You are on page 1of 6

16 17 X-B 18 19 TOWER- 2

5200 4950 4950 5200


T2
C

1995
C
SD-06 CHASE
SD-02

T2 SD-11

CHASE
SD-11

CHASE CHASE CHASE


WD-04
CHASE
SD-11 SD-11

D
CHASE SEE PLAN
AREA A WD-03
PWD TOILET
FIRE AS PER CLP_SM_DSI_1
EXIT 01 NOTES:
· USE 12MM Ø REBARS FOR HORIZONTAL SPACING @
6313

EE ROOM
EVERY 3 LAYER OF CHB AND 12MM Ø REBARS FOR
VERTICAL SPACING @ 600MM FROM CENTER.
E COMMON
TOILET · PROVIDE LINTEL BEAM @ EVERY 3M CHB VERTICAL
(SHE)
SPAN
SD-07
· PROVIDE STIFFENER COLUMN @ EVERY 3M CHB
HORIZONTAL SPAN
T2 · USE CONSTRUCTION GAP WITH 12MM STYROFOAM,

E SD-07
BACKER ROD AND BOSTIK SEALANT.

D SERVICE · VERTICAL REBARS DRILLED TO FLOORING WITH 75MM


ROOM SD-05
FIREMAN'S AND CONCRETE BEAM SOFFIT WITH 120MM APPLIED
AUX ROOM LIFT
4059

WITH PIONEER ALL PURPOSE STRUCTURAL EPOXY.


· VERTICAL REBARS TERMINATED TO STEEL BEAMS /
CHASE
DECK SOFFIT BENDING @ 90° WITH 50MM LENGTH
CHASE WELDED TO STEEL BEAMS/DECK SOFFIT
B
T2 · HORIZONTAL REBARS DRILLED TO SHEARWALLS @

F 120MM WITH PIONEER ALL PURPOSE STRUCTURAL


1952

EPOXY.
· HORIZONTAL REBARS TERMINATED TO STEEL COLUMN
T2 BENDING @ 90° WITH 50mm LENGTH WELDED TO STEEL
G COLUMN WITH 12mm STYROFOAM
2331

· PROVIDE 300MM HEIGHT ZOCALO ON WET AREAS AND


COMMON PASSENGER'S F PASSENGER'S
TOILET ELEVATOR ELEVATOR MEPFS CHASES.
(HE)
T2 · ELEVATORS DRAWING REFERENCE: AS OF
12 JAN 2023_CL-806611564-ELEV-PE1-6, SE-03/16 TO 16/16
H FIRE
EXIT 02 LEGEND:
SC STIFFENER COLUMN
3146

FICEM BOARD
25mm PLASTERING
T2 CHASE CHASE CHASE CHASE
WD-03 SD-02
150mm CHB WALL
J A
100mm CHB WALL
DRAWING REFERENCES: 100mm CHB SUBWALL
1. ELEVATORS: AS OF 12 JAN PROPOSED 15TH FLOOR - TOWER 2 SHEAR WALL
2.
2023_CL-806611564-ELEV-PE1-6, SE-03/16 TO 16 /16
TOILET LAYOUT: CL-RFI-PLUM-004 & 005 1 CHB WALL SETTING LAYOUT PLAN
3.
4.
RFA-CL-JSEC-010-REV.1 (FODC)
AS-BUILT
DSI-SD-306.2 SCALE 1:100M AREA B RC WALL
PROJECT TITLE: OWNER: SHEET CONTENT: PROJ. NO. CP-02 NO. REVISIONS DATE SHEET NO.
DRAWN BY : VV 00 CHB WALL SETTING LAYOUT 18 AUG 2023
Design.Saga Inc. ARCHITECT ENGINEER CENTRAL LINK PROJECT FRONTIER HARBOR PROPERTY PROPOSED 15F
DEVELOPMENT INC. CHB WALL CHECKED BY: SG
ARCHITECTURE INTERIOR DESIGN ENGINEERING
PTR. NO. REG. NO. PTR. NO. REG. NO.
CP-02 ARCH'L WORKS FOR PACKAGE 2 (TOWER 1) AND PACKAGE 3 (TOWER 2)
SETTING LAYOUT DSI-SD-306.2H
DATE: TIN: DATE: TIN:
BGY. TAMBO PARANAQUE CITY PLAN @ T2 DATE: 08/ 18/ 2023
ISSUED AT: ISSUED AT:
16 17 X-B 18 19
5200 4950 4950 5200

T2
C 3210 1715 3378 3740 3200 1055 4350

3085 308 1100 308 3253 125 125 1754 100 1091 125 125 650 100 800 100 2450 125

C
1995

125

125
200
159 1150 467 1150 159 1502 250 1502 SD-06 CHASE 1150 33 1150 58
58
SD-02 133
SD-11 133

1470

1470

1470
SD-11

1345

1345
1270
1470

WD-04 SD-11 SD-11


T2 CHASE CHASE CHASE CHASE CHASE
D 25
1402 350 1402 BEAM 820
CHASE
3150 130

125
175
27 1000 27
350

357

500 225
625

325
1700

375
150 1025 2000
150 1870

175
350 2935 1365 200

125
893
4300 2080 150 450 225

1896
WD-03

2130

1800
2000
1667 250 1663

FIRE EXIT

1500
SEE TYP. SECTION "D" FOR RC WALL CONVERSION
STAIR 01

1828
4192

200
400
400
EE ROOM
6313

5467

5467

4855
5292
2380 3579

5815
4237
3965

3965
300
SEE TYPICAL
E

1896
SECTION D
FEMALE COMMON

2737

2737
3740 TOILET
7400

2762

3630

1834
SEE TYP. SECTION "D" FOR RC WALL CONVERSION
SD-07
3153
247 1681 250 1444 2232 250 1972 350
50

125

250

250
VOID

100

582
200

478
200 2831 576 4199 150

348
3800
T2

200

375
244
E

511

711

1707
SEE TYPICAL
2800 200

1247
SECTION D 197

1000

400
FOR RC WALL
2083

SD-07
CONVERSION 320

3128
365
4550 SERVICE

2650
1900
SD-05
1961 350 2239 ROOM
3149

3331
FIREMAN'S
AUX ROOM

2420
LIFT

1400

1400
1380
175

175
4059

ALIGN TO SHEARWALL
1949
705

375
1380

1080

CHASE

200
484
200 475
2025 400 2025
500

200
125

950
125 1475 250 1475 200

635
635

2819
825

2831 320 4450 350


950

T2 CHASE
125

F
1995

ELEVATORS DWG. REF.: AS OF 12


1075 3200 275 370 2800 200 JAN 2023_CL-806611564-ELEV-PE1-6,
1380

SE-03/16 TO 16/16
1380
1020

950 1500 1700

15F CHB WALL AREA A - TOWER 2 SCALE 1:60M


PROJECT TITLE: OWNER: SHEET CONTENT: PROJ. NO. CP-02 NO. REVISIONS DATE SHEET NO.
DRAWN BY : VV 00 CHB WALL SETTING LAYOUT 18 AUG 2023
Design.Saga Inc. ARCHITECT ENGINEER CENTRAL LINK PROJECT FRONTIER HARBOR PROPERTY PROPOSED 15F
DEVELOPMENT INC. CHB WALL CHECKED BY: SG
ARCHITECTURE INTERIOR DESIGN ENGINEERING
PTR. NO. REG. NO. PTR. NO. REG. NO.
CP-02 ARCH'L WORKS FOR PACKAGE 2 (TOWER 1) AND PACKAGE 3 (TOWER 2)
SETTING LAYOUT DSI-SD-306.2H
DATE:
ISSUED AT:
TIN: DATE:

ISSUED AT:
TIN:
BGY. TAMBO PARANAQUE CITY PLAN @ T2 DATE: 08/ 18/ 2023 A
16 17 X-B 18 19
5200 4950 4950 5200
50

125

250

250
VOID

100

582
200

478
200 2831 576 4199 150

348
3800
T2

200

375
244
E

511

711

1707
2800 200

1247
FIRE EXIT 197

1000

400
STAIR 01

2083
SD-07
320

3128
365
4550 SERVICE

2650
1900
SD-05
1961 350 2239 FIREMAN'S ROOM

3149

3331
AUX ROOM
LIFT

2420

1400

1400
1380
175

175
4059

1949
ALIGN TO SHEARWALL

375
705

1380

1080
CHASE

200
484
200 475
C
2025 400 2025
500

200
125
950
125 1475 250 1475 200

635
635
2819
825

2831 320 4450 350


950

VOID
SUBWALL 1500MM HIGH
T2 ELEVATOR WALL BEAM FOR RFI NO.
125

DSI-RFI-019, DATED JULY 26, 2023


1995
F 1075 3200 275 370 2800 200

1380
1380
1020
1952

950 1500 1700


600 150

150

635
3200

635

1345
LOW WALL 600mm HIGH

1345
T2
150

7270
710
3475

710
2118
1237

SUBWALL 1200MM HIGH

9060
2331

PASSENGER F PASSENGER

8032
7996

1380
1380
SEE TYP. SECTION "D" FOR RC WALL CONVERSION

MALE ELEVATOR ELEVATOR


VOID
250

4486

250

COMMON
TOILET
3734

T2

635
635

1345
SEE TYPICAL
B
1345 FIRE EXIT
SECTION D STAIR 02
5725

2750

710
710

26

2475 336 2275 2175


125 1000 100 1250 370 2800 200 3880 200 2810 125 1025 100 925
3146

125

125
1380
1380

CHASE CHASE
250

1300

1300
2778
1991

2031
567
532

1150 179
180
1237

2100 CHASE CHASE


T2
350

350

240 365
3550 350
SD-02
594

WD-03
J

85
351

A 376 1100 3149


960 1000 115 2475 125 3425
200 4625
350 4550 3550 3500 3350 4825

NOTE: ELEVATORS DWG. REF.: AS OF 12 JAN


15F CHB WALL AREA B - TOWER 2 SCALE 1:60M 2023_CL-806611564-ELEV-PE1-6, SE-03/16 TO 16/16

PROJECT TITLE: OWNER: SHEET CONTENT: PROJ. NO. CP-02 NO. REVISIONS DATE SHEET NO.
DRAWN BY : VV 00 CHB WALL SETTING LAYOUT 18 AUG 2023
Design.Saga Inc. ARCHITECT ENGINEER CENTRAL LINK PROJECT FRONTIER HARBOR PROPERTY PROPOSED 15F
DEVELOPMENT INC. CHB WALL CHECKED BY: SG
ARCHITECTURE INTERIOR DESIGN ENGINEERING
PTR. NO. REG. NO. PTR. NO. REG. NO.
CP-02 ARCH'L WORKS FOR PACKAGE 2 (TOWER 1) AND PACKAGE 3 (TOWER 2)
SETTING LAYOUT DSI-SD-306.2H
DATE:
ISSUED AT:
TIN: DATE:

ISSUED AT:
TIN:
BGY. TAMBO PARANAQUE CITY PLAN @ T2 DATE: 08/ 18/ 2023 B
T2 T2 T2 T2 T2
16 17 X-B 18 19

12MMØ VERTICAL REBARS SLAB


SLAB SOFFIT
SOFFIT

BEAM BEAM BEAM

200

200
50

50
2150

2150
SD-02 SD-02

300

300
FFL ELEVATOR LOBBY FFL

12MMØ HORIZONTAL REBARS


15F SECTIONAL ELEVATION "A" - TOWER 2
1 A-ELEVATION
CHB WALL SETTING LAYOUT
SD-306.2 SCALE 1:75M
T2 T2 T2 T2 T2 T2 T2
25 125
J H G F E D C
PLASTERING
12MMØ VERTICAL REBARS
SLAB
SOFFIT
100 25
100MM CHB
436 1900 314

250
TILES W/
2550

2400
2150
SD-05 ADHESIVE

SUBWALL FOR WATER CLOSET


FFL FFL WALL TILE

15F SECTIONAL ELEVATION "B" - TOWER 2 12MMØ HORIZONTAL REBARS

SHEARWALL
2 CHB WALL SETTING LAYOUT

1200
SD-306.2 SCALE 1:75M

VOID
T2 T2 T2 T2 T2
19 18 X-B 17 16

CHB
CHB
12MMØ VERTICAL REBARS
SLAB
SOFFIT

BEAM
200

200

200
50

50

50
3000

3000
2150

2150

2150
SD-11 SD-11 WD-04
SD-02 SD-11 SD-11

ELEVATOR LOBBY
150

150

150

150
FFL
WATERPROOFING
12MMØ HORIZONTAL REBARS
15F SECTIONAL ELEVATION "C" - TOWER 2
3 C-ELEVATION
CHB WALL SETTING LAYOUT NOTE:
SPOT SECTION
SD-306.2 SCALE 1:75M DETAIL - B
DSI TO COORDINATE WITH OTHER TRADE CONS FOR POSSIBLE
CONFLICT ON RC WALL CONVERSION.
PROJECT TITLE: OWNER: SHEET CONTENT: PROJ. NO. CP-02 NO. REVISIONS DATE SHEET NO.
DRAWN BY : VV 00 CHB WALL SETTING LAYOUT 18 AUG 2023
Design.Saga Inc. ARCHITECT ENGINEER CENTRAL LINK PROJECT FRONTIER HARBOR PROPERTY PROPOSED 15F
DEVELOPMENT INC. CHB WALL CHECKED BY: SG
ARCHITECTURE INTERIOR DESIGN ENGINEERING
PTR. NO. REG. NO. PTR. NO. REG. NO.
CP-02 ARCH'L WORKS FOR PACKAGE 2 (TOWER 1) AND PACKAGE 3 (TOWER 2)
SETTING LAYOUT DSI-SD-306.2H
DATE:
ISSUED AT:
TIN: DATE:

ISSUED AT:
TIN:
BGY. TAMBO PARANAQUE CITY PLAN @ T2 DATE: 08/ 18/ 2023 C
NOTE:
T2 T2 T2 T2 T2 T2 T2 DSI TO COORDINATE WITH OTHER
C D E F G H J
12MMØ VERTICAL REBARS
TRADE CONS FOR POSSIBLE CONFLICT
SLAB
SLAB
ON RC WALL CONVERSION.
SOFFIT
100MM CHB

CHB WALL PARTITION

12mmØ HORIZONTAL
PLASTERING

BARS @ 200 O.C.


12mmØ VERTICAL
TOILET FIXTURES

BARS @ 300 O.C.


TILES W/
ADHESIVE
3000

WALL TILE

25
300

FFL FFL
100 25
12MMØ HORIZONTAL REBARS

1
D-ELEVATION
15F SECTIONAL ELEVATION "D" - TOWER 2
CHB WALL SETTING LAYOUT
SD-306.2 SCALE 1:75M

T2 T2 T2 T2 T2 T2 T2
C D E F G H J
25 50
12MMØ VERTICAL REBARS
SLAB
SOFFIT
SLAB
BEAM BEAM BEAM
BEAM BEAM

25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR
FOR LOP WIRING FOR LOP WIRING FOR LOP WIRING FOR LOP WIRING
& CONDUIT & CONDUIT & CONDUIT & CONDUIT
3000

1300
150
25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR

2400
25MM Ø SLEEVE FOR FOR LOP WIRING FOR LOP WIRING
FOR LOP WIRING & CONDUIT & CONDUIT
& CONDUIT

SUBWALL FOR URINAL


WD-03

RC WALL CONVERSION
800

1100

1100

1100
ZOCALO
300

300

FFL FFL

1500
12MMØ HORIZONTAL REBARS

800
E-ELEVATION
15F SECTIONAL ELEVATION "E" - TOWER 2
CHB WALL SETTING LAYOUT

PIPE CHASE
2

1100
SD-306.2 SCALE 1:75M

T2 T2 T2 T2 T2 T2 T2
J H G F E D C
12MMØ VERTICAL REBARS
SLAB SLAB
SOFFIT SOFFIT

300
BEAM
BEAM BEAM BEAM

25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR


FOR LOP WIRING FOR LOP WIRING FOR LOP WIRING
200

& CONDUIT & CONDUIT & CONDUIT


50

ZOCALO
3054

300
3000
25MM Ø SLEEVE FOR 25MM Ø SLEEVE FOR
2400

FOR LOP WIRING FOR LOP WIRING

ZOCALO
2260

2260

& CONDUIT & CONDUIT


2150

SD-07 SD-07
1100

1100

ELEVATOR

300
L O B B Y

50
FFL FFL

11230 50
12MMØ HORIZONTAL REBARS

F-ELEVATION
15F SECTIONAL ELEVATION "F" - TOWER 2
WATERPROOFING
SECTION
3 CHB WALL SETTING LAYOUT SPOT SECTION DETAIL - D
SD-306.2 SCALE 1:75M DETAIL - C AS PER DSI-RFA-021
RESPONSED FROM PMCSI
PROJECT TITLE: OWNER: SHEET CONTENT: PROJ. NO. CP-02 NO. REVISIONS DATE SHEET NO.
DRAWN BY : VV 00 CHB WALL SETTING LAYOUT 18 AUG 2023
Design.Saga Inc. ARCHITECT ENGINEER CENTRAL LINK PROJECT FRONTIER HARBOR PROPERTY PROPOSED 15F
DEVELOPMENT INC. CHB WALL CHECKED BY: SG
ARCHITECTURE INTERIOR DESIGN ENGINEERING
PTR. NO. REG. NO. PTR. NO. REG. NO.
CP-02 ARCH'L WORKS FOR PACKAGE 2 (TOWER 1) AND PACKAGE 3 (TOWER 2)
SETTING LAYOUT DSI-SD-306.2H
DATE:
ISSUED AT:
TIN: DATE:

ISSUED AT:
TIN:
BGY. TAMBO PARANAQUE CITY PLAN @ T2 DATE: 08/ 18/ 2023 D