CALCULATION SHEET
340-CAL-ST-BEE-001
STRUCTURE DIVISION
Jun-10
Project : BP Berau Training Pool Doc.No. : 340-CAL-ST-BEE-001
Location : Tangguh, Papua Revision :
Building : Training Pool Date :
Page : 1 of 14
Structural Preliminary Calculation Report
1. INTRODUCTION
This report present structural preliminary design calculation for Training Pool building at BP
Berau Training Pool project. The structure is designed as 3-D moment. This building sizes is
30 m x 15m. The structural analysis of concrete building are carried out using computer
analysis SAP 2000 program.
2. GENERAL
2.1 UNITS
The units used in this calculation are :
Length : mm, m
Area : mm2 , m2
Force : kg, ton
Moment : kgm, tonm
Pressure/Stress : kg/m2
2.2 REFERENCES
1. The drawing for references are as follow :
• 340-DWG-RC-BEE-101: Training Pool Foundation Plan, Sections & Details
2. The document for references are as follow :
• Geotechnical Report on Administration and Dormitory Area for Land Survey
Work Tangguh LNG Project, Appendix C, SBH-1312 and SBH-1313.
• 10-2309-RFI-001 : Nearest Borehole Positions
• Bore Map
2.3 CODES, LITERATURES, AND PROGRAMS
The codes, literature and programs will be applied are as follow :
1. American Institute of Steel Construction (AISC)-ASD, 9th editions
2. American Concrete Institute (ACI 318-02)
3. Indonesian Loading Regulation
4. Code of Practice for Seismic Design of Building in Indonesia (SNI-1726-2002)
5. American Society for Testing and Materials (ASTM)
6. American Welding Society (AWS D1)
7. Foundation Analysis and Design, Joseph E. Bowles
8. Table for the Analysis of Plates
To find the internal forces & result at structure elements, computer programs
SAP 2000 were used (Structural Analysis Program).
Project : BP Berau Training Pool Doc.No. : 340-CAL-ST-BEE-001
Location : Tangguh, Papua Revision :
Building : Training Pool Date :
Page : 2 of 14
Structural Preliminary Calculation Report
3. MATERIALS
3.1 STEEL
1. Structural Steel
Steel profile, steel plate should be ASTM A36 with minimum yield strength 240
N/mm2.
2. Bolt
Bolt should be high strength bolts ASTM A-325, shall be galvanized.
3. Anchor Bolt
Anchor bolt should be ASTM A-307
4. Welding Electrode
All welding material shall conform to the requirement of AWS-A5-E70 and full
penetration with filler metal E 70XX
3.2 CONCRETE
1. Concrete
The specified compressive strength at 28 days f’c = 30 N/mm2 = 350 kg/cm2 (cylinder)
Elastic modulus, Ec= 4700 f'c = 2.57 E4 N/mm2
Unit weight = 2400 kg/m3 = 2.4 t/m3
2. Reinforcement
Reinforcement steel should be bar SII 0136 BJTD 40 (minimum yield strength fy=4000
kg/cm2 )
4. LOADING
4.1 LOAD TYPE
1. Dead Load (D)
Reinforced concrete (self weight) : 2400 kg/m3
γ Soil : 1800 kg/m3
γ’ (γsoil - γwater) : 800 kg/m3
2. Live Load (L)
Water : 1000 kg/m3
Project : BP Berau Training Pool Doc.No. : 340-CAL-ST-BEE-001
Location : Tangguh, Papua Revision :
Building : Training Pool Date :
Page : 3 of 14
Structural Preliminary Calculation Report
Based on 10-2309-RFI-001, the nearest Bore Hole to the Training Pool location are
SBH 13.12 and SBH 13.13. At SBH 13.13 the ground water level position is 1 meter
below the ground. The training pool structure must be adequate to hold uplift
pressure.
The weight of water is 1 ton/m3. Uplift pressure equal to the total weight of water
replaced by the training pool constructed below the water level. The weight of
training pool structure must be heavier than the uplift pressure, with the safety factor
(SF) is 1.2.
In Attachment C, the weight of concrete plus the soil above the additional slab is
1460.4143 ton. The uplift pressure is 1173.0704 ton. Total weight of structure divided
1460.4143
by uplift pressure is = 1.245 . With the SF = 1.2. the structure is adequate
1173.0704
to hold uplift pressure.
Project : BP Berau Training Pool Doc.No. : 340-CAL-ST-BEE-001
Location : Tangguh, Papua Revision :
Building : Training Pool Date :
Page : 4 of 14
Structural Preliminary Calculation Report
4.2 LOADING
Spring Constant :
qallowable = 4000 kg/m2
SF = 3
Hslab (assumed) = 600 mm
Ks = 40 x SF x q allowable = 480000 kg/m2.
Ph = 1.5 * γ soil * h
Ph = γ water * h
References
_ _ _
__ RA|
N D __|
||___
I
23-M
AR-2
006
_ _ _
__ RA|
N D __|
||___
I
23-M
AR-2
006
1 of 1
NO. RFI NO. PROJECT ASPECT OR ISSUE RESPONSE SUMMARY REFERENCE DATE
NO. RFI No. Aspek Proyek/PokokBahasan Ringkasan Jawaban Referensi Tanggal
2309-RFI-001
1-Jun-10 1 Please inform the exact position of the training pool refering to borehole points
(which of the borehole point is the nearest to the training pool position)
Uplift Calculation