Planned
Gran Total
Cutting, bending and placing the iron bar of the floor as per
1.2 Rebar 8 mm m 9.00
the specification
2 Reservoir Superstructure
2.1 Cutting, bending and placing of vertical iron bar Rebar 8 mm m 9.00
2.2 Cutting, bending and placing of horizontal circle iron bar Rebar 6 mm m 9.00
3.1 10cm thick reinforced concrete for top slab(C-25 1:2:3) Concrete m³ 1000.00