Two Story Admin Bldg Extension

I. Statement of the Problem:


The Department of Education (DepEd), as an integral part of the rehabilitation of the
Baguio Teachers Camp has commissioned a RL to design and manage the construction of the
admin extension building. The new building will house Purchasing Department and Engineering
Department to address the overcrowding in the existing admin building. The two department
office area will be located at the 2nd floor while the locker room/T&B are to be located for the
end users to enjoy the cold climate and scenery of the camp
Design Requirements
1. A Business Center - 168sq.m, a lobby and a stair of 60sq.m and a storage 1 of
120sq.m will all together be located at GF, right corner of lot. The 3 areas will have a total
width of 30m compose of 12m width business center, 6m width of lobby stair and what
remains is the width of the storage 1. The business center will occupy the right corner
with 6m width x 14 length deck on the right side, and the other deck in front measuring
18m x 10m to join the side deck. The lobby will also have a deck of 6.0mx 10.0m. Both
front and side open decks are accessible by stairs/steps. Storage 1 will contain the
beddings, linen and the like as well as office supplies, a concessionaire will operate the
business center.
2. The Storage 2 will be a 300sq.m, with a width of 15m width min. setback and
is attached to storage 1. The storage 2 will contain construction materials such as cement,
lumber, plywood, paints, and the like. This spacer is under the management and control
of the purchasing department.
3. The last enclosed space at the G.F, is the workshop for use of the engineering
department; its size will have a width of 40mx 800sq.m and is aligned to storage 2. The
workshop will contain a locker room with T&B/ shower with area of 60sq.m. The
workshop will be constructed fire rated partition walls.
4. The back portion of the workshop, storage 1, storage 2, and lobby is where the
docking/delivery platform is attached. The platform measures 4m width 73m length.
Ramp and stair are integrated in the platform.
5. A rear driveway, loading/ unloading area, parking spaces, multipurpose open
space will occupy the rear measuring 24m x 105m.
6. Right after workshop is a softscape space of 3.0m x 72sq.m
7. A driveway will be provided with width of 6.0m to connect the rear open space
to the main road.
8. The front and side setback will be dedicated for softscape/garden.
9. The second floor will contain the stair and stairwell of the same size as the
ground lobby/stair. It also contains the engineering department office of the same size as
the business center which is exactly region it. Likewise, the purchasing department office
which of the same size as the storage 1.
10. A balcony for 2 offices will be provided with open deck 4x 18m.
II. Design Objectives:
The new building should have a design character uniform to that to the existing
administration building being the its extension. The use of local materials, Baguio stone, as
finishing material is encouraged. The building should be provided with wide windows for the
ample ventilation since the building will not be equipped with artificial ventilation or AC. The front
and side softscape be in the same level as the main road to avoid rain water ponding.
III. The Site:
The project site is a small camp of a big camp. The site assigned is at the left corner of the
main road (teacher's camp) and secondary road, the first road from the Leonard Wood road
except that the land is bounded in the south by the main road and in the east bounded by the
secondary road. The rear and the left side is technically limitless, the camp being a large campus
like environment east of downtown Baguio. RL is required to determine and report the final lot
area to be used after it has satisfy the space required of DepEd-BTC. It is assumed that main and
secondary roads are perpendicular to each other. The camp is declared as Group C- Education and
Recreation, Division C- other types of government buildings and a zoning classification of G.I (Gen.
Institution). The office of the building official of Baguio declared the groupings and zoning
classification of this site. The site is sloping downward at 3% from the main street, sidewalk
towards the rear part of the site. The front right corner is the east is the same level as the main
street sidewalk. The secondary street and its sidewalk are sloping just like the lot towards the rea.
It must be noted that the entire camp is provided with buildings including this project. The front
and right side setback will be 5.0m. Public utilities such as water, sewage and electric are all in
placed in the camp and are accessible by the building project.

Compiled Questions:
1.As designed and applied to this project, the yards abutting the RROW are for___.
A. landscaping
B. driveways
C. off-RROW loading spaces
D. short-term off-street parking
2.The measurement of lot occupancy taken from ground level includes the ___.
A. Stair well
B. yards
C. courts
D. light wells
3.What is the maximum width, in meters, of the driveway if its for one way?
A. 8
B. 5
C. 10
D. 6
4.What will be the LEAST total area of the windows at the Engineering Department Office in square
meters?
A. 10% of total area
B. 15% of total area
C. 42& of total area
D. 5% of total area
5.What is the LEAST total area of the windows at the business center in square meters?
A. 16.80
B. 15.00
C. 29.60
D. 33.00
6.What is the LEAST width in meters, of the t & b/shower?
A. 0.90
B. 1.00
C. 2.00
D. 3.00
7.The most suitable and practical door for the workshop are ___.
A. Roll-up shutter
B. center-hung
C. Double-swing
D. center-pivot
8.What is the minimum width, in meters, of the sidewalk in each side of the RROW?
A. 1.66
B. 2.00
C. 3.00
D. 1.20
9.The most appropriate floor tiles to use for the open decks are ___.
A. glazed
B. non-skid
C. polished
D. vinyl
10.The most appropriate floor finish for the storage is ___.
A. Granite slab
B. Rubberized paint
C. Ceramic tiles
D. Engineered wood
11.The most appropriate floor finish for the workshop is ___.
A. plastered plain cement
B. Rubberized paint
C. engineered wood
D. paint
12.The most appropriate floor finish for the business center is/are ___.
A. vinyl
B. engineered wood
C. Latex Paint
D. ceramic tiles
13.The most appropriate floor finish for the office is ___.
A. Solid wood
B. rubberized
C. Plastered plain cement
D. vinyl
14.What is NOT a secondary color?
A. Orange
B. Purple
C. Green
D. Yellow
15.What is NOT a tertiary color?
A. Blue-green
B. Red-orange
C. Yellow-orange
D. Blue-red
16.Which is NOT a common shape of metal top rail?
A. Rectangle
B. Oval
C. Square
D. Round
17.What is the common name for a single pole, double throw switch?
A. 3-way switch
B. Two gang switch
C. Triple gang switch
D. 2-way switch
18.An automatically operated electrical switch, its basic function is to detect fault condition and interrupt
current flow is a ___.
A. Switch board
B. Circuit breaker
C. Switch line
D. Automatic switch
19. What is the lot dimension of the project?
A. 24m x 91m
B. 24m x 99m
C. 55m x 105m
D. 53m x 105m
20. What is the AMBF of the project base on the given data?
A. 1,960 sqm
B. 2,064 sqm
C. 1,820 sqm
D. 2,220 sqm
21. What is the USA of the project base on the given data?
A. 687 sqm
B. 720 sqm
C. 807 sqm
D. 960 sqm
22. What is the Total Gross Floor Area of the project base on its given data?
A. 2,064 sqm
B. 1,796 sqm
C. 2,484 sqm
D. 2,560 sqm
23. What is the Percentage of Site Occupancy of the project in relation with its lot?
A. 40%
B. 37%
C. 50%
D. 75%
24. Base on Rule VII & VIII of National Building Code, what is the designated FLAR for the project?
A. 2.5
B. 9.0
C. 1.2
D. 3.0
25. What is the declared zoning classification of the site?
A. SPE
B. G-1
C. GI
D. Division C
26. Given the project site orientation, from what direction shall the “Amihan” wind come from?
A. East
B. SouthWest
C. SouthEast
D. NorthEast
27. If the building of this compound is defined as rectangle, what will be the building dimension of the
project?
A. 24m x 91m
B. 55m x 105m
C. 48m x 99m
D. 20m x 91m
28. What is the Maximum Allowable Construction Area of the project base on the given data?
A. 4,758 sqm
B. 3,501 sqm
C. 2,064 sqm
D. 4,760 sqm
29. What is the range of the number of tiles to be used in the Engineering Department office using 600mm
x 1200mm ceiling tiles?
A. 235 pcs
B. 58 pcs
C. 233 pcs
D. 250 pcs
30. What is the area/room aligned in ground floor with the Engineering department office?
A. Storage 1
B. Lobby
C. Business Center
D. Storage 2
31. Given that the slab at second floor is 0.12 meters thick, how many kilograms of steel reinforcing bars
needed if it requires 15kgs of reinforcing bars per cubic meter of concrete? Exclude the area of stairwell
of 3m x 6m.
A. 6,300 kgs
B. 6,030 kgs
C. 723.6 kgs
D. 756 kgs
32. Given the site condition, what is the type of lot for the said project?
A. End Lot
B. Regular Lot
C. Corner Lot
D. Inside Lot
33. Which of the following is NOT a hardware item?
A. door stop
B. door casing
C. lockset
D. door closer
34. If the offices at 2nd floor are not to be air-conditioned, what shall be the minimum distance in meters
between the FFL and ceiling, as compliance under the NBCP?
A. 2.10
B. 2.40
C. 2.70
D. 3.00
35. Assuming that docking/delivery platform of the project is 450mm above NGL, and the tread width of
the stair is 300mm, what will be the Total Run of the stair?
A. 150mm
B. 600mm
C. 300mm
D. 450mm
36. What is the least dimension of a parking slot for the disabled?
A. 2.50m
B. 3.00m
C. 4.10m
D. 3.70m
37. Under the 2004 Revised IRR of PD 1096 or NBCP, what is the term interchangeably used for an
institutional zoning classification?
A. Gross Institutional
B. General Institutional
C. Generic Institutional
D. Governmental Institutional
38. In terms of construction material production, which of the following flooring materials is considered
to have the lowest carbon footprint?
A. Vigan tiles
B. Mariwasa tiles
C. High-pressure laminate flooring
D. Baguio stone
39. Which of the following is a good general lighting color (i.e. the shade of the emitted artificial light), for
the work areas in the workshop?
A. Warm white
B. Cool white
C. Daylight
D. Yellow
40. Base on Rule VII & VIII of National Building Code, what is the Allowable Maximum PSO of the project?
A. 50%
B. 60%
C. 70%
D. 80%
41. This design variable refers to the size, position and orientation of windows; window glass materials;
external and internal shading devices.
A. Building Fabric
B. Fenestration
C. Thermal Insulation
D. Surface-to-Volume Ratio
42. Assuming that the workshop will be covered with T&G flooring. Compute for the total number of board
foot to be used if the workshop (excluding the 60sq.m T&B/locker room) will use 1”x4”x4’ T&G flooring
with an effective width of 3.5”.
A. 9,200 bft
B. 9,400 bft
C. 8,700 bft
D. 8,390 bft
43. What is the Gross Floor Area of the ground floor base on project given data?
A. 1,796 sqm
B. 1,448 sqm
C. 348 sqm
D. 2,040 sqm
44. Based on the NBCP Section 811 of Rule VIII, what is the minimum requirement for air changes for an
office?
A. 0.29 cu.m.
B. 1.20 cu.m.
C. 0.85 cu.m.
D. none of the choices
45. Formula in getting for the GFA of the building?
A. GFA = TGFA + nonGFA
B. GFA = TLA x multiplier
C. GFA = TLA x FLAR
D. All of the above
46. Base on project given, what is not included in the GFA?
A. Engineering Department office
B. Business Center side deck
C. Locker room
D. Storage 2
47. As per PD 1096, what is the classification of buildings of masonry and wood construction with a one-
hour fire-resistivity throughout and exterior walls of incombustible fire-resistive construction?
A. Type I
B. Type II
C. Type III
D. Type IV
48. Ingress/Egress, traffic, landscaping, et. Al are basic Design considerations for this project which falls
under?
A. Human determinants
B. Accessibility
C. Man-made environment
D. Aesthetics