You are on page 1of 5

RESUME

Kameswara Rao.Ankadala Kamesh004.ankadala@gmail.com


Sr. Project Manager/ Signalling Ph. no +91 8143660660

Key Qualifications:

Kameswara Rao.Ankadala is BE (ELECTRONICS AND INSTRUMENTATION) having 13 years of expertise in


Design Review, Installation, Testing & Commissioning, integrating various subsystems, Trouble shooting,
Monitoring, Budgeting and Project Management in Projects like SSI, CBI(DFCC) and CBTC SIGNALING &
TRAIN CONTROL System.

Additional Training:
• Basic Signalling Technology (BST) containing: Tracks, Points, Signals, Train detection, Relay & SSI
Interlocking.
• Basic Concepts of Siemens System (Siemens India Pvt Ltd, India, 2012).
• Train Detection and Track Circuits
• Micro Station V8i
• Auto-CAD 2012
• MS Projects
• PMP 35’ PDU completed

PROFESSIONAL CERTIFICATIONS
• Basic Concepts of Signalling from e2E Rail Group
• Auto-cad & Micro station from e2E Rail Group
• Signalling Designs & Principles from e2E Rail Group

Management Record:

1. Monitoring work progress in all sites with the DPR’s sent by site in charge daily
2. Budget preparation, Scheduling, monitoring and control of execution activities in MS Projects
3. Analyzing and processing fund requests on weekly, monthly basis and providing clearance to
finance department to clear the payments to sub-contractors, service providers and others in
relation to execution works
4. Sub-contractors quotation analysis through comparative statements, finalization and order
processing for local purchase of material required for execution
5. Advance bill settlement for site payments and other advances
6. Placing purchase request for material to Supply Chain Management(SCM) team in case the
material is not available at local or not cheaper to procure locally
7. Monitoring activities in, tracking SCM team & site team on purchase request whether the
consignment is processed on time, material is dispatched on time to site and is the site team
issuing GRN as an acknowledgement for all the consignments received.
8. Preparing monthly, quarterly and annual sales and targets
9. Presenting to the higher management at Head Quarters (HQ) on the project status enabling
them to make high level decisions on the project.
10. Ensuring the working procedures in compliance with contract agreement
11. Interfacing with Project management Consultant (PMC) and Client at site
RESUME

Kameswara Rao.Ankadala Kamesh004.ankadala@gmail.com


Sr. Project Manager/ Signalling Ph. no +91 8143660660
12. Ensuring resources at site to execute activities at target achievable pace.
13. Ensuring zero defect liability possible through proper planning
14. Risk assessment and subsequent action planning.
15. Cost analysing and Tender supporting, Pre bid meeting attending, Tender document Preparing
16. As per Project vender list preparing.

Achievement Till Date :IR main line Double line and 3rd line total till date CRS and commissioining
STNs 27 no,DFCC-12 STNs, Metro -Hyderabad -11 STNs and one Depot,Chennai -4STNs and one Depot,
Mumbai line one -10 STNs and one Depot, bangalore and nagpur worked but commissioining not done
.

Employment Record:

Company Name: Angelique International Limited

Name of Assignment: Sr. Project Manager for 21 STNs indoor works (350km).

Year: July-2021 to till date

Location: Vijayawada-gudivada Jn,

Gudivada Jn-Machilipatnam,

Gudivada Jn-Bhimavaram Jn

Bhimavaram Jn-Narasapur Jn

Bhimavaram Jn-Nidadavaovlu Jn

Client: RVNL

Main Project Features: Material management, installation, testing, commissioning, interface meetings,
RA Billing, subcontractor cost reviews and finalizing, installation planning, Drawing review.

Achievement:13 STN (NS,PKO,VVM,VVM,PAGM,BVRM,AVLI,AL,TNK,KLDI,NDD,NDM,RMV),completed


in 10 months of time duration.

Company Name: MCL

Name of Assignment: Project Manager for BTTR-KRV 3rd line PKG-2, 98 TKM Project.

Year: Sep 2020 to July -2021

Location: Kavali /AP

Client: RVNL
RESUME

Kameswara Rao.Ankadala Kamesh004.ankadala@gmail.com


Sr. Project Manager/ Signalling Ph. no +91 8143660660
Main Project Features: Material management, installation, testing, commissioning, interface meetings,
RA Billing, subcontractor cost reviews and finalizing.

Achievement: 4STN (SVPM,KVZ,TTU,UPD) , 24 LC interlocking gates and 4 IBH completed in 10 months


of time duration.

Company Name: Kalpataru group

Name of Assignment: Project Manager for MDU-TN 150 KM Project.

Year: Jun 2019 Sep 2020

Location: Madurai

Client: RVNL

Main Project Features: installation, testing, commissioning, interface meetings, RA Billing, subcontractor
cost reviews and finalizing.

Achievement: 3STN (TIP,MEJ,KDU) and 11 LC interlocking gates completed 12 months of time duration.

Company Name: JMDR/TEXMACO

Name of Assignment: Project manager for KOL Metro Project, Haldia Dock Project and DFCC

Year: may 2018 to Jun 2019

Location: Kolkata and Tundala

Client: RVNL/DFCC

Main Project Features: installation, testing, commissioning, interface meetings, RA Billing, subcontractor
cost reviews and finalizing.

Position Held:

1) Looking into complete drawings.


2) Indoor and outdoor equipment’s installation -marking, Excavation, foundation, Erection, wiring
testing and commissioning.
3) Project Planning –Budgeting, costing, and daily monitoring, weekly and monthly as per schedule
items.
4) Client meeting, subcontractor inter face, Billing – monthly-sale and cost.
5) Team planning as per site condition
RESUME

Kameswara Rao.Ankadala Kamesh004.ankadala@gmail.com


Sr. Project Manager/ Signalling Ph. no +91 8143660660
Name of Assignment: Installation, Testing &Commissioning of signalling works as per client Thales Pvt.Ltd
for Hyderabad Metro Rail Project and Mumbai Metro line one ,O&M 51 Stations Eco-Railway MLK –II
System .

Company Name: E2e rail group

Year: 07/2010 to 2018-Jun

Location: Hyderabad,Mumbai,vizag to Bhubaneswar

Client: Ansaldo STS/HMRCL-Thales/Siemens

Main Project Features: Testing & Commissioning.

Position Held: GET to Project Manager

Activity Performed:

• Testing of point machine interface circuits and detection circuits.


• Fine tuning of axle counter and testing of preparatory rest & hard reset of axle counter.
• Proper execution of PICO tests, field correspondence test, integration testing and site acceptance
test(SAT)
• Hands on experience in testing and troubleshooting of ZC, FEC, ACE, DCS(Digital Command System),
ATS(Automatic Train Supervision), IM.
• Testing of Testing of Platform Emergency Stop Button(PESB) circuits.
• Radio survey for wayside radio unit installation.
• Setting for normal operation of passive transponders(Tag master)
• Testing of interface circuits of all signal lighting circuits.
• Interlocking CBTC
• Interface circuits and detection circuits.

Activity Performed:

Leading the Testing team of all Signalling Outdoor Equipment’s like

• Point Machines.
• MACL Signals.
• Fine tuning of axle counter and testing of preparatory rest & hard reset of axle counter.
• Verifying the marking according to SIP.

Achievements:

• As a Site engineer for Thales ETCS project installation and T&C of signalling works is completed as per
client Thales Pvt. Ltd, requirement it is closed within 4 months (10th September 14 to 10th January 15)
of 21kms from Hyd-Metro interlocking station