You are on page 1of 1

Assignment Name: Country:

220KV Tarbela Burhan Twin Bundle Transmission Line Pakistan


Using Low Loss ACSR Conductor
Location within Country: Professional Staff Provided by Form
Islamabad, Punjab Firm:

Name of Client: No. of Staff: Not Available


National Transmission and Despatch Company Limited
(NTDCL)
Address of Client: No. of Staff Months:
Chief Engineer (EHV-I), North Islamabad, WAPDA Mega N/A
Hydel Projects, Kashmir Chowk, Islamabad Phone:051-
9214564, Email: ceehvisd@ntdc.com.pk
Start Date of Services: Completion Date:
Approximate Values of Services:
(month, Year) (month, Year)
May 2019 In Progress PKR 114 Million
Name of Associated No. of Months of Professional
Firm(s), if any: Staff Provided by Associated
Firm(s):
Newjec Japan
18%
Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
- General Manager/Head (Transmission): Shakir Hafeez
- General Manager Design (Civil): Muhammad Ikram Latif Wain
- Chief Engineer: Khursheed Ahmed
- Design Expert: Tanvir Ahmed
- Contracts Expert: Abdul Manan
- Senior Transmission Line Design Engineer: M. Shoaib Khalid
Narrative Description of Project:
The scope of the project includes review of Existing Data, Detailed Design, Tendering,
Procurement, Construction Supervision, Implementation of Environmental Management Plan
(EMP) & Environmental Monitoring Plan (EMoP), Technology Transfer, Testing & Commissioning of
220KV Tarbela Burhan Twin Bundle Transmission Line using Low Loss ACSR Conductor.
Description of consultancy Services (TOR) Provided by Your Firm:
NESPAK services include:
Phase-I: Review of Existing data and studies, Preparation of Design, Preparation of Bidding
Documents including Bid Level Drawings, Evaluation of Bids and Assistance during Award of
Contract
Phase-II: Review of Design/Drawings, Construction Supervision, Contract Management,
Verification of Contractor’s Invoices and Testing & Commissioning of the Project with services
during Defect Liability Period.