ( Batam )
Conducted MT, PT Testing for LPG & LNG Tank on Project:
RUWAIS REFINERY EXPANSION PROJECT Package 4 Tankage & Associated
Interconnecting Piping ( ASME STAMP ) DAEWOO / ABU DHABI OIL REFINING CO.
Oct 25’09 ~ Apr. ‘10 : PT. RIFANSI DWI PUTRA ( DURI – RIAU )
Conducted Radiography Testing ( Radiographer ) for Pipeline & Gas line
PT. CHEVRON PACIFIC INDONESIA ( DURI – RIAU )
PT. TOYO KANETSU INDONESIA ( Batam )
Conducted Radiography Testing for LNG Tank on Project :
ANGOLA LNG
NAOETSU LNG
SAKAI LNG
DAELIM-IRAN
Sept 28 ~Oct 21 ‘09 : PT. KONDUR PETROLEUM SA ( KURAU )
Conducted Radiography Testing ( Radiographer )

7 / 12
Attn : Mr / Madam

Gas Plant Project


July17 ~ Aug 12 ‘09 : PT. HEAT EXCHANGER INDONESIA ( BATAM )
Conducted MT, PT Testing
Pressure Vessel for Kipper Tuna Turrum Project ( ESSO Australia – ASME
Stamp )
July, 29 ’09 : PT. EDARAN PROFAB ( BATAM )
Conducted Radiography & MT, PT Testing
June, 25 ’09 : PT. TECHNICS OFFSHORE JAYA ( Batam )
Conducted MT, PT Testing for Pressure Vessel ( ASME STAMP )
Fab. 1140 psig 3 Phase Test Separator

Aug, 08 to Dec, ‘08 : PT. MULTI STRUCTURE ( DURI – RIAU )


Conducted Radiography Testing ( Radiographer ) for Pipeline & Gas line
PT. CHEVRON PACIFIC INDONESIA ( DURI – RIAU )
Feb, 2008 : EXXON MOBIL ( Mobil Oil Indonesia – Aceh )
Conducted Positive Material Identification on ware house ( Cross Check )
Dec, 2007 : PT. SWIBER BERJAYA BATAM
Conducted Magnetic Particle Testing on project :
Swiber Conquest Barge ( Offshore ), during servicing their offshore tools.
May, 2007 : PT. TOYO KANETSU INDONESIA ( Batam )
Conducted Radiography Testing, MT, PT & PMI on Project :
JGC / PT.BRI JO – TANGGUH LNG PROJECT
SHELL ECC PROJECT, SINGAPORE
DAEWOO / LAFFAN QATAR
DUNG QUAT – VIETNAM
YEMEN LNG PROJECT
M. V. “ DURGANDINI”
Conducted Radiography Testing on Project :
BOILER UPPER TUBE PLATE
PT. K.S.A
Conducted Radiography Testing :
PT. K.S.A Gas Line Project

8 / 12
Attn : Mr / Madam

V. WORK'S OF EXPERIENCE
Name of Activity Period Company & Position
From To
15. Work’s Of Experience July, 02 2017 June ,27 2020 PT. Surveyor
Consultant Of Design Indonesia (Persero)
EPC Head Office
Div Infrastruktur
Position of work :
Coordinator Project
& Tank Calibration
- Coordinator Project & Technique For DED ( Review design , approval for construction ):

1. MPP Paket 3 (PLTMG Tanjung Selor 15 MW, PLTMG Biak 15 MW, PLTMG Merauke 20 MW,
PLTMG Langgur 20 MW, dan PLTMG Seram 20 MW), total 90 MW
2. MPP Paket 5 (PLTMG Ambon 30 MW, PLTMG Bau-Bau 30 MW dan PLTMG Jayapura 40 MW),
total 100 MW
3. MPP Paket 2 ( PLTMG Nunukan 10 MW, PLTMG Waingapu 10 MW, PLTMG Alor 10 MW,
PLTMG Namlea 10 MW, PLTMG Saumiaki 10 MW, PLTMG Dobo 10 MW, PLTMG Serui 10 MW)
Total 70 MW
4. MPP Paket 4 (PLTMG Maumere 40 MW, PLTMG Bima 50 MW, dan PLTMG Sumbawa 50 MW),
total 140 MW) Total 140 MW ( In line Surveyor & Coordinator Perizinan Pembuangan Limbah
Cair)
5. Inspection For Storage Tank, Topaz, Genset, Fuel Pump, Fire Pump At PBMSJ for The certify of
good performance for running test
6. Calibration Volume Of Tank At PLTMG Paket 3 & PLTMG Paket 4

Name of Activity Period Company & Position


From To
16. Work’s Of Experience Oct,15 2020 June ,30 2022 PT. SINTESA
Supervising Consultant Position of work :
Ship Building Coordinator Project
Supervise
Catamaran Bottom
Glass

- Coordinator Project & Technique For

1. Supervising the shipbuilding process from start until done or hand over to owner
2. Supervision of drawing design of the ship until to on board installation application on the vessel
3. Supervision of material take order refer to specification until to install on board the vessel and
make sure can used or running

9 / 12
Attn : Mr / Madam

V. WORK'S OF EXPERIENCE
Name of Activity Period Company & Position
From To
17. Work’s Of Experience July, 01 2022 Jan, 20 2023 PT. Karaz
Consultant And Surveyor Manajemen
Position of work :
Ass Manager Ops

- Coordinator Project & Technique For :

1. Marketing Product & Project non marine


2. Prepared Document For supporting Project like Procedure, report & Manpower
3. Review & Control Quality assurance of product
4.
Name of Activity Period Company & Position
From To
18. Work’s Of Experience January, 25 2023 April, 30 2023 PT. Tri Putra
EPC – Storage Tank Cap Yusrindo
5000 M2 Position of work :
Site Manager

- Site Manager Project & Technique For :

1. Prepared Document For supporting Project like Procedure, report & Manpower
2. Plant Schedule, Report Monthly, Dayli Report, Review drawing, Supervised Engineering
Procurements Material & Construction
3. Control Quality assurance of product

V. OTHERS
Cursorily About My Self
- Familiar read and know of drawing technical for construction ( Basic Drawing & DED for Piping &
Mechanical Specialist )
- Familiar about working procedure for construction & safety
- Familiar about code and standard procedure
- Applicable to put to all condition with provisional work
- Applicable to quickly adapt with circumstance, work better and real correct and also work by
team work.
- Quickly listen carefully for all trouble shout and also quickly in taking good decision by my self
and also with team work
- Hobby : reading book & sport

10 / 12
Attn : Mr / Madam

11 / 12
Attn : Mr / Madam

Note :
Sertifikat Yang Lainya Akan saya lampirkan Segera.

12 / 12

You might also like