You are on page 1of 10

M & V Report

Measurement and Verification Report


February 2024

Integrar

Qatar

Qatar

© Accuenergy (Canada) Inc. 2024

Reports by Acucloud, Facility Energy Metering Platform


© Accuenergy (Canada) Inc.
M & V Report

Executive Summary

M&V Methodology:
IPMVP Option B
Energy Avoided/year
Baseline Period: 0 kWh
February 01, 2024 - February 06, 2024

ECM period:
Invalid date - Invalid date
Savings/year
Reporting Period: $0
Invalid date - Invalid date

Routine Adjustments:
Payback Period
Non-Routine Adjustments: 0 Year

Consumption before and after ECM


Consumption (kWh )

No data

Reports by Acucloud, Facility Energy Metering Platform


© Accuenergy (Canada) Inc.
M & V Report

Project Definition
Name:

Qatar

M&V Methodology:

IPMVP Option B: Retrofit Isolation / All Parameter Measurement


Savings are determined by field measurement of the energy use of the ECM-affected system.
Measurement frequency ranges from short-term to continuous, depending on the expected variations
in the savings and the length of the reporting period.

Electricity Price:

0.08 $/kWh

Cost:

$200.00

Description:

N/A

Reports by Acucloud, Facility Energy Metering Platform


© Accuenergy (Canada) Inc.
M & V Report

Baseline Period
Times:

February 01, 2024 - February 06, 2024

Baseline Period - Energy Data

Consumption (kWh )
15

12

0
00:00 03:00 06:00 09:00 12:00
Feb 1, 2024 Feb 2, 2024 Feb 3, 2024 Feb 4, 2024 Feb 5, 2024

Description:

N/A

Reports by Acucloud, Facility Energy Metering Platform


© Accuenergy (Canada) Inc.
M & V Report

Reporting Period
Times:

null - null

Reporting Period - Energy Data

Consumption (kWh )

No data

Description:

N/A

Reports by Acucloud, Facility Energy Metering Platform


© Accuenergy (Canada) Inc.
M & V Report

Energy Conservation Measures


No ECM specified

Reports by Acucloud, Facility Energy Metering Platform


© Accuenergy (Canada) Inc.
M & V Report

Routine Adjustments
No routine adjustments specified

Reports by Acucloud, Facility Energy Metering Platform


© Accuenergy (Canada) Inc.
M & V Report

Non-Routine Adjustments
No non-routine adjustments specified

Reports by Acucloud, Facility Energy Metering Platform


© Accuenergy (Canada) Inc.
M & V Report

Models
The model is used to predict the consumption for the case that the consumption profile of the baseline
period had continued. A good model will have a high R² value. On the graph, a good model will have values
displayed close to the dashed line which represents the optimal prediction.

Description:

Reports by Acucloud, Facility Energy Metering Platform


© Accuenergy (Canada) Inc.
M & V Report

Savings
Consumption before and after ECM
Consumption (kWh )

No data

Estimated annualized consumption without ECM:

0 kWh ($0)

Annualized actual consumption:

0 kWh ($0)

Savings/year:

0 kWh ($0)

Payback Period:

0 Year

Reports by Acucloud, Facility Energy Metering Platform


© Accuenergy (Canada) Inc.

You might also like