1. Under the firm’s set-up, who will be in charged of signing the plans and related
documents?
a. Principal Architect
b. Junior Architect
c. Apprentices
d. NOTA
2. The Junior Architect was under the instruction to follow the regulation of C-1
development regulations on parking, where should the parking not be located?
a. Rear
b. Front
c. Side
d. Basement
3. As deadlines are important, a calendar day means?
a. Does not include Sundays and Holidays
b. Includes only regular working days
c. Includes all days, inlcluding Sundays and Holidays
d. Holidays only
4. What Design code should the design team first consider in the plan preparation
which is critical in the application of the Building Permit?
a. National Building Code
b. Fire Code of the Philippines
c. PD 957
d. BP 344
5. Which of the following is not a referral code of the National Building Code?
a. Philippine Electrical Code
b. National Structural Code of the Philippines
c. National Plumbing Code of the Philippines
d. Civil Code of the Philippines
6. To whom the Junior Architect will be responsible if there will be errors found on the
plans he heads to produced?
a. Client
b. Principal Architect
c. Building Official
d. The Firm
7. If the apprentices, wishes to have their logbook for their ALE, who will sign as the
mentor?
a. Principal Architect
b. Their immediate boss, the Junior Architect
c. The Firm
d. The Client
8. What government agency appoints the Building Official of a highly urbanized city?
a. DPWH
b. DOTR
c. Office of the Executive Secretary
d. Office of the President
9. After how many years can a newly passed Architect sign the ALE aspirants as a
mentor?
a. 2 years
b. 3 years
c. 4 years
d. NONE
10. The “Project Proponent” can be understood as the
a. Contractor
b. Architect
c. Client
d. Builder
11. In small scale projects, Clerk-of-work are commonly referred to as the:
a. Architect
b. Apprentice
c. Foreman
d. Construction Manager
12. Contract documents should be signed in how many copies by both the contractor
and the client duly witnessed?
a. Duplicate
b. Triplicate
c. Quintuplicate
d. Xeroxed copies
13. Shop drawings are prepared by the Contractor to be approved by the architect.
Who checks the accuracy of the sub-contractors shop drawings?
a. Architect
b. Contractor
c. Owner
d. Construction Manager
14. When was the Code of Ethical Conduct for Registered and Licensed Architect as
well as for holders of Temporary Special Permit promulgated?
a. 2004
b. 1978
c. 2006
d. 2010
15. The New Methods of Compensation that forms part of the Standards of
Professional Practice was approved by the Professional Board of Architecture
(PRBOA) and took effect in:
a. 2015
b. 2016
c. 2017
d. 2010
16. Under the new Methods of Compensation under the Standards of Professional
Practice, the architect is paid based on the Percentage of Project Cost. If the
Architect will include all allied professionals under his contract, this will fall under
DAEDS. What does DAEDS stands for?
a. Detailed Architectural and Engineering Submission
b. Detailed Arts and Educational System
c. Detailed Architectural and Engineering Design Services
d. Detailed Architects and Engineers Submission
17. If the client elects not to include the allied engineers services on the architects
contract, who will be over-all coordinator of the engineers work?
a. Client
b. Civil Engineer
c. Architect
d. Project Manager
18. For simple projects under the New Methods of Compensation under the
Standards of Professional Practice shall be charged by much if the project is less
than 50M?
a. 5%
b. 6%
c. 7%
d. 8%
19. Architect Baking was commissioned to design a Residential Project under Detailed
Architectural Design Service (DADS), how much is the professional fee of the
architect if the project cost is Ten Million pesos?
a. 1,000,000
b. 900,000
c. 500,000
d. 600,000
20. The client of Arch. Baking decided eventually to award and include the Engineering
disciplines to the firm, how much professional fee should Arch. Baking now
charged?
a. 1,000,000
b. 1,200,000
c. 500,000
d. 1,500,000
21. In a renovation project, what is the first obligation, the architect must perform?
a. Prepare the feasibility study
b. Apply for a permit
c. Notify the previous architect involved
d. Prepare and present schemes?
A client hires Architect Reyes in Design Build by Administration Project of a Rest House
Bungalow located in the mountainside,60 kms. away from the Municipal Hall. Architect
Reyes prepares his team and started working on the project immediately.
22. How much should be the down payment of the client to Arch. Reyes?
a. 30% of the contract
b. 10% of Project cost
c. 50%
d. No down payment should be given
23. Who will apply for a building permit on this project?
a. Arch. Reyes
b. Client
c. No building permit is required, too far from the Municipal Hall
d. Rest houses are exempted
24. How much professional fee is the architect entitled?
a. 10% plus 7% for Design Build
b. 10%
c. Design fee of 10% plus 7% of DB and reimbursible expenses
d. Depends on the agreement
25. Under the Design-Build on guaranteed maximum cost, if the guaranteed
maximum cost is exceeded by 10%, the extra cost exceeding the 10% shall be
shouldered by whom?
a. Architect
b. 60-40 sharing in favor of the client
c. Client
d. 50-50 Sharing
26. All receipts under Design-Build Project shall be under the name of whom?
a. Client
b. Architect
c. Accountant
d. Doesn’t Matter
27. Who keeps the record of the project?
a. Timekeeper
b. Foreman
c. Both Architect and Client
d. Project Supervisor
28. Any dispute between the Client and the Architect under the Design-Build
Agreement should be settled through:
a. Barangay-Lupong Tagapayapa
b. Arbitration
c. Mediation
d. Small Claims Court
29. For monetary claims and disputes less than One Hundred Thousand Pesos, the
process of collection should be through:
a. Barangay
b. Arbitration
c. Small Claims Court
d. Fiscal Office
30. If in any case, a project under arbitration, how many days should both parties
complies with the arbitration order?
a. 15 days
b. 21 days
c. 45 days
d. 30 days
31. In selection of an arbitration committee to settle questions of disputes, the
members should be composed of one representative each by both parties and the
other should be:
a. A neutral member
b. Client’s relative
c. Architect’s representative
d. Project manager
32. As per the LGU code the maximum a professional can pay his Community
Tax Certificate (CEDULA) is how much’
a.P 5,000.00
b P 100.00
c. P 20.00
d. P 1,000.00
33. Which among the choices should have the highest weight in relation To the
architects responsibility to the people?
a. Respect and conserve the environment
b. Promote the interest of the his/her professional organisation
c. Do not deceive the public
d. All of the above
34. In relation to the architects responsibility to the client, which among the choices
should the architect not heed?
a. Give the client an overview of the project
b. To give assurance of the cost of the project
c. Protect the clients interest
d. To keep the client informed at all times
34. In preparation of the contract documents, the architect should always consider
and include in the contract the following provisions except one:
a. Negotiation
b. Mediation
c. Arbitration
d. Out of court settlement