ASSIGNMENT
EAT 340
PROFESSIONAL ENGINEERING MANAGEMENT
TECHNIQUE
Overview:
This assignment contributes 30% to your final module mark. Please ensure that you retain a
duplicate of your assignment. We are required to send samples of student work to the external
examiners for moderation purposes. It will also safeguard in the unlikely event of your work
going astray.
Skills
• Ability to apply theoretical concepts to practical managerial situations.
• Ability to apply a range of financial tools that can be used to control costs and manage a
business.
Important information:
You will receive no marks for work that is not your own. Your work may be subject to checks for
originality.
Where you are asked to submit an individual piece of work, the work must be entirely your own.
The safety of your assessments is your responsibility. You must not permit another student access
to your work.
Instructions to candidate:
• What impact might the proposed production capacity upgrading, have on existing and
future manufacturing in terms of safety, the environment, cost, customer service and
quality factors.
• Due to the upgrading, what are the technology and facilities need to involve in the
production line?
• Will the upgrading require additional resource allocation and planning?
Finance Manager
• What are the financial implications to the business?
• What is the current profit/loss status?
• What will be the profit/loss status after the capacity upgrading?
• Is the new project viable financially? The cash flow and cost/benefit analysis that clearly
articulated the payback period, ROI, NPV etc. is essential in the report and presentation.
Human Resource Manager
The HR manager should consider including some of the following areas in their report:
• Will the upgrading impact the employee lifecycle, the policies and statutory requirements.
• What is the recruitment process will be followed for new employees, who skills are
required to support the upgrading? How will that be organized and managed?
• Holistically, what is the existing culture in the company? How will that be conveyed,
embedded, and communicated to new employees?
• What systems are in place to reward, measure the performance of employees and what are
the challenges that might ensue and be guarded against?
• What training will be required for new starters? What grading system will be adopted?
Other factors that might be relevant such as issues of flexibility, standard operations, equality of
terms and conditions, balance between work and home life, individual development are suggested
to be discussed.
Operation Manager
As Operation Manager your task is to develop and present a operation strategy for the increase of
bag production. You need to highlight the difference(s) of the developed strategy compared to the
existing strategy and discuss explicitly how this new strategy can be integrated in the existing
strategy. You should consider on how the operation activities will to be planned, controlled, and
recorded. Another consideration are the systems that need to be in place to ensure safety of drivers
and vehicles. Examples would be: statutory 6 obligations, risk assessments, permit to work etc.
Recommendations of corrective actions are welcome.
It is expected that students will use the PMBOK, and practical aspects covered in the course to
inform their approach.
---------------------------------------------
Finally, the whole management team should identify any issues or risks associated with the project
and through this analysis, recommend or reject the proposal. Consideration should also be given
to the impact of the proposed capacity upgrading on the environment and any actions that might
be taken to minimize this effect?
Team Instructions
Each student group consists of up to 6 members (the management team) and together provide the
report for the CEO. Teams should organize regular review meetings with the CEO along with their
own team meetings. Minutes of team meetings must be recorded showing dates held, points
discussed, and actions agreed with owners. These minutes should be made available to the CEO
for inspection as an appendix to the final report.
The two key deliverables of this assignment are:
1) A report comprising of an Executive Summary, Conclusions/ Recommendations,
Reference sections (written by the team and marked as the team). The main body of the
report will comprise of individual named report sections from each manager (length 1500
words +10%).
2) A formal presentation of the findings and recommendations to the CEO’s (Module
Instructor) via a 20-minute (max) power-point presentation at the end of the course.
Presentation will be scheduled based on CEO time and date.
The marks will be awarded as follows:
Elements Marks
Presentation 5
Use of References 10
Referencing
• Students may use textbooks or appropriate academic literature (journal articles and
conference papers) to justify their statements. All data sources used and cited in the report
should be correctly referenced utilizing the Harvard Reference System.
• It is expected that each part of the assignment will have 5 –10 academic references. An
exceptional assignment will have more.
• References from commercial and other web pages are to be used very sparingly. Excessive
use of such web pages will be reflected in a reduction of the use of references’ mark, due
to using non-academic references. A general reading bibliography is not required to be
included.
• The assignment must be presented as a formal report and printed in 'Times New Roman',
the body of the report being font size 12pt. The report should be single space and printed
on A4 paper and stapled in the top left-hand corner. The report should not be placed in a
folder or cover.
• The report should be professional in its nature and to a high standard and quality.
APPENDIX
ADDITIONAL INFORMATION SECTION
Appendix 1
LIST OF TABLES
LIST OF FIGURES
LIFE
Anti corrosion
Paint spray Booth Drier box
OOvveerrhheeaadd ccoonnvveeyyoorr
CABINET
Install swing
Connect cable Clean and remove
Robot to rotate
Fit door Quality Inspection Functional testing Fit rear cover
Financial data
Assumptions
• Fixed costs are shared equally between production lines of bags
• Discount Cash flow calculations - uses a 8% Discount rate
Fixed cost
Marketing and Advertising
Advertising £3,000
Direct marketing £500
R&D development £3,000
Administrative
Wages and salaries £40,000
Labour £30,000
Materials £9,000
Outside services £15,000
Sundry Supplies £150
Meals and entertainment £250
Rent £5,000
Telephone £800
Utilities £1,000
Depreciation £0
Insurance £300
Manufacturing Data
Current production shifts and capacity
Table 1 :Production Capacity
Output Shifts Duration Break
per hour of shift per shift
Drum Line 40 2 8 hour 1 hour
Cabinet line 40 2 8 hour 1 hour
Assembly line 70 1 8 hour 1 hour
Table 3 : Materials
COSTS
DIRECT (£)
MATERIALS
white colour
Motor £20 £20
Dispenser £5 £5
Drum £30 £30
Cabinet £40 £40
Paint £5 £20
Door £5 £10
Pump £5 £5
other £30 £30
Marketing Forecast
Sales before project
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Quantity
White washing m/c 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000 10000
Black and gold 0 0 0 0 0 0 0 0 0 0 0 0
Green 0 0 0 0 0 0 0 0 0 0 0 0
Red 0 0 0 0 0 0 0 0 0 0 0 0
Sales forecast
List of tasks and cost estimate for new extension, equipment and installation
This scope of the project management element includes describing the management process!
…. of cost benefit analysis, writing of appropriation, design and procurement of equipment,
supplier selection, equipment specification. Project Engineers are not expected to propose
specific items of equipment and design.
General
• Cable installation, power, lighting, networking and telemetry
• Design power system layout – in-house project team
• Additional 415 V circuit breaker – contract out
New substation
• New supply to extension Ink mixroom MCC substation – contract out
• Capacitor bank for power factor correction - in-house project team in conjunction with
outside supplier
• Motor control centre (MCC) to supply services 415 V 3 phase to motors, ink mixers,
pumps, extraction fans etc. - in-house project team in conjunction with outside supplier
• Emergency stops’ interlocking for mixers
New extension building and additional storage area
• High bay lighting for all areas – in-house project team
• 2 up and over doors/ access between warehouse and main building – contract out
• Fire alarm system
Ink mix room-mixers/pumps/ultrasonic baths etc in-house project team in conjunction with
outside supplier
Colour match computer- in-house project team in conjunction with outside supplier
Monorail modifications and Lifting equipment - in-house project team
Pneumatics/compressed air ring main- in-house project team
3 x Fork lift trucks - in-house project team