Professional Documents
Culture Documents
Tipikal Desain
Tipikal Desain
00
+22 kan
Peredam energi
A N
0
5.0
ta
UKIM
dira
N
+211.50
34
PERM
E
Peredam energi
1:2
Coloum
80 x 80
El. +225.00
ENTRY
W
El. +225.00 El. +225.00 FIXED CONE VALVE
DN 450 PN 10
EL. +223.30
BONETED
T.G FLOOR
Knife Gate valve SLIDE GATE
DN 600 PN 10
DN 450 PN 10
EL. +848.760
SERVICE BAY
+219.10
+219.10
+219.10
+219.10
OUTLET GALERY
+219.10
S
EL. +223.30
EL. +223.30
SWITCHGEAR ROOM
BATTERY ROOM
EL. +223.30
CONTROL ROOM
BUTTRESS
PIPA AIR BAKU Ø 0.50 m
+225.00
2.00
+265.56
+220.00
00
5.81
+220.
0+00
+265.56
6°
+292.00
6.22
.1
12
+310.00
8.13
15.16
+292.00
16.70
19.00
8.00
+286.00 +286.00
Control Panel lift
+280.00 +286.00
56.00 17.50
4.002.50 4.00
10.50
TRUSHBOOM
03 Area fa
302.
4 silitas +300
.00
58+00
AH
SAW
360
355 P.1 P.2 P.3 P.4 P.5 P.6 P.7 P.8 P.9 P.10 P.11 P.12 P.13 P.14 P.15 P.16 P.17 P.18 P.19 P.20 P.21 P.22 P.23 P.24
350
345
340
335
2.00
330
2.00
325
5.00
2.00
320 CL JALAN
5.00
2.00
315
5.00
2.00
310
5.00
2.00 2.00
305
5.00
2.00 2.00
300
5.00
5.00
295
5.00
5.00
Elv. +292.00
El. + 292.00
290
Elv. +286.00 Elv. +286.00
285
7.00
2.80
Elv. +280.00
280 279.50 279.50
9.70
275
271.50 271.50
270
265
261.50 261.50
260
255
15.28
250.50 250.50
250
245
20.75
240.50 240.50
240
235
230.50
230
225
220
215.00 215.00
215
210
207.00
205
200
195
190
185
NO. STA P.1 P.2 P.3 P.4 P.5 P.6 P.7 P.8 P.9 P.10 P.11 P.12 P.13 P.14 P.15 P.16 P.17 P.18 P.19 P.20 P.21 P.22 P.23 P.24
25.87 292.00 321.02
331.37
328.9
310.1
300.0
308.9
318.1
328.5
330.8
345.0
EL. MUKA TANAH
292.00
33.24 292.00
27.15 292.00
29.40 279.50
0.000 0.000
0.000 0.000
0.000 0.000
EL. DASAR PONDASI
33.7
KEDALAMAN GALIAN
PONDASI (m)
C
℄
BENDUNGAN
13.00
300 5.00
295
L BENDUNGAN
300
290
295
2.00
WS Q PMF
285
290
WS Q 1000 th
280
24.00
7.362
WS Q 25 th
285
275
280
2.00
270
19.40
275
265
270 Beton conventional K350 ; 29,05 MPa
260
265
255
260
250
255
Beton Precast K300 ; 24,90 MPa 245
250 Ventilasi udara
Pipa Ø 40 cm 240
34.00
245 32.00
235
240
jembatan +228.00 230
235
urugan tanah +230.00 225
+229.50 +222.00
230
+226.00 220
225
+225.00
215
BETON PERKUATAN TEBING PONDASI JEMBATAN
+221.00
220 +218.80 68.00 15.60 4.00 62.00
210
215
140.00
0.00
211.50 205
+210.00 bronjong 0.5 x 1 x 1.5 m
10.00
210
200
205
groundsill beton K225
112.41
200
87.97
77.00
85.00
6.00
116.40 21.60 59.80 37.80 74.60 24.00 49.79 4.00
2.00
25.31
1.60
236.7
232.6
223.2
220.3
217.0
216.5
215.0
215.0
215.0
215.0
215.0
206.40
+230.093
+229.151
+228.000
+221.254
+221.000
+221.259
+225.150
+223.949
el. muka tanah
EL. RENCANA DASAR SALURAN
NO. STA 0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 3+50 3+75