Expro Excellence

Expro delivers first CoilHose


operation in Malaysia to
image area
support well test operation

Well Intervention

Objectives and background Expro Excellence

• Expro under its multi service contract had been • Expro provided a proposed engineered solution
requested to mobilise conventional coil tubing as with its latest ¾” OD CoilHose Light Well
a contingency to lift the overbalance cushion in a Circulation System
newly completed well Excellent and safe job
• Equipment was prepared and mobilised to the executed by Expro within a
• Operations were planned to be conducted on the region within 21 days where a successful site
short time frame, allowing
critical path with the use of a drilling rig integration test (SIT) was completed prior to
mobilisation to the rig us to meet our objectives,
• Incumbent supplier was not able to provide a coil by engineering a solution
tubing package within the requested time frame and • Key interfaces with the rig and other key suppliers
together, we were able
therefore posed a potential delay to the work scope were successfully managed
which would impact delivery of the entire project to unload the cushion
• Expro delivery met the customer expectations and on an overbalanced well
• Coil Tubing is used as a key contingency should the project continued without delay
allowing us to gas lift
the well be unable to flow naturally and is therefore
imperative to the overall operation the well to achieve our
Value to the client well test objective.”
• Overall delivery of the well without impacting the
project timeline Petronas

• Equipment was mobilised on a scheduled


vessel with other rig supplies which removed the
requirement for a chartered vessel that would
normally be required for conventional coil tubing

• Reduced package footprint allowed for an Bespoke solution


optimum rig up that was prepared offline ahead of
the operational requirements

• Operational rig up, rig down timings were vastly


improved and were performed with a multi-
disciplined reduced POB

• First ever well to be successfully unloaded using


CoilHose technology in the Asia Pacific region

Contact

For further information please contact:


wellintervention@exprogroup.com
or visit
exprogroup.com/wellintervention
© Expro International Group LTD | Date 11/2019 | Revision 1.1

You might also like