You are on page 1of 47

ERA OF DIGITAL

CONSTRUCTION

BIMLABS ENGINEERING SERVICES PVT. LTD


MEET THE PRESENTER

 Technical Engineer, BIMLABS

Er. AMAL P V
amal@bimlabs.in
•BIMLABS Situated in Kerala, Southern state of India
•Autodesk Learning Partner & Member of Indian Green Building Council
•Business Areas

• BIM Training for Students and Corporates


• BIM Implementation Support for Corporates & Organizations
• BIM Project Outsourcing
• BIM Placement Services
• For More Details:

Email info@bimlabs.in | shiju@bimlabs.in


BIMLABS Engineering
WhatsApp 9744293003, 9745268888
Services Pvt. Ltd
Facebook https://www.facebook.com/bimlabs.in/
Web https://www.bimlabs.in/
Linked In https://www.linkedin.com/company/13390596/admin/
PROJECT STAGES DESIGN
CONCEPTUAL
DESIGN
DETAILED
DESIGN

BUILDING ENERGY
STRUCTURAL LIGHTING
ANALYSIS EFFICIENCY

PROJECT
TIME COST RESOURCE
MANAGEMENT

DOCUMENTA SHOP
APPROVAL AS-BUILT
TION DRAWINGS

CONSTRUCTION LOGSTICS COMMISSIONING

MAINTENA
OPERATION NCE
CAD WORKFLOW
Floor Plans
Elevations
Sections
Detailed Views
Schedules
Legend
Color Legend

2D
2D Location Plan
Drainage Details

3D OPTIONAL
Need a Better Workflow
Updations :- Coordination Time Cost Energy
Rework & Clashes Management Estimation Efficiency
• A Small • Manual • Not in • Cant Rely on • No Way
correction Tracing control Manual
needs Sheets Estimation
number of method not Methods
updations in sufficient to
Different avoid
Sheets sudden
Work Breaks

NO CONTROL OVER BUDGET, TIME


BIM BUILDING
INFORMATION
MODELING
What is

“it’s a Process involving the generation and management of digital representations of


physical and functional characteristics of places which in turn aid AEC Professional
to plan, construct and manage Buildings and infrastructure more efficiently”
BIM is EFFICIENT
Updations :- Coordination Time Cost
Rework & Clashes Management Estimation
• Automatic • Clashes can • Can Link • Dedicated
Updation. be Identified Schedule Quantity
in any stages Date with Estimation &
Model easily Material Take
• Coordination • 4D off Tools.
is Very Easy Construction
BIM is EFFICIENT
Cloud Building VR Energy
coordination Simulation Construction Efficiency
• Connected • Link model • Make Use • Integrated
BIM with Project of the Cloud Tools
managemen Power of to evaluate
• Collaborate t data. VR in the Energy
through the construction Efficiency
power of of buildings
Cloud
© 2014 Autodesk
© 2014 Autodesk
FALCON
Which
country is
considered
FALCON
as national
bird?
• UAE-
• United Arab
Emirates
BIGGEST EVENT OF UAE
1 October 2021 - 31 March 2022
UAE
PAVILION
Following a seven-month design
competition with submissions from
the world’s leading architecture
firms, the National Media Council
of the United Arab Emirates
(UAE) selected Santiago
Calatrava’s proposal for the UAE
Pavilion at the Dubai World Expo
2020.

The structure, which will sit at the


heart of the nearly 500-acre
exhibition area and whose design
is inspired by a falcon in flight,
will be seen by the roughly 25
million visitors and participants
who are expected to visit the Expo
from October 2020 to April 2021.
SANTIAGO CALATRAVA
1. Theme of the Expo: “Connecting Minds, Creating the Future,” 
2. Selected from 1 1 concepts by Nine of the world’s most celebrated architectural
firms
3. When completed, the Calatrava-designed UAE Pavilion will be approximately
15,000 square meters (over 161,000 square feet) and will include numerous
1. exhibition areas, an auditorium, food and beverage outlets and VIP lounges.
2. It will be designed to meet LEED Platinum sustainable building standards.
4. The building is designed to be one of the Expo’s greatest icons and embodies
complex sustainable technologies throughout.
• Sustainability certification and management throughout design and
construction
• Energy Performance Advisory
• CFD Simulation and Energy Modelling
• Commissioning Advisory
• Renewable Energy Calculations
5. Developer: Masdar/Mubadala
Steel Structural Engineering
• UAE PAVILION – EXPO 2020 PROJECT HAS BEEN AWARDED TO GSI
• GSI has Been Awarded Main Structural Steel Package (Supply and Installation) for the
Construction of One of The Most Iconic and Prestigious Pavilion of Dubai Expo-2020.
• Overall Steel is Expected to be in The Range of 2500 Ton.
• http://www.gsifz.com/en/latest-news/41.aspx
• CHALLENGES
• 1- Time schedule is very pressed
• 2- Most of the project built-up beams & non-standard connection
• 3- All Main Ribs with Camber
• WHY TEKLA
• Tekla Structure & Tekla BIMsight Helps us to finalize the project with the best
coordination
• ABOUT COMPANY
• Gulf Steel Industries FZE was established in response to the increasing global demand for
quality Structural Steel Buildings.  
• Our services to the construction and related industries include Design, Fabrication, and
Installation of Structural Steelworks.
. . .
MEP Contractor
• Emirates Falcon Electromechanical Company (EFECO)
• Role : MEP Contractor
• Location: UAE, Dubai
• Completion Year:2019
• Complete MEP works for the UAE Pavilion at Expo 2020 Dubai in the
centre of the 4.38 km2 exhibition area. It is set on an area of
15,000 m2 with a total BUA of 22,149 m2. (Ground floor, mezzanine
floor, plaza level and upper level.) The upper floor of the pavilion
spans an area of 2,000 m2 while the mezzanine floor will have an area
of 662 m2. The ground floor, with gardens and parking spaces, sprawls
over 13,300 m2. Another 3,000 m2 will be set aside for a plaza level
and related facilities.
Construction
Partners
Arabtec wins AED 353 million Omnium is appointed on this AESG is a specialist consultancy
award for the UAE Pavilion at and commissioning firm
unique project of exceptional
Expo 2020 headquartered in Dubai with
design and prominence, in offices in London and Abu
Jul 04,2017 addition to Expo 2020’s further Dhabi. Our areas of expertise
Signature Pavilions, to deliver are represented in six core
pre contract quantity surveying departments: Energy and
Sustainable Development,
services to architect Calatrava Environment, Fire and Life
International. Expo 2020 Safety, Facades,
Commissioning and Acoustic
consulting.
MEP in BIM
MEP – Building Services
• Imagine yourself in a beautiful
building
• Now what happens if you take
away the air conditioning,
lightings, the lifts and escalators,
acoustics, plumbing, power
supply and energy management
systems, the security and safety
systems
• You are left with a dark,
uninhabitable shell.
MEP – Building Services
• Everything inside a building
which makes it safe and
comfortable to be in comes
under the title of 'Building
services'.
MEP – Building Services
• A building must do what it was designed to do - not just provide
shelter but also be an environment where people can live, work and
achieve.
• MEP is what makes a buildings come to life.
MEP- MECHANICAL SERVICES
• HVAC
• Fire fighting
MEP- ELECTRICAL SERVICES
• Lighting
• Earthing & Lightning Protection
• Fire Detection & Alarm System
• Public Address System
• Access Control System
• CCTV System & Monitoring System
• Building Security System
• Building Management System
MEP- PLUMBING
• Domestic water system
• Flushing water system
• Sewage water system
• Rain water system
• Sewage treatment plant
• Water treatment plant
• All piping & sanitary fixtures that provide water for any
• USE (drinking, cooking, bathing, laundry, process, etc.)
ARCHITECTURE CIVIL STRUCTURAL MECHANICAL ELECTRICAL IT & COMPUTER
SCIENCE

BIM Modelling-
BIM Modelling- BIM Modelling- BIM Modelling-
BIM Modelling- Arch Structural
Infra Mechanical Electrical
Steel & Concrete 1. Visual Programmer of
BIM Models.
BIM Detailing- BIM Detailing-
BIM Detailing- BIM Detailing- IT administration of BIM
BIM Detailing Arch Infra, Road, Structural.
Mechanical Electrical Projects.
Metro. Steel & Concrete
Managing BIM Servers
BIM and Data Centres.
BIM Coordinator BIM Coordinator BIM Coordinator
BIM coordinator-Arch Coordinator-
Structural MEP Electrical
Civil

BIM Manager BIM Manager BIM Manager BIM Manager BIM Manager

BIM JOB PROFILES


How to crack it.
Submit the
resume with a
Follow the Portfolio
Companies
Maintain the and Company
Linked In Key Personals
Attain the Skill Profile
sets Required updated
Understand
the job
Identify the Description
Companies
Thank you
AMAL P V