HOWE Engineering Projects COASTAL MARINE CONSTRUCTION

ADANI PORTS & SPECIAL


(India) Pvt. Ltd. AND ENGINEERING LTD
ECONOMIC ZONE LTD
CIVIL WORKS FOR DEVELOPMENT OF VLCC JETTY AND ASSOCIATED FACILITIES FOR
PROJECT
HANDLING CRUDE OIL AT MUNDRA, GUJARAT, INDIA.

TITLE OF SOP FOR PILING WORK


DOCUMENT

EPC CONTRACTOR
HOWE Engineering Projects(India) Pvt Ltd.

CONTRACTOR
COASTAL MARINE CONSTRUCTION AND ENGINEERING LTD.

CONSULTANT

CLIENT DOCUMENT
NO.
HW026-100-E-GN-GN-
REV.
CONTRACTOR/ NO.
CONSULTANT’S CM/HSE/VLCC/
DOCUMENTNO.

PREPARED BY CHECKED BY APPROVED BY


REV.NO. DATE DESCRIPTION Init. Sign Init Sign Init. Sign
.
08/10/2021 SOP FOR PILING WORK SQ PH SRC

This Document is the Property of COMACOE. It should not be used, copied or reproduced without their Written
Permission.
SOP FOR PILING WORK

DEVELOPMENT OF VLLC JETTY AND ASSOCIATED FACILITIESFOR HANDLING CRUDE


OIL AT MUNDRA, GUJARAT INDIA

Document Status For owner

For Approval

SOP FOR PILING WORK

On

CIVIL WORKFOR DEVELOPMENT OF


VLCC JETTY FOR HANDLING CRUDE
OIL AT MUNDRA, GUJARAT,INDIA.

Employer
HOWE Engineering Projects (India) Pvt. Ltd.

By

Coastal Marine Construction &


Engineering Limited [COMACOE]

Project Planned Period: 18 Months


Document Type: SOP FOR HOT WORK
For Approval 08/10/2021 SQ PH SRC
Rev Issue Date Prepared Reviewed Approved
Document Project Code Document Number Rev

Number EPC-1-0521-01
CM/HSE/VLCC/

Project Codes Document Number Rev Date Doc. Information Page


EPC-1-0521-01 CM/HSE/VLCC/ 08/10/2021 SOP FOR PILING WORK 2 of 5
SOP FOR PILING WORK

DEVELOPMENT OF VLLC JETTY AND ASSOCIATED FACILITIESFOR HANDLING CRUDE


OIL AT MUNDRA, GUJARAT INDIA

REVISION DETAILS

Page no Revision Page no Revision


A B C A B C
1
2
3
4
5

6
7
8

DISTRIBUTION RECORD
Project Codes Document Number Rev Date Doc. Information Page
EPC-1-0521-01 CM/HSE/VLCC/ 08/10/2021 SOP FOR PILING WORK 3 of 5
SOP FOR PILING WORK

DEVELOPMENT OF VLLC JETTY AND ASSOCIATED FACILITIESFOR HANDLING CRUDE


OIL AT MUNDRA, GUJARAT INDIA

Copy
Issue To Location Rev. No. Issue Date
to.
1 Mr. Provat Ghosh COMACOE

2 Mr. Soumitra Roy Chowdhury COMACOE

3 Mr. Baidyanath Sarkar COMACOE

4 Mr. Sayed Qamar COMACOE

10

11

12        

13

14        

1. Purpose

The purpose of this procedure is to ensure that activities related to Piling Work is
carried out in a safe manner

2. Scope
Project Codes Document Number Rev Date Doc. Information Page
EPC-1-0521-01 CM/HSE/VLCC/ 08/10/2021 SOP FOR PILING WORK 4 of 5
SOP FOR PILING WORK

DEVELOPMENT OF VLLC JETTY AND ASSOCIATED FACILITIESFOR HANDLING CRUDE


OIL AT MUNDRA, GUJARAT INDIA

This procedure is applicable at all the project sites, stores and offices

3. Tools and equipment


S. Tools and Equipment Inspection Frequency Maintenance Frequency
No
1. Hydra/Crane- TPI Required Daily Monthly
2. Piling Rig Daily As and when required

3. Wire Sling-TPI Required Daily Monthly

4. D Shackle- TPI Required Daily Monthly

5. Concrete Pump Daily As and when required

4. Critical Safety Steps

SR. NO PROCEDURAL STEPS RESPONSIBILITY

1 Operator and Supervisor


2 Operator and Supervisor
3 Operator and Supervisor
4 Operator and Supervisor
5 Operator and Supervisor
6 Operator and Supervisor
7 Operator and Supervisor
8 Operator and Supervisor
9 Operator and Supervisor
10 Operator and Supervisor
11 Operator and Supervisor
12 Operator and Supervisor
13 PTW Process to follow. Operator and Supervisor
14 Site Engineer and front line supervisor shall Store supervisor
ensure that all the personal engaged in the work
shall use proper PPE’s at site.
15 All personal shall be given periodical awareness Operator and Supervisor
training for safe work at site.

1. Procedure and Steps

Project Codes Document Number Rev Date Doc. Information Page


EPC-1-0521-01 CM/HSE/VLCC/ 08/10/2021 SOP FOR PILING WORK 5 of 5