Project
Coker -B Revamp Project at IOCL Barauni Refinery
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
PROJECT PROCEDURE
INSTRUCTIONS TO BIDDERS
DOCUMENT REVISIONS
Sections changed in last revision are identified by a vertical line in the margin
This document and the information it contains are property of TECHNIP ENERGIES India Ltd.. It shall not be used for any purpose other than
those for which it was supplied.
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
HOLDs
This document and the information it contains are property of TECHNIP ENERGIES India Ltd.. It shall not be used for any purpose other than
those for which it was supplied.
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
CONTENTS
1. INTRODUCTION 5
1.5 Confidentiality 6
1.6 Costs 6
3.1 Presentation 7
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
3.15 Training 11
3.18 Ethics 12
4. ATTACHMENTS 14
This document and the information it contains are property of TECHNIP ENERGIES India Ltd.. It shall not be used for any purpose other than
those for which it was supplied.
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
1. INTRODUCTION
INDIA OIL CORPORATION LIMITED operates a 6.0 MMTPA refinery at Barauni in the state of Bihar.
In view of the projected demand, IOCL is implementing expansion of Barauni Refinery, from its current
crude processing capacity of 6.0 MMTPA to 9.0 MMPTA. Apart from boosting the crude processing
capacity by 50%, the expansion project will also enable the refinery to produce fuels meeting India’s
Bharat Stage (BS)-VI quality standards.
As part of Barauni Refinery Expansion Project, IOCL intend to augment the capacity of the existing
Coker-B unit from 0.5 MMTPA to 0.662 MMTPA by revamping the unit. Existing Coker-B unit is
designed and licensed by M/s Engineers India Limited, which was originally designed to process Low
Sulphur Reduced Crude Oil (RCO) having low CCR for production of anode Grade Coke.
CDSP Package of Coker-B Unit shall be supplied, erected & commissioned by the CONTRACTOR
as per the scope of works defined in the package
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
PLANT The onshore facilities which shall be constructed and/or modified during the
execution of PROJECT
PO Purchase Order
RFQ Request for Quotation
PROJECT EPCC of Coke Drum Structure Package (CDSP) of Coker -B Revamp
Project at IOCL Barauni Refinery
SITE The location of PLANT.
SUB-SUPPLIER/ means vendor or a contractor engaged by “SUPPLIER” for performance of
this Order and provision of supplies
SUB-CONTRACTOR
1.5 Confidentiality
The information contained in this ITB are confidential and shall not be disclosed to any third party
(other than for the sole purpose of preparing the bid) without the prior written approval of BUYER.
BIDDER should further limit the disclosure of the information contained herein within BIDDER’s
organisation on a need-to-know basis.
BIDDER shall not make any public announcements relating to this ITB without the prior written
consent of BUYER.
1.6 Costs
BIDDER shall cover all costs of preparing and submitting its bid. Accordingly, BUYER will not be
responsible for, nor pay for, any expenses or losses which may be incurred by BIDDER in so doing.
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
To store, and make available to BIDDER, all documents related to this ITB.
To process all ‘requests for clarification’ and ‘bid bulletins/updates’.
To receive BIDDER’s bid.
BIDDER should familiarise itself with EPC-BUSINESS by reading the user manual (this can be
downloaded from within the application).
The use of EPC-BUSINESS is mandatory for all aspects of this ITB. Any bid (or request for
clarification) received outside EPC-BUSINESS will not be considered.
If BIDDER fails to acknowledge the ITB within the specified time, its proposal may not be
considered.
b. BIDDER shall review all documents carefully. It is BIDDER's responsibility to obtain in due time
from BUYER any missing and/or illegible document. Failure to review all documents and instructions
will not be deemed a just cause for a claim.
It has in its possession all the documents listed and/or referred to in the ITB.
It has the intention to submit a bid by the bid due date.
In the event that BIDDER declines to take part in the ITB process, an explanation is kindly requested
in order to improve our future sourcing activities.
3.1 Presentation
BIDDER shall upload its bid in two parts:
This document and the information it contains are property of TECHNIP ENERGIES India Ltd.. It shall not be used for any purpose other than
those for which it was supplied.
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
In the process of this RFQ, BIDDER offers may be revised. BIDDER shall use a tracking system
to clearly identify all the modifications from one revision to another
[Note that the unpriced copy must be identical to the Priced copy, with only the prices hidden]
Any Technical and/or Commercial exceptions taken by BIDDER must be made using the
“Deviation Log” (ATTACHMENT C, with separate worksheets for technical and commercial
issues).
D
If BIDDER simply attaches its own Terms & Conditions with no explanation of the exceptions
taken, they will not be taken into consideration. BIDDER must indicate the specific exceptions taken
to the ITB documents/requirements.
Any exceptions which are not made strictly in accordance with these instructions will not be
entertained at a later date.
DThis document and the information it contains are property of TECHNIP ENERGIES India Ltd.. It shall not be used for any purpose other than
those for which it was supplied.
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
For SUPPLY manufactured, inspected and delivered in India: FCA SUPPLIER Workshop with an
optional price for DAP to IOCL BARAUNI, BIHAR SITE
For SUPPLY manufactured, inspected and delivered out of India: FCA SUPPLIER’s workshop,
options:
o for FOB to the closest International Port from the SUPPLIER workshop) and
o for CFR Kolkata / Haldia Port, India.
The delivery terms shall be in accordance with INCOTERMS 2020. BIDDER shall price for both
cases.
Goods shall be preserved, packed, marked and made available to BUYER in accordance with the
document: “Packing, Marking and Shipping Instructions”.
With its bid, BIDDER shall provide a Manufacturing Schedule in bar chart form including: Design,
Procurement, Manufacturing, Testing and Inspection, Preparation for Shipment, Transportation.
BIDDER shall also provide a Detailed Execution Plan in line with the Manufacturing schedule.
Percentage of shop capacity required for material fabrication quoted must be specified.
Generally, such Bank Guarantees will be required as follows (at discretion of BUYER):
The Bank Guarantees must be issued (on BUYER format) by a first class international bank (subject to
approval of BUYER) and as per
ATTACHMENT E – ADVANCE BANK GUARANTEE
ATTACHMENT F – PERFORMANCE BANK GUARANTEE
This document and the information it contains are property of TECHNIP ENERGIES India Ltd.. It shall not be used for any purpose other than
those for which it was supplied.
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
The Performance Bond must be valid from the effective date of the Purchase Order and remain in full
force and effect until the expiration of mechanical guarantee period except in case of failure of
SUPPLIER.
BIDDER must include in its bid the cost associated with providing such Guarantees.
BUYER reserves the right to reject any of these proposed SUB-SUPPLIERS and any additional SUB-
SUPPLIERS who are not accepted by BUYER up to the time of PO.
This document and the information it contains are property of TECHNIP ENERGIES India Ltd.. It shall not be used for any purpose other than
those for which it was supplied.
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
3.15 Training
Upon COMPANY request, VENDOR will have to perform training of the COMPANY staff
(trainees) either in the VENDOR workshop, or on site.
For such, BIDDER will make two proposals:
Training in workshop
Except for the living costs of COMPANY people, which will be supported by COMPANY, BIDDER
will propose for its personnel a calendar daily rate all-inclusive and will precise conditions under which
such training can take place (number of people, duration of session, location, required qualification of
trainee, etc...).
This document and the information it contains are property of TECHNIP ENERGIES India Ltd.. It shall not be used for any purpose other than
those for which it was supplied.
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
Training on site
BIDDER will propose the same rates with the same validity than those requested for the site supervisory
services:
• Calendar daily rate,
• Lump sum for mobilization / demobilization including round trip,
• Calendar daily lump covering living allowances, local transportation, etc...
BIDDER shall send a detailed program and content of the training that is being the basis of its training
proposal.
D BIDDER shall propose all relevant details such as: daily rate, number of people per session,
duration of session, location, required qualification of trainee, etc.
The form: “HSE Management System Questionnaire” (ATTACHMENT H) shall be duly completed and
submitted with the bid.
3.18 Ethics
BUYER’s professional activities are governed by a set of commitments, values and charters as
described on BUYER’s website at www.technip.com/en/about-us/our-commitments.
This document and the information it contains are property of TECHNIP ENERGIES India Ltd.. It shall not be used for any purpose other than
those for which it was supplied.
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
For such BIDDER shall submit along with its Bid the “Declaration of Compliance”
D (ATTACHMENT I) duly completed, stamped and signed by BIDDER’s representative.
The aggregate amount of Penalties under paragraph 3.20.1 & 3.20.2 will be limited to 10 % of the total
amount of ORDER
BIDDER is asked to undertake compliance with the above Late Delivery Liquidated Damages
This document and the information it contains are property of TECHNIP ENERGIES India Ltd.. It shall not be used for any purpose other than
those for which it was supplied.
EPCC
TECHNIP ENERGIES INDIA LTD. PMC ENGINEERS INDIA LIMITED
Contractor
Document Name Contractor Document No. Rev. No. Page
4. ATTACHMENTS
This document and the information it contains are property of TECHNIP ENERGIES India Ltd.. It shall not be used for any purpose other than
those for which it was supplied.