ADB-301A-2018
Design, Supply, Installation, Testing & Commissioning of 500kV D/C Quad Bundle Transmission Line Nokhar S/s-Lahore North S/S-Lahore HVDC Switching/Convertor Station
(Job# 4185)
SECTION NO 1 SECTION NO 2
Cumulative Progress Section no 1&2 as on Today
Activity Nokhar Sustation To Lahore North Sub station Lahore North Sub staion - HVDC Converter Station
Qty %
Total Daily Progress This Day This Month To Date Total Daily Progress This Day This Month To Date Grand Total Weightage Total Progress
Completed Completed
CONDUCTOR SAGGING
CONDUCTOR CLIPPING
20% 19.92%
JUMPER INSTALLATION
SHIELDWIRE PULLING
& 44.644 44.115 68.374 68.23 113.018 112.345 99.40
SHIELDWIRE SAGGING
OPGW PULLING &OPGW
SAGGING 44.644 44.566 68.374 68.35 113.018 112.916 99.91
RECTIFICATION OF PUNCH TOWER # 165-203 has been rechecked by GSO Team after
LIST
132 132 203 203 335 335.000 100.00
rectfication by Contractor.
1. ACDs, Barbid wire, Phase & Danger Plates are Installed from T# 1- 1. ACDs, Barbid wire, Phase & Danger Plates are Installed from
132 Except Tower # 01 (grid) & 66, 68 due to ROW. Tower# 1-203 Except Tower # 35,173 Due to ROW.
MISC ITEMS 132
2. Aerial Marking Plates are Instatlled on all specified Located
129 203
2. Aerial Marking Plates are Instatlled on all specified Located
201 335 330 98.51
Towers. Towers.
OVERALL
99.82%
PROGRESS
PUNCH PUNCH TOWER # 165-203 has been rechecked by GSO Team after
LIST LIST rectfication by Contractor.
NOTE: THE LINE IS ENERGIZED ON NO LOAD THROUGH AN INTERM ARRANGEMENT AT UNDER CONSTRUCTION LAHORE NORTH SUB STATION. MEANS BY PASSING THE MENTIONED SUB STATION