Engineering Standard Specification
OP4.0015 Rev 3
CONTENTS
1. GENERAL ........................................................................................................................ 3
2. TENDER........................................................................................................................... 3
3. CONTRACT ..................................................................................................................... 3
3.3 General......................................................................................................................... 4
OP4.0015_R3.doc Page 2 of 5
Engineering Standard Specification
OP4.0015 Rev 3
1. GENERAL
For the design, manufacture and supply of the equipment and services, the
Vendor shall apply a quality system that:
2. TENDER
(a) a statement on the current compliance status of their quality system with
respect to AS 9001 (the statement shall be made by completion of the
Quality Assurance Questionnaire), and
(d) a draft Inspection and Test Plan (ITP) for the works.
3. CONTRACT
The Vendor shall prepare and submit for review and approval by the Purchaser a
Quality Plan.
In addressing clauses 5.6 & 5.10 (AS 9004.5) the Vendor shall define;
OP4.0015_R3.doc Page 3 of 5
Engineering Standard Specification
OP4.0015 Rev 3
The Quality Plan shall be controlled for the duration of the contract.
The Vendor shall prepare and submit an ITP for review and approval by the
Purchaser.
The ITP shall indicate where each inspection and test point is located in the
manufacturing/construction cycle. Incoming inspection, preservation of products,
packaging, and any site inspection and testing shall be indicated. ITPs for
significant sub-suppliers shall also be submitted.
The ITP shall contain all the elements identified by clause 5.10 of
AS9004.5:1998.
3.3 General
The required timing for submission of the Quality Plan and the ITP for review and
approval by the Purchaser is listed on the Vendor Data Commitments sheet.
The Vendor shall nor commence any manufacture or construction until the
Inspection and Test Plan(s) have been approved by the Purchaser
The Vendor shall submit copies of inspection and test procedures to the
Purchaser on request.
The Purchaser reserves the right to survey the level of implementation of the
Vendor’s quality system both before and after award.
The Vendor shall make provision for a ‘pre-inspection meeting’ to be held at the
Vendor’s premises and/or those of any major sub-contractors. The meeting will
be held, when deemed necessary by the Purchaser, prior to the start of
fabrication or manufacture. The agenda will be provided by the Purchaser and
will cover issues of safety, quality assurance and control, schedule, milestones,
training, and manufacturing surveillance (Inspection and Expediting)
The Vendor shall supply the certification listed in the Vendor Data Commitments
in addition to any other required by the Project Specification, relevant statutory
legislation and applicable Australian Standards
OP4.0015_R3.doc Page 4 of 5
Engineering Standard Specification
OP4.0015 Rev 3
Company Name
Tel No.
1. (a) Does the Company have a Quality Representative responsible for the Quality Yes No
System?
• Registration Agency
• Scope of Registration
(a) Does the Company have and operate a quality system? Yes No
• Purchasing Yes No