Professional Documents
Culture Documents
1995
C
SD-06 CHASE
SD-02
T2 SD-11
CHASE
SD-11
D
CHASE SEE PLAN
AREA A WD-03
PWD TOILET
FIRE AS PER CLP_SM_DSI_1
EXIT 01 NOTES:
· USE 12MM Ø REBARS FOR HORIZONTAL SPACING @
6313
EE ROOM
EVERY 3 LAYER OF CHB AND 12MM Ø REBARS FOR
VERTICAL SPACING @ 600MM FROM CENTER.
E COMMON
TOILET · PROVIDE LINTEL BEAM @ EVERY 3M CHB VERTICAL
(SHE)
SPAN
SD-07
· PROVIDE STIFFENER COLUMN @ EVERY 3M CHB
HORIZONTAL SPAN
T2 · USE CONSTRUCTION GAP WITH 12MM STYROFOAM,
E SD-07
BACKER ROD AND BOSTIK SEALANT.
EPOXY.
· HORIZONTAL REBARS TERMINATED TO STEEL COLUMN
T2 BENDING @ 90° WITH 50mm LENGTH WELDED TO STEEL
G COLUMN WITH 12mm STYROFOAM
2331
FICEM BOARD
25mm PLASTERING
T2 CHASE CHASE CHASE CHASE
WD-03 SD-02
150mm CHB WALL
J A
100mm CHB WALL
DRAWING REFERENCES: 100mm CHB SUBWALL
1. ELEVATORS: AS OF 12 JAN PROPOSED 15TH FLOOR - TOWER 2 SHEAR WALL
2.
2023_CL-806611564-ELEV-PE1-6, SE-03/16 TO 16 /16
TOILET LAYOUT: CL-RFI-PLUM-004 & 005 1 CHB WALL SETTING LAYOUT PLAN
3.
4.
RFA-CL-JSEC-010-REV.1 (FODC)
AS-BUILT
DSI-SD-306.2 SCALE 1:100M AREA B RC WALL
PROJECT TITLE: OWNER: SHEET CONTENT: PROJ. NO. CP-02 NO. REVISIONS DATE SHEET NO.
DRAWN BY : VV 00 CHB WALL SETTING LAYOUT 18 AUG 2023
Design.Saga Inc. ARCHITECT ENGINEER CENTRAL LINK PROJECT FRONTIER HARBOR PROPERTY PROPOSED 15F
DEVELOPMENT INC. CHB WALL CHECKED BY: SG
ARCHITECTURE INTERIOR DESIGN ENGINEERING
PTR. NO. REG. NO. PTR. NO. REG. NO.
CP-02 ARCH'L WORKS FOR PACKAGE 2 (TOWER 1) AND PACKAGE 3 (TOWER 2)
SETTING LAYOUT DSI-SD-306.2H
DATE: TIN: DATE: TIN:
BGY. TAMBO PARANAQUE CITY PLAN @ T2 DATE: 08/ 18/ 2023
ISSUED AT: ISSUED AT:
16 17 X-B 18 19
5200 4950 4950 5200
T2
C 3210 1715 3378 3740 3200 1055 4350
3085 308 1100 308 3253 125 125 1754 100 1091 125 125 650 100 800 100 2450 125
C
1995
125
125
200
159 1150 467 1150 159 1502 250 1502 SD-06 CHASE 1150 33 1150 58
58
SD-02 133
SD-11 133
1470
1470
1470
SD-11
1345
1345
1270
1470
125
175
27 1000 27
350
357
500 225
625
325
1700
375
150 1025 2000
150 1870
175
350 2935 1365 200
125
893
4300 2080 150 450 225
1896
WD-03
2130
1800
2000
1667 250 1663
FIRE EXIT
1500
SEE TYP. SECTION "D" FOR RC WALL CONVERSION
STAIR 01
1828
4192
200
400
400
EE ROOM
6313
5467
5467
4855
5292
2380 3579
5815
4237
3965
3965
300
SEE TYPICAL
E
1896
SECTION D
FEMALE COMMON
2737
2737
3740 TOILET
7400
2762
3630
1834
SEE TYP. SECTION "D" FOR RC WALL CONVERSION
SD-07
3153
247 1681 250 1444 2232 250 1972 350
50
125
250
250
VOID
100
582
200
478
200 2831 576 4199 150
348
3800
T2
200
375
244
E
511
711
1707
SEE TYPICAL
2800 200
1247
SECTION D 197
1000
400
FOR RC WALL
2083
SD-07
CONVERSION 320
3128
365
4550 SERVICE
2650
1900
SD-05
1961 350 2239 ROOM
3149
3331
FIREMAN'S
AUX ROOM
2420
LIFT
1400
1400
1380
175
175
4059
ALIGN TO SHEARWALL
1949
705
375
1380
1080
CHASE
200
484
200 475
2025 400 2025
500
200
125
950
125 1475 250 1475 200
635
635
2819
825
T2 CHASE
125
F
1995
SE-03/16 TO 16/16
1380
1020
ISSUED AT:
TIN:
BGY. TAMBO PARANAQUE CITY PLAN @ T2 DATE: 08/ 18/ 2023 A
16 17 X-B 18 19
5200 4950 4950 5200
50
125
250
250
VOID
100
582
200
478
200 2831 576 4199 150
348
3800
T2
200
375
244
E
511
711
1707
2800 200
1247
FIRE EXIT 197
1000
400
STAIR 01
2083
SD-07
320
3128
365
4550 SERVICE
2650
1900
SD-05
1961 350 2239 FIREMAN'S ROOM
3149
3331
AUX ROOM
LIFT
2420
1400
1400
1380
175
175
4059
1949
ALIGN TO SHEARWALL
375
705
1380
1080
CHASE
200
484
200 475
C
2025 400 2025
500
200
125
950
125 1475 250 1475 200
635
635
2819
825
VOID
SUBWALL 1500MM HIGH
T2 ELEVATOR WALL BEAM FOR RFI NO.
125
1380
1380
1020
1952
150
635
3200
635
1345
LOW WALL 600mm HIGH
1345
T2
150
7270
710
3475
710
2118
1237
9060
2331
PASSENGER F PASSENGER
8032
7996
1380
1380
SEE TYP. SECTION "D" FOR RC WALL CONVERSION
4486
250
COMMON
TOILET
3734
T2
635
635
1345
SEE TYPICAL
B
1345 FIRE EXIT
SECTION D STAIR 02
5725
2750
710
710
26
125
125
1380
1380
CHASE CHASE
250
1300
1300
2778
1991
2031
567
532
1150 179
180
1237
350
240 365
3550 350
SD-02
594
WD-03
J
85
351
PROJECT TITLE: OWNER: SHEET CONTENT: PROJ. NO. CP-02 NO. REVISIONS DATE SHEET NO.
DRAWN BY : VV 00 CHB WALL SETTING LAYOUT 18 AUG 2023
Design.Saga Inc. ARCHITECT ENGINEER CENTRAL LINK PROJECT FRONTIER HARBOR PROPERTY PROPOSED 15F
DEVELOPMENT INC. CHB WALL CHECKED BY: SG
ARCHITECTURE INTERIOR DESIGN ENGINEERING
PTR. NO. REG. NO. PTR. NO. REG. NO.
CP-02 ARCH'L WORKS FOR PACKAGE 2 (TOWER 1) AND PACKAGE 3 (TOWER 2)
SETTING LAYOUT DSI-SD-306.2H
DATE:
ISSUED AT:
TIN: DATE:
ISSUED AT:
TIN:
BGY. TAMBO PARANAQUE CITY PLAN @ T2 DATE: 08/ 18/ 2023 B
T2 T2 T2 T2 T2
16 17 X-B 18 19
200
200
50
50
2150
2150
SD-02 SD-02
300
300
FFL ELEVATOR LOBBY FFL
250
TILES W/
2550
2400
2150
SD-05 ADHESIVE
SHEARWALL
2 CHB WALL SETTING LAYOUT
1200
SD-306.2 SCALE 1:75M
VOID
T2 T2 T2 T2 T2
19 18 X-B 17 16
CHB
CHB
12MMØ VERTICAL REBARS
SLAB
SOFFIT
BEAM
200
200
200
50
50
50
3000
3000
2150
2150
2150
SD-11 SD-11 WD-04
SD-02 SD-11 SD-11
ELEVATOR LOBBY
150
150
150
150
FFL
WATERPROOFING
12MMØ HORIZONTAL REBARS
15F SECTIONAL ELEVATION "C" - TOWER 2
3 C-ELEVATION
CHB WALL SETTING LAYOUT NOTE:
SPOT SECTION
SD-306.2 SCALE 1:75M DETAIL - B
DSI TO COORDINATE WITH OTHER TRADE CONS FOR POSSIBLE
CONFLICT ON RC WALL CONVERSION.
PROJECT TITLE: OWNER: SHEET CONTENT: PROJ. NO. CP-02 NO. REVISIONS DATE SHEET NO.
DRAWN BY : VV 00 CHB WALL SETTING LAYOUT 18 AUG 2023
Design.Saga Inc. ARCHITECT ENGINEER CENTRAL LINK PROJECT FRONTIER HARBOR PROPERTY PROPOSED 15F
DEVELOPMENT INC. CHB WALL CHECKED BY: SG
ARCHITECTURE INTERIOR DESIGN ENGINEERING
PTR. NO. REG. NO. PTR. NO. REG. NO.
CP-02 ARCH'L WORKS FOR PACKAGE 2 (TOWER 1) AND PACKAGE 3 (TOWER 2)
SETTING LAYOUT DSI-SD-306.2H
DATE:
ISSUED AT:
TIN: DATE:
ISSUED AT:
TIN:
BGY. TAMBO PARANAQUE CITY PLAN @ T2 DATE: 08/ 18/ 2023 C
NOTE:
T2 T2 T2 T2 T2 T2 T2 DSI TO COORDINATE WITH OTHER
C D E F G H J
12MMØ VERTICAL REBARS
TRADE CONS FOR POSSIBLE CONFLICT
SLAB
SLAB
ON RC WALL CONVERSION.
SOFFIT
100MM CHB
12mmØ HORIZONTAL
PLASTERING
WALL TILE
25
300
FFL FFL
100 25
12MMØ HORIZONTAL REBARS
1
D-ELEVATION
15F SECTIONAL ELEVATION "D" - TOWER 2
CHB WALL SETTING LAYOUT
SD-306.2 SCALE 1:75M
T2 T2 T2 T2 T2 T2 T2
C D E F G H J
25 50
12MMØ VERTICAL REBARS
SLAB
SOFFIT
SLAB
BEAM BEAM BEAM
BEAM BEAM
25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR
FOR LOP WIRING FOR LOP WIRING FOR LOP WIRING FOR LOP WIRING
& CONDUIT & CONDUIT & CONDUIT & CONDUIT
3000
1300
150
25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR
2400
25MM Ø SLEEVE FOR FOR LOP WIRING FOR LOP WIRING
FOR LOP WIRING & CONDUIT & CONDUIT
& CONDUIT
RC WALL CONVERSION
800
1100
1100
1100
ZOCALO
300
300
FFL FFL
1500
12MMØ HORIZONTAL REBARS
800
E-ELEVATION
15F SECTIONAL ELEVATION "E" - TOWER 2
CHB WALL SETTING LAYOUT
PIPE CHASE
2
1100
SD-306.2 SCALE 1:75M
T2 T2 T2 T2 T2 T2 T2
J H G F E D C
12MMØ VERTICAL REBARS
SLAB SLAB
SOFFIT SOFFIT
300
BEAM
BEAM BEAM BEAM
ZOCALO
3054
300
3000
25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR
2400
ZOCALO
2260
2260
SD-07 SD-07
1100
1100
ELEVATOR
300
L O B B Y
50
FFL FFL
11230 50
12MMØ HORIZONTAL REBARS
F-ELEVATION
15F SECTIONAL ELEVATION "F" - TOWER 2
WATERPROOFING
SECTION
3 CHB WALL SETTING LAYOUT SPOT SECTION DETAIL - D
SD-306.2 SCALE 1:75M DETAIL - C AS PER DSI-RFA-021
RESPONSED FROM PMCSI
PROJECT TITLE: OWNER: SHEET CONTENT: PROJ. NO. CP-02 NO. REVISIONS DATE SHEET NO.
DRAWN BY : VV 00 CHB WALL SETTING LAYOUT 18 AUG 2023
Design.Saga Inc. ARCHITECT ENGINEER CENTRAL LINK PROJECT FRONTIER HARBOR PROPERTY PROPOSED 15F
DEVELOPMENT INC. CHB WALL CHECKED BY: SG
ARCHITECTURE INTERIOR DESIGN ENGINEERING
PTR. NO. REG. NO. PTR. NO. REG. NO.
CP-02 ARCH'L WORKS FOR PACKAGE 2 (TOWER 1) AND PACKAGE 3 (TOWER 2)
SETTING LAYOUT DSI-SD-306.2H
DATE:
ISSUED AT:
TIN: DATE:
ISSUED AT:
TIN:
BGY. TAMBO PARANAQUE CITY PLAN @ T2 DATE: 08/ 18/ 2023 D