Professional Documents
Culture Documents
Gom STP Ins Pid 01017 S3 D
Gom STP Ins Pid 01017 S3 D
Stampede
Green Canyon 468/512
Field Development Project
Gulf of Mexico
Submittal No.: 3
DOC. CODE:
?
3 22.12.15 JD CD MB For Approval
2 09.02.15 JD CD MB For Approval
1 18.09.14 JD CD MB For Approval
0 23.04.14 JD CD MB For Approval
c:\users\davicch\appdata\local\temp\sapeasydms\gep_100\daviesch\800276393_fol_000_00\00215a9b08141ed3b2de23a5bdf0c6f9\pump
p & i diagram .doc
REV. DATE BY CHK. APP. REASON FOR ISSUE Sheet 1 of 4
4 4
HH HH HH HH HH HH HH HH HH HH HH
VI H VI H TI H XI H TI H VI H VI H VI H VI H ZI H ZI H
100A 101A 100A 100A 101A 104A 105A 106A 107A 102A 103A
HH HH HH HH HH HH HH HH HH HH
H H H H H H H H H H
VM VM TM XM TM VM VM VM VM ZM ZM
100A 101A 100A 100A 101A 104A 105A 106A 107A 102A 103A
VT VT VT VT VT VT ZT ZT
VE VE TE XE TE VE VE VE VE ZE ZE
100A 101A 100A 100A 101A 104A 105A 106A 107A 102A 103A
Probe Probe Duplex RTD Accel Duplex RTD Probe Probe Probe Probe Probe Probe
TP1 TP2
(Coupling Guard)
(Techlok) (Techlok)
TW
ZE ZE TE TE TE TE TE XE TE VE VE SE TE TE TE TE TE TE TE
100A 101A 104A 105A 102A 103A 106A 101A 107A 102A 103A 100A 108A 114A 109A 110A 111A 112A 113A
(Techlok)
Duplex RTD Accel Duplex RTD Probe Probe Probe Duplex RTD Duplex RTD Duplex RTD Duplex RTD Duplex RTD Duplex RTD Duplex RTD
TP3
ZT ZT VT VT ST
2 2
Driver Driver Driver
HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH
ZM H ZM H H TM H TM H TM H TM H TM H XM H TM H VM H VM H SM TM H TM H TM H TM H TM H TM H TM H
100A 101A 104A 105A 102A 103A 106A 101A 107A 102A 103A 100A 108A 114A 109A 110A 111A 112A 113A
HH HH HH HH HH HH HH HH HH HH HH HH HH HH
ZI H ZI H TI TI TI TI TI H XI H TI H VI H VI H TI H H TI H TI H H H TI H
SI TI TI TI
100A 101A HH 104A HH 105A HH 102A HH 103A 106A 101A 107A 102A 103A 100A 108A 114A 109A 110A 111A 112A 113A
H H H H
Keyphasor
DRAWN: 12-MAR-2014
HPCP
c (DATE OF DRAWING) SULZER PUMPS ALL
P&I DIAGRAM W. BURNELL
COPYRIGHT
RIGHTS RESERVED. NO PART OF THIS DRAWING MAY BE 150-270/22A HESS STAMPEDE CHECKED: 13-MAR-2014
REPRODUCED, DISTRIBUTED, OR TRANSMITTED IN ANY
WATER INJECTION PUMPSET J. DRURY
FORM OR BY ANY MEANS, ELECTRONIC OR MECHANICAL,
SOLAR TURBINES
CONDITION MONITORING
INCLUDING PHOTOCOPYING AND RECORDING, WITHOUT
APPROVED: 13-MAR-2014
THE EXPRESS PRIOR WRITTEN CONSENT OF SULZER 044-PAT-6210A
PUMPS 100150409-0010 A. SNARE
SIMILAR DWG. - SEE SHEET 1 FOR NOTES, SYMBOL LIST, TERMINATION POINTS ETC..
PART NO.