ENGINEERING SERVICES JOB SPECIFICATION FOR DATE

OF
INDIAN OIL LIQUID JET EJECTOR REV.
CORPORATION LTD.
PROJECT: AVIATION 07.02.24
PARADIP REFINERY GASOLINE PROJECT

JOB SPECIFICATION

FOR

LIQUID JET EJECTOR

Page 1 of 5
ENGINEERING SERVICES JOB SPECIFICATION FOR DATE
OF
INDIAN OIL LIQUID JET EJECTOR REV.
CORPORATION LTD.
PROJECT: AVIATION 07.02.24
PARADIP REFINERY GASOLINE PROJECT

1.0 GENERAL:

This section includes all the Requirements, which are specific to the subject Ejector
that are to be purchased against the referred enquiry. Bidder must read all the
provisions of this section carefully, in conjunction with the other sections of the
referred enquiry, and accordingly prepare the quote.

2.0 SCOPE OF SUPPLY:

2.1 Equipment -
Design, manufacturing, testing and supply of liquid jet ejector , spares and
complete final documentation comprising of general arrangement drawings, Fabrication
drawings and inspection certificates as mentioned in the attached specifications and data
sheets, and sketches.

2.2 Deliverables –

a) All documents shall be compiled in Folders of good quality. Six such Folders shall
be mailed directly to Chief Engineering Services Manager, Engineering Services,
IOCL, Paradip Refinery, Odisha

3.0 DOCUMENTS REQUIRED IN OFFER

The vendor’s proposals shall as a minimum include the following:

In Technical bid.

(a) Signed and stamped copy of all tender documents provided by IOCL.

(b) List of spares (Refer attached list of required spares.).

(c) An itemised list of special tools including in the offer. (If any it should be within the
quoted date of main equipment)

(d) Any start-up, shutdown or operating restrictions required to protect the integrity of the
equipment.

(e) List of deviations/exceptions to the enquiry document. Deviation shall be listed


separately for each document with cross reference to Page No./ Section/ Clause
No./Para etc. of the respective document supported with proper reasons for the
deviation for purchaser’s consideration. Any deviation not listed under the above section,
even if reflected in any other portion of the proposal shall not be considered applicable.
No deviation or exception shall be permitted without the written approval of the
purchaser.

Page 2 of 5
ENGINEERING SERVICES JOB SPECIFICATION FOR DATE
OF
INDIAN OIL LIQUID JET EJECTOR REV.
CORPORATION LTD.
PROJECT: AVIATION 07.02.24
PARADIP REFINERY GASOLINE PROJECT

(f) A specified statement that the scope of supply, the offered equipment/ systems and all
its components are in strict accordance with the data sheets, Tech specifications, this
specifications and all other attachments, except for specific deviations as listed in the
proposal.

(g) Confirmation on Guaranty/Warranty. (Should be min 12 months from date of


commissioning/ 18 months from date of dispatch whichever is earlier)

4.0 CONTRACT DATA

On successful award of contract Bidder shall furnish the following documents for approval of
IOCL within two weeks of issue of LOA/FOA/LOI.

a) General Arrangement Drawing. A general arrangement drawing shall indicate:


i) Outline dimensions (minimum three views) (All principle dimensions).
ii) Location (in all three planes), size, type, rating and identification of all
purchasers’ interface connections
iii) Total weight
iv) A list of any special weather-protection and climatic features & Painting
details.
v) Design/operating data, Details about standards followed, Special notes etc.
vi) Panels, Junction box, load cell details with make model no.

a) Quality assurance policy indicating name of TPIA.

b) List of spares as per given job specification.

c) Project progress plan and timely update of project execution report.

d) Name plate drawings with standard details.

5.0 NOTES AND ADDITIONAL TECHNICAL DATA

MACHINE DATA SHEET

1.0 Suction Condition

1.1 Suction Fluid Liquid TEL (Tetra Ethyl Lead)


1.2 Suction Liquid Density 1750 Kg/m3
1.3 Suction Liquid Pressure 0.3 bar (a)/ 300 mbar Vaccumm
1.4 Suction Liquid Temp. Ambient
1.5 Suction Liquid Flow rate - max. 4672 Kg/hr
1.6 Suction Liquid connection [N1] 50 NB [2”]
1.7 Viscocity at 20Deg C 0.99 cP
2.0 Motive Condition
2.1 Motive Fluid Liquid Gasoline
Page 3 of 5
ENGINEERING SERVICES JOB SPECIFICATION FOR DATE
OF
INDIAN OIL LIQUID JET EJECTOR REV.
CORPORATION LTD.
PROJECT: AVIATION 07.02.24
PARADIP REFINERY GASOLINE PROJECT

2.2 Motive Liquid density 700 Kg/m3


2.3 Motive Liquid pressure 9 bar (a)
2.4 Motive Liquid Temperature Ambient
2.5 Motive Liquid quantity required 7000 Kg/hr
2.6 Motive Liquid connection [N2] 50 NB [2”]
2.7 Viscocity at 25 Deg C 5 to 6 cP

3.0 Discharge Condition


3.1 Discharge fluid Mixture of Liq. Gasoline + Liq. TEL
3.2 Discharge Liquid pressure required 2.0 bar (a)
3.3 Discharge Liquid temperature Ambient
3.4 Discharge Liquid flow rate 11672 Kg/hr
3.5 Discharge Liquid Connection [N3] 50 NB [2”]

4.0 Design Codes followed [latest Editions] Thermal: HEI


Pressure Vessel Cal.: ASME Sec VIII div I
4.1 Codes followed for performance testing HEI / ASME PTC 24
4.2 Radiography / Joint efficiency Spot / 85%
4.3 Corrosion allowance Nil on SS

5.0 Mech. Design Condition


5.1 Liquid Jet Liquid Eductor
5.1.1 Design Pressure 10 bar (g) / FV
5.1.2 Design Temperature 100° C
5.1.3 Hydro test pressure 15 bar (g)

6.0 MATERIAL OF CONSTRUCTION

7.0 DELIVERABLES

All approved documents, Testing/inspection documents, TPI release note; maintenance


manual, Records of all NDT test procedures and examinations, shall be compiled in Folders of
good quality. Six such Folders shall be mailed directly to Chief Engineering Services Manager,
Engineering Services, IOCL, Gujarat Refinery, Koyali, Vadodara. This is within scope of supply of
bidder within the quoted price of equipment.

8.0 SPARES
Page 4 of 5
ENGINEERING SERVICES JOB SPECIFICATION FOR DATE
OF
INDIAN OIL LIQUID JET EJECTOR REV.
CORPORATION LTD.
PROJECT: AVIATION 07.02.24
PARADIP REFINERY GASOLINE PROJECT

Bidder to provide following mandatory spares. If any of the mentioned items are not applicable in
offered model please mention NA against the same.

S. No. ITEM QTY


1 Gaskets/O-rings/Seals 1 set
2 Bolts 1 Set

Spares part shall be identical in all respects to the parts fitted on the main equipment,
Cost of spare to be included in main equipment cost.

Page 5 of 5
INSPECTION AND TEST REQUIREMENTS FOR EJECTOR
SCOPE
This Inspection and Test Plan covers the minimum testing requirements of Ejectors being procured

2.0 Reference Documents


PO/ PR/ Standards referred therein/ Job specifications/ Approved documents.

SCOPE OF INSPECTION
QUANTUM OF
SL NO STAGE/ ACTIVITY CHARACTERISTICS RECORD
CHECK
SUB IOCL/
SUPPLIER
SUPPLIER TPIA
Chemical, Mechanical, Heat
1.1 Castings & Forgings Treatment, NDT, IGC & Other Each Heat Test Certificate H R R
Properties as applicable

Test Certificates
1.2 Ejector nozzle material Chemical Analysis Each Heat H R R
& Lab Report

Gaskets ,Fasteners,
1.3 Physical/ Chemical Properties 100% MTC H R R
etc.

Inspection
1.4 Machining of components Visual/ Dimension 100% H R R
Reports
100% for SS
1.5 PMI Check of SS components Chemical Inspection Report H W W
components
Test Report/ Approved
1.6 Visual/ Dimension Surface & Dimension Check 100% H W W
drawings
1.7 Performance check Vaccum Generation as per datasheet 100% Test report H W W

Documentation & Inspection Review of Stage Inspection Reports/


1.8 100% Supplier TC & IC H H H
Certificate (IC) Test Reports & Issue of IC

Inspection
1.9 Final Stamping Stamping Of Accepted Ejector 100% H H H
Report

1.2 Acceptance Norms for all the activities shall be as per PO/ PR/ Standards referred there in/ Job specification/ approved documents.
2.0 TPI agency to punch their stamp in accepted materials
Legend: H – Hold (Do not proceed without approval), P – Perform, RW – Random Witness (As specified or 10% (min. 1 no. of each size and type of Bulk item), R – Review, W – Witness
(Give due notice, work may proceed after scheduled date).