You are on page 1of 7

DESIGN, CONSTRUCT, COMMISSION AND HAND

OVER OF SEWAGE TREATMENT PLANT PHASE 2


MODULE 3 - 7,300 PE (ULTIMATE CAPACITY 22,000
PE) AND ASSOCIATED WORKS ON LOT 1993-2005,
2297-2334 & 262 AT ZONE A, BANDAR UDA UTAMA
MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR
DARUL TAKZIM.

FOR UDA LAND (SOUTH) SDN BHD

S.B.B.U SDN. BHD.


Wisma S.B.B.U, No. 1
Jalan Padi Mahsuri 12,
SBBU
s d n b h d
Bandar Baru UDA,
81200, Johor Bahru
Johor Darul Takzim
(Company No.23298-K) Tel. No.: 07-237 4944 Fax: 07-237 4943
SLUDGE HOLDING TANK 07-238 2467

MH1 MH2

1845

ANOXIC TANK

"I hereby certify that these works have been designed by me in accordance with sound engineering practice and that I take
full responsibility for the design and performance of the same."

OVERALL LAYOUT PLAN


(7300 PE)

HYDRAULIC PROFILE FOR THE PROPOSED SYSTEM

BUU/2024/PTP/MNA/MQ- 01 00

SUBMISSION
EXISTING ADMINISTRATION BUILDING

SECONDARY SCREEN CHAMBER, AERATED GRIT & GREASE CHAMBER

SECTION A- A
INCOMING CHAMBER, PRIMARY SCREEN CHAMBER, BLOWER ROOM
WET WELL & DRY WELL

DESIGN, CONSTRUCT, COMMISSION AND HAND


OVER OF SEWAGE TREATMENT PLANT PHASE 2
MODULE 3 - 7,300 PE (ULTIMATE CAPACITY 22,000
PE) AND ASSOCIATED WORKS ON LOT 1993-2005,
2297-2334 & 262 AT ZONE A, BANDAR UDA UTAMA
MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR
DARUL TAKZIM.

FOR UDA LAND (SOUTH) SDN BHD

ANOXIC TANK AERATION TANK


SECTION B - B

S.B.B.U SDN. BHD.


Wisma S.B.B.U, No. 1
Jalan Padi Mahsuri 12,
SBBU
s d n b h d
Bandar Baru UDA,
81200, Johor Bahru
Johor Darul Takzim
(Company No.23298-K) Tel. No.: 07-237 4944 Fax: 07-237 4943
07-238 2467

300 300
750 1500

475

400 500

500
150

1200

2150
700

400

4750

3825

950

1000
GRAVITY SLUDGE THICKENER

300
6355 2600 6355

GRAVITY SLUDGE THICKENER 15300 300


300 SECTION L - L

SLUDGE RETURN TANK


SECONDARY CLARIFIER

SECTION T1-T1

SECTION T1-T1

CHLORINATION DOSING UNIT


"I hereby certify that these works have been designed by me in accordance with sound engineering practice and that I take
full responsibility for the design and performance of the same."

SCHEMATIC FLOW DIAGRAM (7,300PE)

EXISTING SLUDGE DRYING BED & SLUDGE STORAGE YARD


SLUDGE HOLDING TANK
DISINFECTION CHAMBER

BUU/2024/PTP/MNA/MQ- 02 00

SUBMISSION
B

NEW
SCADA
ROOM

NEW
SCADA
ROOM

A A

EXISTING EXISTING EXISTING EXISTING


PRIMARY INCOMING PRIMARY INCOMING
SCREEN CHAMBER SCREEN CHAMBER
CHAMBER CHAMBER

NEW EXISTING EXISTING EXISTING NEW EXISTING EXISTING EXISTING


CONTROL CONTROL PUMP SUMP PUMP SUMP CONTROL CONTROL PUMP SUMP PUMP SUMP
PANEL ROOM PANEL ROOM (DRY WELL) (WET WELL) PANEL PANEL (DRY WELL) (WET WELL)
DESIGN, CONSTRUCT, COMMISSION AND HAND
GROUND FLOOR PLAN FIRST FLOOR PLAN OVER OF SEWAGE TREATMENT PLANT PHASE 2
MODULE 3 - 7,300 PE (ULTIMATE CAPACITY 22,000
PE) AND ASSOCIATED WORKS ON LOT 1993-2005,
B 2297-2334 & 262 AT ZONE A, BANDAR UDA UTAMA
MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR
DARUL TAKZIM.

FOR UDA LAND (SOUTH) SDN BHD

S.B.B.U SDN. BHD.


Wisma S.B.B.U, No. 1
Jalan Padi Mahsuri 12,
SBBU
s d n b h d
Bandar Baru UDA,
81200, Johor Bahru
Johor Darul Takzim
(Company No.23298-K) Tel. No.: 07-237 4944 Fax: 07-237 4943
07-238 2467

SECTION B - B
SECTION A- A

"I hereby certify that these works have been designed by me in accordance with sound engineering practice and that I take
full responsibility for the design and performance of the same."

EXISTING CONTROL PANEL (14,700 PE)


EXISTING PUMP SUMP (WET WELL)
NEW CONTROL PANEL EXISTING EXISTING PUMP SUMP (DRY WELL)
ROOM NEW EXISTING EXISTING EXISTING EXISTING
PRIMARY NEW CONTROL PANEL (7,300 PE)
CONTROL CONTROL PUMP SUMP PUMP SUMP INCOMING
SCREEN
SIDE ELEVATION PANEL ROOM PANEL ROOM (DRY WELL) (WET WELL) CHAMBER
CHAMBER
FRONT ELEVATION

BUU/2024/PTP/MNA/MQ- 03 00

SUBMISSION
DESIGN, CONSTRUCT, COMMISSION AND HAND
OVER OF SEWAGE TREATMENT PLANT PHASE 2
MODULE 3 - 7,300 PE (ULTIMATE CAPACITY 22,000
PE) AND ASSOCIATED WORKS ON LOT 1993-2005,
2297-2334 & 262 AT ZONE A, BANDAR UDA UTAMA
MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR
DARUL TAKZIM.

EXISTING AERATED EXISTING AERATED EXISTING FOR UDA LAND (SOUTH) SDN BHD

GRIT CHAMBER GREASE CHAMBER DISTRIBUTION


CHAMBER
EXISTING SECONDARY
SCREEN CHAMBER S.B.B.U SDN. BHD.
Wisma S.B.B.U, No. 1
Jalan Padi Mahsuri 12,
SBBU
s d n b h d
Bandar Baru UDA,
81200, Johor Bahru
Johor Darul Takzim
(Company No.23298-K) Tel. No.: 07-237 4944 Fax: 07-237 4943
07-238 2467

"I hereby certify that these works have been designed by me in accordance with sound engineering practice and that I take
full responsibility for the design and performance of the same."

EXISTING SECONDARY SCREEN CHAMBER


EXISTING AERATED GRIT CHAMBER
EXISTING AERATED GREASE CHAMBER
EXISTING DISTRIBUTION CHAMBER
EXISTING AERATED GRIT CHAMBER EXISTING AERATED GREASE CHAMBER
EXISTING SECONDARY EXISTING
SCREEN CHAMBER DISTRIBUTION
CHAMBER
SECTION S-S BUU/2024/PTP/MNA/MQ- 04 00

SUBMISSION
GRAVITY SLUDGE THICKENER TANK

SLUDGE HOLDING TANK GRAVITY SLUDGE THICKENER


N
N SLUDGE HOLDING TANK
SECTION N - N

DESIGN, CONSTRUCT, COMMISSION AND HAND


OVER OF SEWAGE TREATMENT PLANT PHASE 2
MODULE 3 - 7,300 PE (ULTIMATE CAPACITY 22,000
PE) AND ASSOCIATED WORKS ON LOT 1993-2005,
2297-2334 & 262 AT ZONE A, BANDAR UDA UTAMA
MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR
ANOXIC TANK DARUL TAKZIM.

FOR UDA LAND (SOUTH) SDN BHD

SECTION C - C

S.B.B.U SDN. BHD.


Wisma S.B.B.U, No. 1
Jalan Padi Mahsuri 12,
SBBU
s d n b h d
Bandar Baru UDA,
81200, Johor Bahru
Johor Darul Takzim
(Company No.23298-K) Tel. No.: 07-237 4944 Fax: 07-237 4943
07-238 2467

PLAN VIEW FRONT VIEW

SIDE VIEW
"I hereby certify that these works have been designed by me in accordance with sound engineering practice and that I take
full responsibility for the design and performance of the same."

DETAIL OF SUPPORT BRACKET


AERATION TANK (7,300 PE)
LAYOUT PLAN & CROSS SECTION

ANOXIC TANK AERATION TANK


SECTION B - B BUU/2024/PTP/MNA/MQ- 05 00

SUBMISSION
300 300
750 1500

300

475
150
3000

4450

3825
300
300 1500 300

300
SLUDGE RETURN PUMP SUMP
SECTION J - J

900
1845

DESIGN, CONSTRUCT, COMMISSION AND HAND


OVER OF SEWAGE TREATMENT PLANT PHASE 2
300 3000 300
MODULE 3 - 7,300 PE (ULTIMATE CAPACITY 22,000
DISINFECTION CHAMBER PE) AND ASSOCIATED WORKS ON LOT 1993-2005,
2297-2334 & 262 AT ZONE A, BANDAR UDA UTAMA
MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR
DARUL TAKZIM.

FOR UDA LAND (SOUTH) SDN BHD

4500
300

300
300 S.B.B.U SDN. BHD.
300

3000
0

0 300 300 Wisma S.B.B.U, No. 1


150 Jalan Padi Mahsuri 12,
SBBU Bandar Baru UDA,
300

300 81200, Johor Bahru


s d n b h d Johor Darul Takzim
SECTION K - K (Company No.23298-K) Tel. No.: 07-237 4944 Fax: 07-237 4943
07-238 2467

DISINFECTION CHAMBER
LAYOUT PLAN
SECTION T-T

300 300
750 1500

150

25 25

500

400

250
700
475

400 500

500

SECTION N - N
150

1200

SECTION 1-1
2150

700

400
4750

3825

950

500
400
N N
1000

400
400
300

700 "I hereby certify that these works have been designed by me in accordance with sound engineering practice and that I take
150 150
full responsibility for the design and performance of the same."
6355 2600 6355 CROSS SECTION FOR CLARIFIER COLUMN
CROSS SECTION FOR CLARIFIER COLUMN
15300 300
300 SECTION L - L
SECONDARY CLARIFIER (7300 PE)
DISINFECTION CHAMBER &
LAYOUT PLAN & CROSS SECTION

BUU/2024/PTP/MNA/MQ- 06 00

SUBMISSION
1 2 3 4

A A
3 2 1 4

A
A

B B

B DESIGN, CONSTRUCT, COMMISSION AND HAND


B OVER OF SEWAGE TREATMENT PLANT PHASE 2
MODULE 3 - 7,300 PE (ULTIMATE CAPACITY 22,000
PE) AND ASSOCIATED WORKS ON LOT 1993-2005,
BLOWER ROOM BLOWER ROOM 2297-2334 & 262 AT ZONE A, BANDAR UDA UTAMA
( 1ST AND 2ND MODULE ) ( 3RD MODULE ) MUKIM PULAI, DAERAH JOHOR BAHRU, JOHOR
BLOWER ROOM
( 3RD MODULE ) DARUL TAKZIM.

BLOWER ROOM
ROOF PLAN FOR UDA LAND (SOUTH) SDN BHD
( 1ST AND 2ND MODULE )

FLOOR PLAN

S.B.B.U SDN. BHD.


1 2 3 4 Wisma S.B.B.U, No. 1
Jalan Padi Mahsuri 12,
SBBU
s d n b h d
Bandar Baru UDA,
81200, Johor Bahru
Johor Darul Takzim
(Company No.23298-K) Tel. No.: 07-237 4944 Fax: 07-237 4943
B A 07-238 2467

BLOWER ROOM BLOWER ROOM


( 1ST AND 2ND MODULE ) ELEVATION A ( 3RD MODULE )

ELEVATION B
"I hereby certify that these works have been designed by me in accordance with sound engineering practice and that I take
full responsibility for the design and performance of the same."

ADMIN BUILDING
LAYOUT PLAN & ROOF PLAN
BLOWER ROOM
LAYOUT PLAN & ROOF PLAN

BUU/2024/PTP/MNA/MQ- 07 00

SUBMISSION