Ir Dr Richard Pang
Director - Industry Development
Construction Industry Council
MODULAR INTEGRATED CONSTRUCTION (MIC)
1
Advantages
Reduced waste, Improved safety
dust, noise & on site
vehicles
Increased productivity
PRODUCTIVITY
SUSTAINABILITY
SAFETY
TIME
QUALITY
Better product
Shorter construction period quality in
controlled
environment
2
Signature Overseas MiC Projects
Avenue South Residence The Clement Canopy 101 George Street AC Hotel New York
NoMad by Marriott
7.5% of the homes built in the UK used prefabricated or modular elements in 2017-
2018
Support sustainability
• Around 400 million tonnes of construction materials each year
• MiC plays a key role in reducing the carbon footprint
5
Overview of PPVC in Singapore (as of Feb 2020) PPVC Development
in Singapore
3 + 6 + 3 + 7 + 11 + 10 + 7 + 1 = 48
Government Buildings Hostel Others
70% by 2025
target of
75% of all its units launched in 2020 will adopt DfMA methods
7
The “Thirteenth Five-Year” Action Plan for
DfMA Development in the
Mainland
Prefabricated Construction in 2017
Key Tasks:
2 major goals proposed: • Prepare development plan
• Develop system of standardization
(1) More than 15% prefabrication for • Improve technical system
new buildings by 2020 • Improve design capabilities
(2) Will establish • Enhance industry support capabilities
> 50 exemplary cities • Implement “Engineering, Procurement and
Construction” (EPC)
> 200 industrial bases
• Promote full renovation for building
> 500 exemplary projects construction
> 30 technology innovation bases • Promote green development
• Improve project quality and safety
• Cultivate industry teams
8
DfMA Development in the Mainland
Guangdong Province
In 2018
• New construction area:16%
• Concrete: 3.246 million sqm
• Steel: 1.734 million sqm
• New construction area: 30 million sqm
As of March 2019
• Total no. of projects: 188
• Concrete:151 (Including 18
completed projects and 133
ongoing projects)
• Project construction area: more
than 13 million sqm
來源:深圳市住建局
10
Development of MiC in Hong Kong
The Chief Executive’s
Policy Address
2017 & 2018
03 Enhance monitoring
measures
11
Development of MiC in Hong Kong
12
Development of MiC in Hong Kong
13
>30 MiC projects
under consultation and/or
MiC Projects
construction in Hong Kong
Transitional Social Housing
9 Nam Cheong Street HKCSS 2019 - 2020
10 Yen Chow Street HKCSS TBC - 2021
11 Yip Shing Street HKCSS 2020 - 2021
Permanent MiC Buildings 12 Song Wong Toi Road Lok Sin Tong 2020 - 2021
13 United Court/ Tung Tau, Yuen Long Sheng Kung Hui TBC-2022
1 InnoCell HKSTP 2018 - 2020
2 Jat Min Chuen Elderly's home HKHS 2020 - 2022
3 HKU Student Hostel HKU 2019 - 2023
4 Pak Shing Kok FSD Quarters ArchSD 2018 - 2020
5 "RCHE" in Kwu Tung North ArchSD 2019 - 2022
6 Fire station-cum-ambulance depot in Area 72, TKO ArchSD 2022 - 2025
7 Chai Wan Ambulance Depot ArchSD 2022 - 2025
8 Public Housing in Tung Chung HKHA 2021 - 2024
Period Site
8, 10 Jan 20 ArchSD PSK Site
12 Mar 20 InnoCell
9 Apr 20 Penny’s Bay Quarantine Centre
4 May 20 Lei Yue Mun Quarantine Centre
20 May 20 Nam Cheong Street Project ArchSD PSK Site InnoCell
Penny's Bay Quarantine Centre Lei Yue Mun Quarantine Centre Nam Cheong Street Project
18
Overseas Site Visits
Visit to MiC Factories in Greater Bay Area Technical Visit to Singapore
14-16 Jan 2020 For NGOs 24-26 June 2019
19
Training Courses
3-Day Executive Training Course for MiC
in Singapore In Sep 2019 Courses Date Content
• The architectural concept, related
Lectures/ Case studies/ Site visits Certificate in MiC for Project legal requirements, testing
Q3 2020
Manager and Clerk of Works requirements and BIM
Delegation includes clients, consultants, management platform
contractors, NGOs, etc.
Certificate in Modular • Changes in works and roles of a
Integrated Construction July 2020 foreman; practicality and
(MiC) for Foremen operability
21
THE
CONSTRUCTION Funding Mode
Structural Carcass
Structural Steel
Fire Protection to Steel
Floor Slab/Roofing Sheet
Connections, etc.
Transportation
5%
MEP
20%
Steel Carcass
39%
Doors/
MEP windows/
Electricity metalwork Architectural/
5% finishing/ Fire
Plumbing protection
waterproofing
Drainage Transportation 12% (wall/ floor/
Fire Services Shipment ceiling)
Air-conditioning, etc. Land Transport 19%
BD, FSD, WSD, EMSD, TD, EPD, Custom & Availability & capability Shipping/road transport, local site
Excise Department, etc. storage or Just-in-time (JIT) delivery
QA/QC
07 Procurement
08 Technical issues
(Materials standards) 09
Inspection and acceptance D&B, insurance, ECI, down payment, Waterproofing, durability, fire protection
material offsite and ownership and connections
24
MiC has many advantages, in particular, speed Take Aways
The TSH project (15,000 units in 3 years) is very challenging