Professional Documents
Culture Documents
2.To organized
work rotation
3.Conduct Tool
Box Talk on
manual handling
hazard and
control prior to
formwork
fabrication
4.Wear
appropriate PPE
3.Work must be
carried out by
trained personnel
4.Conduct Tool
Box Talk on
excavation safety
prior to
excavation work
5.Wear
appropriate PPE
2.Conduct Tool
Box Talk on cut
hazard and
control prior to
pile cap re-bar
installation
3.Wear
appropriate PPE
2.Excessive 2.Potential to
1.To organized 3 3 9
manual handling sustain body injury
work rotation
2.Work must be
carried out by
trained personnel
3.Never lift heavy
load alone, seek
assistance from
other
4.Conduct Tool
Box Talk on
manual handling
work and control
prior to manual
handling work
5.Wear
appropriate PPE
j. Manual pile cap 1.Expose to 1.Potential to 1.Work must be
concrete work contact with wet cause leg injury carried out by 4 2 8
cement mixture trained personnel
2.Conduct Tool
Box Talk on
concreting safety
prior to concrete
work
3.Wear
appropriate PPE
2.Excessive 2.Potential to 1.To organized
work rotation 3 3 9
manual sustain body
handling injury 2.Work must be
carried out by
trained personnel
4.Conduct Tool
Box Talk on
manual handling
work and control
prior to manual
handling work
5.Wear
appropriate PPE