You are on page 1of 1

BIM BIM Maturity

Building Information Modeling


• Central source of shared knowledge of LEVEL 0 - CAD
an asset from design through LEVEL 1 - 2D & 3D (CAD Draftings & Models)
construction and into operation. LEVEL 2- 4D & 5D (Time Management &
• Started 1963 Budget Allocation)
• Ivan Sutherland LEVEL 3 - 6D (Building Admin Manager)
• SketchPad as a drawing assistant
• 1970 BIM concepts were born Level of Development
• 1984 first implementation (level of details: LoD)
• ArchiCAD first before REVIT (level of information: LOI)
• 1987 Radar CH renamed as ArchiCAD
100 - Concept Design
• 2000 Revit (Revise Instantly)
200 - Schematic Design
300 - Detailed Design
350 - Construction Documentation
Construction Challenges
400 - Fabrication & Assembly
500 - As-Built
1. Inefficiency
2. Poor Coordination
3. Poor value for money
4. Lack of understanding
5. Reluctance to change
6. Lack of proper planning
7. Poor decision making
8. Lack of mediation

Benefits

1. 3D coordination
2. Clash detection
3. Construction simulation
4. Cost estimation
5. Energy analysis
6. Lighting analysis
7. Wind analysis
8. Mechanical analysis
9. Structural analysis
10. Building systems analysis

Evolution of BIM Maturity

1. Hand drafting
2. CAD
3. BIM

You might also like