Engineering Standard Specification

OP4.0015 Rev 3

Quality Assurance Requirements –


Rating 1 Equipment

Rev Description By Check Appr PE Date

0 Initially prepared as part of GOP 4.60.12 JDB JDN NSS April 98

1 Revised to reflect changes in GOP4.60.12 JDN JDN NSS April 2002


Rev2 & AS 9001:2000

2 Revised to new format JJS NSS NSS 02/02/04

3 Branding Update TB JJS NSE 25/05/08

This document is Uncontrolled if printed

© 2008 Aker Solutions Australia Pty Ltd ABN 56 004 239 972. No part of this document or the information it contains may be
reproduced or transmitted in any form or by any means electronic or mechanical, including photocopying, recording, or by any
information storage and retrieval system, without permission in writing from Aker Solutions Australia Pty Ltd.

OP4.0015_R3.doc Page 1 of 5
Engineering Standard Specification

OP4.0015 Rev 3

CONTENTS

1. GENERAL ........................................................................................................................ 3

2. TENDER........................................................................................................................... 3

3. CONTRACT ..................................................................................................................... 3

3.1 Quality Plan .................................................................................................................. 3

3.2 Inspection and Test Plan (ITP) ..................................................................................... 4

3.3 General......................................................................................................................... 4

OP4.0015_R3.doc Page 2 of 5
Engineering Standard Specification

OP4.0015 Rev 3

1. GENERAL

For the design, manufacture and supply of the equipment and services, the
Vendor shall apply a quality system that:

• complies with the requirements of AS 9001-2000, with a scope that covers


the design, manufacture and supply of the equipment in the scope of
supply , and is currently assessed as conforming to the standard by a
recognised third party accreditation agency.

2. TENDER

The Tenderer shall submit with the tender:

(a) a statement on the current compliance status of their quality system with
respect to AS 9001 (the statement shall be made by completion of the
Quality Assurance Questionnaire), and

(b) a copy of the third party certificate and schedule,

(c) a draft Quality Plan for the works.

(d) a draft Inspection and Test Plan (ITP) for the works.

3. CONTRACT

Following the award of the contract:

3.1 Quality Plan

The Vendor shall prepare and submit for review and approval by the Purchaser a
Quality Plan.

The Quality Plan shall contain, as appropriate, the elements identified in


AS 9004.5:1998

In addressing clauses 5.6 & 5.10 (AS 9004.5) the Vendor shall define;

• Which products or services are to be sub-contracted and specify the quality


systems to be applied.

• How the Vendor will verify the Sub-Contractor’s conformance to specified


requirements by one or more of the following methods:

• Inspection and test by the Sub-Contractor

• Inspection and test by the Vendor at the Sub-Contractor’s facility

OP4.0015_R3.doc Page 3 of 5
Engineering Standard Specification

OP4.0015 Rev 3

• Surveillance by the Vendor

• Incoming inspection at the Vendor’s premises.

The Quality Plan shall be controlled for the duration of the contract.

3.2 Inspection and Test Plan (ITP)

The Vendor shall prepare and submit an ITP for review and approval by the
Purchaser.

The ITP shall indicate where each inspection and test point is located in the
manufacturing/construction cycle. Incoming inspection, preservation of products,
packaging, and any site inspection and testing shall be indicated. ITPs for
significant sub-suppliers shall also be submitted.

The ITP shall contain all the elements identified by clause 5.10 of
AS9004.5:1998.

3.3 General

The required timing for submission of the Quality Plan and the ITP for review and
approval by the Purchaser is listed on the Vendor Data Commitments sheet.

The Vendor shall nor commence any manufacture or construction until the
Inspection and Test Plan(s) have been approved by the Purchaser

The Vendor shall submit copies of inspection and test procedures to the
Purchaser on request.

The Purchaser reserves the right to survey the level of implementation of the
Vendor’s quality system both before and after award.

In order to assess the level of implementation, the Purchaser and/or the


representative of the Purchaser has the right of access to the Vendor’s premises
and working area in order to audit, survey and verify that specific requirements
are being met. The rights of access shall extend to the sub-contractor premises
and working area.

The Vendor shall make provision for a ‘pre-inspection meeting’ to be held at the
Vendor’s premises and/or those of any major sub-contractors. The meeting will
be held, when deemed necessary by the Purchaser, prior to the start of
fabrication or manufacture. The agenda will be provided by the Purchaser and
will cover issues of safety, quality assurance and control, schedule, milestones,
training, and manufacturing surveillance (Inspection and Expediting)

The Vendor shall supply the certification listed in the Vendor Data Commitments
in addition to any other required by the Project Specification, relevant statutory
legislation and applicable Australian Standards

OP4.0015_R3.doc Page 4 of 5
Engineering Standard Specification

OP4.0015 Rev 3

Company Name

Address Fax No.

Tel No.

1. (a) Does the Company have a Quality Representative responsible for the Quality Yes No
System?

(b) If YES, state Name Position

(c) Reports to Name Position

2. (a) Has the Company quality system received accreditation? Yes No

(b) If YES, state • Quality System Standard

• Registration Agency

• Scope of Registration

3. If response to Section 2 is YES, then do not complete this section.

If response to Section 2 is NO, then complete this section

(a) Does the Company have and operate a quality system? Yes No

(b) Does it comply with a recognised quality system standard? Yes No

(c) If answer to (b) is YES, which standard?

(d) Are there quality system procedures for:

• Quality Plans Yes No

• Contract/Tender Review Yes No

• Design Control Yes No

• Document Control Yes No

• Purchasing Yes No

• Process Control Yes No

• Inspection and Test Plans Yes No


`
• Control of Inspection Measuring and Test Equipment Yes No

• Non-Conformance and Corrective Action Yes No

• Internal Audits Yes No

OP4.0015_R3.doc Page 5 of 5