Welding process accidentally occurred. The integrity of
Electrofusion After connecting the cables of the control welding indicators such a joint is suspicious. Electrofusion is a rapid and simple way of permanent jointing. Using the box the welding process can commence Please note that the fitting will become electrofusion couplers and equipment, pipes, fittings and prefabricated pipe by pushing the start button. The control too hot to be touched during the welding sections can efficiently be assembled. All HDPE products can be welded by box adapts the welding time to the ambi- process. The temperature will continue electrofusion unless specifically stated in the product table, see pages 6-17. ent temperature. When it is colder than to increase for some time after the fusion 20°C the welding time is extended and process has been completed. when the ambient temperature exceeds 20°C the welding time is shortened. For Deformation welding times and cooling down times see A big deformation of pipe and fitting table below. can cause problems during assembly Electrofusion couplers During the fusion process the pipe/fitting Preparations and welding of the components. The dimension weld cooling expands and touches the inner coupler d1 system time time 200 – 315 mm maximum allowed deformation of pipe or Couplers are extremely suitable for The following guidelines are of importance 40 – 160 mm wall. The electrofusion joint is made with mm sec min fitting spigot is 0.02 x d1. This results in a applications in wastewater and rainwater when making an accurate electrofusion joint: Compared to a butt-weld, it is harder to the pressure caused by the expanding HDPE Constant maximum difference between the largest drainage, with the following features: • Establish a work space where the welding 40-160 80 20 judge a good electrofusion weld. The and the heat from the resistance wires. current 5A and smallest diameter corresponding with 1. Injection moulded with excellent can be done without being effected by Constant welding indicators on the electrofusion the table below. The pipe or fitting spigot dimensional accuracy and stability. Electrofusion coupler with fusion major weather conditions. Temperature 200-315 voltage 420 30 coupler provide an indication if the weld needs to be “rounded” using clamps when 220V and cold zones -10°C/+40°C. has actually been executed. However, they the deformation is larger. 2. Welding indicators on each welding do not guarantee the integrity of the joint. surface for visual identification to show • Check if the equipment functions The joint assembly should not be diameter d1 d1 max - d1 min The amount of movement of the pop-out that the coupler has been welded. properly. Welding equipment used on disturbed during the fusion cycle and for (mm) depends on several factors including the 3. Centre stops are easy to remove, in site deserves special attention. the specified cooling time afterwards. 40 1.0 size tolerances of the components and order to use the coupler as a slip • The resistance wire in the electrofusion A full load can only be applied after the any ovality of the pipe or fitting. 50 1.0 coupler. coupler lies at the surface for a good heat complete cooling time. The cooling period 56 1.0 can be reduced by 50% when there is no A joint can be marked o.k. when the exchange. The resistance wires need to be 63 1.0 4. Resistance wires fixed to the surface for welding indicators are protuded, all covered by the inserted pipe or fitting to additional load or strain during cooling. 75 1.5 an optimal heat transfer and therefore a welding preparations such as marking ensure correct operation. 90 2.0 high quality welding connection. insertion depth, scraping making sure 110 2.0 5. Yellow edge surrounding the welding • Complete insertion is essential to utilise that there was no additional load during cold zone fusion zone 125 2.5 indicators of the diameters 200, 250 and the fusion and cold zones in the coupler. welding and cooling have been executed 160 3.0 315mm are provided for better visibility. • Make sure both ends inserted into the successfully. If a significant quantity of 200 4.0 coupler have been properly scraped and melt flows out from the fitting after The resistance wires are positioned in the Without removing the welding, there may be a misalignment of 250 5.0 fusion zone. On both sides of a fusion have been cleaned. Both pipes and fittings oxygen layer a weld the components, the tolerances may be 315 6.0 zone, a cold zone prevents the molten need removal of the oxidation layer. cannot be guaranteed. excessive or a second welding may have HDPE from outpouring thereby containing the fusion process.
Incorrect Jointing procedure
Correct Jointing procedure 1. Misalignment 3. Welding more than once 4. Load on vertical pipe 1. Cut the pipe square 3. Scrape pipe and mark insertion 4. Clean coupler The pipe ends must be cut square to depth again Before assembling the pipes into the ensure that the heating element in the The outer surface of the pipe (approx. coupler ensure that all surfaces are coupler is completely covered by the 0.2mm deep) must be scraped for clean and dry. 2x KG g pipe or fitting. the full distance that will be covered by the coupler to remove any surface 'oxidation'. 2. Coupler sliding when The insertion depth should be marked installed vertical again to safeguard full insertion. 2. Mark insertion depth + 10 mm 5. Insert pipe and/or fitting up This is to ensure that across the full to pipe stop welding zone the oxidised layer will Ensure that the pipe is pushed as be removed. straight as possible into the fitting.