Professional Documents
Culture Documents
Antech - Des Rep
Antech - Des Rep
STRUCTURAL CONSULTANTS :
ASSOCIATED
STRUCTURAL CONSULTANTS
'Souparnika', 63/2413, Chemmath Road, Gandhi Nagar,
Kochi 682 017, Kerala, India.
3000
12000 12600
12000
4500
Flow
Hydrological Details
3
Design Discharge 131.326 m /sec
HFL 127.51 m
Design Velocity 3.2 m/sec
12000
1750 500 7500 500 1750
12000
1250
Resting on Hard Rock
12600
130.336
1665
128 m 350
Top of cap 100 tk. Bearing
300
300
127.51
4571
123.15
1250 121.9
4500
Resting on Hard Rock
150
100
150
200
650
Girder Section
20 mm expansion jt
300 400
250
300
300
2015
250
970
600
370 1200
Ref Calculation Remark
Load Calculation
Dead Loads
150
Running Section
100
No b D Area
Top Flange 1 650 150 97500
Top Haunch 2 175 100 17500
Web 1 1050 300 315000 800 300 1400
Bottom Haunch 2 175 150 26250
Bot Flange 1 650 200 130000
586250
Self weight = 0.58625 x 25
150
= 14.7 kN/m
200
650
Slab
Selfweight of Footpath
Thickness of WC = 0.065 m
2
Weight of WC = 0.065 x 20 = 1.30 kN/m
Live Load
Live Load as per IRC 6 - 2017 is considered for the design of the superstructure and sub structure. As per table
6A of IRC 6 - 2017, for bridges with carriageway width between 5.3m and 9.6m, 2 Lane Class A loading or 1
Lane 70R loading is to be considered. The same is modelled in the versatile finite element software STAAD Pro
V8i. Impact factor is calculated as per Cl 208.2 of IRC 6-2017 and is applied as a scale factor into the model
1 Impact factor
Class 70R
Tracked Vehicles = 10%
Wheeled Vehicles = 19%
Class A = 19%
Horizontal forces of Live load - Loads due to Braking
Class 70R
Class A
2 2
Ka Cos (φ-α) 1
2 1/2
Cos (α) Cos(δ+α) 1+{sin(φ+δ) Sin(φ-β) / Cos(α-β) Cos(δ+α)}
Ka = 0.297
2
γ = 18 kN/m
P = 10.9 kN/m
2.015 M = 9.2 kN-m/m
10.8
For Saturated Condition
2
γ = 19 kN/m
P = 11.5 kN/m
2.015 M = 7.7 kN-m/m
11.4
For Surcharge Load
2
Load = 6.42 kN/m
2.015 P = 6.5 kN/m
M = 4.3 kN-m/m
6.4
Total Moment due to earthpressure on dirt wall = 13.5 kN-m
Earth Pressure at bot of abutment wall
Point of application
For dry condition = 0.42 X 7.19
= 3.02 m
For wet condition = 0.33 X 7.19
2.37 m
For Dry Condition
2
γ = 18 kN/m
P = 138.2 kN/m
7.186 M = 417.0 kN-m/m
38.5
For Saturated Condition
2
γ = 19 kN/m
P = 145.9 kN/m
7.186 M = 349.4 kN-m/m
40.6
For Surcharge Load
2
Load = 6.42 kN/m
P = 23.1 kN/m
7.186 M = 55.3 kN-m/m
Seismic Loads
Seismic forces are calculated as per IRC 6 2017
Wind on live loads is not considered when the wind speed is greater than 36 m/sec
Case 1
Az = Area in plain
Ft = Transverse wind force = Pz x Az x G x CL
= 647.65 x 2 x 1.3 x Az
2
= 1.68 x Az kN/m
Horizontal forces about footing bottom
Area Horz Load Moment
Lever Arm
No Description Longitudnal Transverse Longitudnal Transverse
1 Live load
36 0.00 0.00 9.94 0.0 0.0
2 Girder
1.665 x 18 29.97 12.62 50.47 7.60 95.9 383.7
3 Crash Barrier
1 x 18 18 7.58 30.31 9.44 71.5 286.0
4 Abutment
4.571 x 1.2 5.5 2.31 9.24 3.54 8.2 32.7
5 Abutment head
1.57 x 0.6 0.942 0.40 1.59 6.12 2.4 9.7
Total 22.90 91.60 178.02 712.09
Horizontal forces about footing top
Area Horz Load Moment
Lever Arm
No Description Longitudnal Transverse Longitudnal Transverse
1 Live load
36 0.00 0.00 8.69 0.0 0.0
2 Girder
1.665 x 18 29.97 12.62 50.47 6.35 80.2 320.6
3 Crash Barrier
1 x 18 18 7.58 30.31 8.19 62.0 248.1
4 Abutment
4.571 x 1.2 5.5 2.31 9.24 2.29 5.3 21.1
5 Abutment head
1.57 x 0.6 0.942 0.40 1.59 4.87 1.9 7.7
Total 22.90 91.60 149.40 597.59
Case 2
Az = Area in plain
Ft = Transverse wind force = Pz x Az x G x CL
= 551.84 x 2 x 1.3 x Az
2
= 1.43 x Az kN/m
Horizontal forces above the footing bottom
Area Horz Load Moment
Lever Arm
No Description Longitudnal Transverse Longitudnal Transverse
1 Live load
36 12.91 51.65 9.94 128.3 513.2
2 Girder
29.97 10.75 43.00 7.60 81.7 327.0
3 Crash Barrier
18 6.46 25.83 9.44 60.9 243.7
4 Abutment
5.4852 1.97 7.87 3.54 7.0 27.8
5 Abutment head
0.942 0.34 1.35 6.12 2.1 8.3
Total 32.43 129.70 279.99 1119.96
PREAMBLE
The substructure consists of an open foundation resting on rock with rock anchors provided for horizontal shears and uplift forces. The girders rest on
a bearing. The bearings are resting on pedestals supported on the abutment head which is resting on the abutment wall
A1 A2
12600
1250
4500 4500
Footing Plan Footing Section
Ref Calculation Remark
Load Moment
Lever Arm
No Description Vertical Transverse Longitudinal Transverse Longitudinal
1 Self weight of sub structure 3609.2
Vertical
2 Self weight of super structure 1474
Vertical
3 SIDL (Crash Barrier, Hand rail etc) 82.2
Vertical
4 Water Current 8.67 14.34
Transverse
Ref Calculation Remark
8 Wearing Coat 87.75
Vertical
12 Live load
G1 173 4.5 778.5
G2 295 1.5 442.5
G3 184
G4 44
13 Braking force 100 9.636 964
Longitudinal
14 Breaking Force 32.9
Vertical
15 Wind loads 91.60 1120.0
Transverse
16 Wind loads 22.90 280.0
Longitudinal
17 Seismic 529.05216 1767.0
Transverse
18 Seismic 429.74 2249.4
Longitudinal
19 Earth pressure 168.93 472.3
Longitudinal
Total 5982.08 630.24 720.65 4594.56 3492.97
2
Area of footing 56.7 m
3
Ztransverse 119.07 m
3
Zlongitudnal 42.53 m
2 2
Maximum base pressure 226.2 kN/m < 400 kN/m
2 2
Minimum base pressure -15.2 kN/m < 0 kN/m
Ref Calculation Remark
Rock Anchor Design
2
Area of bar 201.1 mm
2
Permissible Shear stress 0.87 x 500 / 1.732 = 251.15 N/mm
Permissible Shear Force 251.15 x 201.06 = 50.5 kN
No of bars required 630.24 / 50.5 + 720.65 / 50.5 = 26.8 nos
2
Maximum base pressure 226.2 kN/m
Cantilever length 1.65 m
Moment 226.23 x 1.65 x 1.65 / 2 = 307.96 kN-m
Factored moment 307.96 x 1.5 = 461.94 kN-m
Shear Force 226.23 x 1.65 / 2 = 186.6 kN
Factored shear force 186.64 x 1.5 = 279.96 kN
Ref Calculation Remark
Check for Bottom bar
Design data
D = 1250
Cover = 75
d = 1175 mm
b = 1000 mm
2
fck = 35 N/mm
2
fy = 500 N/mm
2
Asw = 15 x pi/4 x 8 x 8 = 753.98 mm
s = 450.00 mm
Z = 0.9 x 1175 = 1057.5
2
f ywd = fy / γm = 500 / 1.15 = 434.78 N/mm
Ref Calculation Remark
θ = 45.00 D
Acteff = 75 x 1175
2
= 93750 mm
2
Area of surface reinforcement = 937.5 mm
2
Provide 12 mm dia bars at 150 mm c/c with Ast = 942.5 mm
Ref Calculation Remark
Stress Check
2
Es 200000 N/mm
2
Ec 29580.399 N/mm
m Es / 0.5 Ec 13.52
2
mAst 13.52 x 2010.62 27183.582 mm
Depth of NA 69.41 mm
Lever Arm 1151.86
5(c+ φ /2 ) 5 x ( 75 + 16 / 2)
415 > 120
Hence
S r,max 3.4 c + 0.425 k 1 k 2 φ / ρ ρ.eff
k1 = Coefficient to account for bond of rebar
= 0.8
k2 = Coefficient to account for distribution of strain
= 0.5
ρ ρ.eff = A s /A c.eff
Ref Calculation Remark
A c.eff = Area of concrete in tension
h ceff = min ( 2.5 (h-d) , (h - x) /3 or h /2)
A1 A2
2015
250
12000
970
600
1200
370 1200
Abutment Plan
Ref Calculation Remark
5171
1200
Footing Section
2
Axial Stress 0.41 N/mm = 0.01 fck < 0.08 fck
Design data
D = 1200
Cover = 75
d = 1125 mm
b = 12000 mm
2
fck = 35 N/mm
2
fy = 500 N/mm
Check for Vertical bar
Design for flexure
Table C 8.1 β1 = 0.80952
IRC:SP:105- β2 = 0.41597
2015 fcd = αf ck /γ c = 0.67 x 35 / 1.5
= 15.63
Neutral axis x = (d/2β 2 )-((d/2β 2 ) 2 -(M Ed /β 1 β 2 bf cd )) 0.5
= 14.42 mm
Ref Calculation Remark
To check adequacy of section
xlim = ε cu /(ε cu +ε yd ) d
εyd = 0.00217391
xlim = 693.97 mm > 14.4 mm
Lever arm z = 1125 - 0.416 x 14.42 = 1119.0 mm
2
Ast = MEd/0.87fyz = 5032.9 mm
2
Provide 2 X 16 dia bars at 150 mm C/C with Ast = 32169.9 mm
pt provided = 0.24%
Stress Check
2
Es 200000 N/mm
2
Ec 29580.399 N/mm
m Es / 0.5 Ec 13.52
2
mAst 13.52 x 32169.9 434937.05 mm
Depth of NA 92.55 mm
Lever Arm 1094.15
Ref Calculation Remark
Taking Moments about the tension steel
5(c+ φ /2 ) 5 x ( 75 + 16 / 2)
415 > 120
Hence
S r,max 3.4 c + 0.425 k 1 k 2 φ / ρ ρ.eff
k1 = Coefficient to account for bond of rebar
= 0.8
k2 = Coefficient to account for distribution of strain
= 0.5
ρ ρ.eff = A s /A c.eff
2015
250
Ref Calculation Remark
Moment due to earth pressure 13.54 kN-m
Factored moment 13.54 x 1.5 = 20.31 kN-m
Shear Force due to earth pressure 17.94 kN
Factored shear Force 17.94 x 1.5 = 26.91 kN
Design data
D = 250
Cover = 75
d = 175 mm
b = 1000 mm
2
fck = 35 N/mm
2
fy = 500 N/mm
Check for Vertical bar
Design for flexure
Table C 8.1 β1 = 0.80952
IRC:SP:105- β2 = 0.41597
2015 fcd = αf ck /γ c = 0.67 x 35 / 1.5
= 15.63
Neutral axis x = (d/2β 2 )-((d/2β 2 ) 2 -(M Ed /β 1 β 2 bf cd )) 0.5
= 9.38 mm
To check adequacy of section
xlim = ε cu /(ε cu +ε yd ) d
εyd = 0.00217391
xlim = 107.95 mm > 9.4 mm
Lever arm z = 175 - 0.416 x 9.38 = 171.1 mm
2
Ast = MEd/0.87fyz = 272.9 mm
2
Provide 2 X 12 dia bars at 150 mm C/C with Ast = 1508.0 mm
pt provided = 0.86%
Ref Calculation Remark
Design for shear
2
Es 200000 N/mm
2
Ec 29580.399 N/mm
m Es / 0.5 Ec 13.52
2
mAst 13.52 x 1507.96 20387.619 mm
Depth of NA 52.06 mm
Lever Arm 157.65
Ref Calculation Remark
Taking Moments about the tension steel
5(c+ φ /2 ) 5 x ( 75 + 12 / 2)
405 > 120
Hence
S r,max 3.4 c + 0.425 k 1 k 2 φ / ρ ρ.eff
k1 = Coefficient to account for bond of rebar
= 0.8
k2 = Coefficient to account for distribution of strain
= 0.5
ρ ρ.eff = A s /A c.eff
2
Average Pressure on return Wall = 5.69 kN/m
Design data
D = 250
Cover = 75
d = 175 mm
b = 2470 mm
2
fck = 35 N/mm
Ref Calculation Remark
2
fy = 500 N/mm
2
Es 200000 N/mm
2
Ec 29580.399 N/mm
m Es / 0.5 Ec 13.52
2
mAst 13.52 x 6621.64 89524.573 mm
Depth of NA 92.55 mm
Lever Arm 144.15
5(c+ φ /2 ) 5 x ( 75 + 16 / 2)
415 > 120
Hence
S r,max 3.4 c + 0.425 k 1 k 2 φ / ρ ρ.eff
k1 = Coefficient to account for bond of rebar
= 0.8
k2 = Coefficient to account for distribution of strain
Ref Calculation Remark
= 0.5
ρ ρ.eff = A s /A c.eff
1 PREAMBLE
The superstructure consists of 4 nos RCC cast-in-situ I beams spaced at 3m c/c connected by two end diaphragm and two intermediate diaphragms
with cast insitu concrete deck slab 200 mm thick.. After casting of deck slab , the span is then provided with crash barrier and wearing coat as in
drawing.
C/ C of cxpansion joint = 18 m
Permissible Stresses
12
1.5 3 3 3 1.5
CROSS SECTION
150
100
150
200
650
GIRDER CROSS SECTION
200
1600
3.1 SECTION PROPERTIES
INNER GIRDER
beff = 3000 mm
Section properties
DIST FROM
LENGHT L BREADTH B / HEIGHT H AREA BOTTOM A . Yb
ID SECTION No cm cm sq cm Yb, cm cu cm
OUTER GIRDER
b1 = 1350 mm b2 = 1350 mm
lo = 16600 mm
beff = 3000 mm
BENDING MOMENT in kN m
STAAD
Analysis Outer girder Inner girder
Footpath Live Footpath Live
Dist from CL (m) Dead Load Wearing Coat Load Total Dead Load Wearing Coat Load Total
SHEAR FORCE in kN
BENDING MOMENT
SHEAR FORCE
4 DESIGN OF GIRDER
A. AT MID SPAN
= 2359.00 kNm
= 3392.10 kNm
Design for flexure
D = 1600 mm
Cover = 40 mm
d = 1560 mm
b = 3000 mm
2
fck = 35 N/mm
2
fy = 500 N/mm
bt = 650 mm
= 15.63 N /mm2
2 0.5
Neutral axis x = (d/2β 2 )-((d/2β 2 ) -(M Ed /β 1 β 2 bf cd ))
= 58.17 mm
To check adequacy of section
xlim = ε cu /(ε cu +ε yd ) d
εyd = 0.002173913
2
Asw = 2 x pi/4 x 12 x 12 = 226.19 mm
s = 120.00 mm
D
θ = 45.00
Acteff = 40 x 1560
2
= 62400 mm
2
Area of surface reinforcement = 624 mm
2
Provide 10 mm dia bars at 150 mm c/c with Ast = 816.8 mm
5 Stress Check
m = Es / 0.5 Ec = 13.52
2
mAst = 13.52 x 7850 = 106132 mm
Depth of NA = 90.34 mm
Lever Arm = 1529.89 mm
5(c+φ/2) 5 x ( 40 + 25 / 2)
262.5 > 120
Hence
S r,max 3.4 c + 0.425 k 1 k 2 φ / ρ ρ.eff
k1 = Coefficient to account for bond of rebar
= 0.8
k2 = Coeffcient to account for distribution of strain
= 0.5
ρ ρ.eff = A s /A c.eff
= 1768.00 kNm
= 2542.25 kNm
D = 1600
Cover = 40
d = 1560 mm
b = 3000 mm
2
fck = 35 N/mm
2
fy = 500 N/mm
bt = 650 mm
At 2.80 support
2
Asw = 2 x pi/4 x 12 x 12 = 226.19 mm
s = 150.00 mm
Z = 0.9 x 1560 = 1404
2
f ywd = fy / γm 500.00 / 1.15 = 434.7826087 N/mm
D
θ = 45.00
Deflection = 5 M L^2/48 EI
span L = 16.6 m
Ixx = 3.20E+07 mm4
Cracked moment of inertia = 70 % of uncracked moment of inertia
= 3.20E+07 x 0.7 = 2.24E+07 mm4
E = 29580.4 N/ sq mm
Deflection = 5x 2369.20 x 10^6 x 16600 ^2
/ 48 / 29580.4 / 2.24E+10
= 102.5 mm
ie, = SPAN / 161.9
End Diaphragm
1400
400
Wearing coat 11 kN
Wearing coat 31 kN
Total factored load 274.3 kN
1 7 1
323.3
350.25 284
Max SF 357.25
β1 = 0.80952
β2 = 0.41597
Vu = 357.25 kN m
2
Asw = 2 x pi/4 x 12 x 12 = 226.19 mm
s = 150.00 mm
Z = 0.9 x 1360 = 1224 mm
2
f ywd = fy / γm = 500 / 1.15 = 434.78 N/mm
D
θ = 45.00
1200
400
BM SF
WC 32 kN-m 12 kN
LL
70R W 293 kN-m 118 kN
70R T 268 kN-m 109 kN
Class A 2 lane 145 kN-m 61 kN
Design SF 287.55 kN
= 131.84 mm
Vu = 287.55 kN /
2
Asw = 2 x pi/4 x 12 x 12 = 226.19 mm
s = 150.00 mm
Z = 0.9 x 1160.00 = 1044 mm
2
f ywd = fy / γm = 500 / 1.15 = 434.78 N/mm
D
θ = 45.00
12 SLAB DESIGN
Super imposed dead load
Self wt. of slab = 5 kN/m2
2
Wt. of wearing coat = 1.3 kN/m
2
Total = 6.3 kN/m
1.5 3 3 3 1.5
LIVE LOAD
D = 200 mm
Cover = 40 mm
d = 152 mm
b = 1000 mm
2
fck = 35 N/mm
2
fy = 500 N/mm
bt = 1000 mm
β1 = 0.80952
β2 = 0.41597
fcd = αf ck /γ c = 0.67 x 35 / 1.5
2
= 15.63 N/mm
2 0.5
Neutral axis x = (d/2β 2 )-((d/2β 2 ) -(M Ed /β 1 β 2 bf cd ))
= 25.50 mm
To check adequacy of section
xlim = ε cu /(ε cu +ε yd ) d
εyd = 0.002173913
xlim = 93.76 mm > 25.5 mm
Lever arm z = 152 - 0.416 x 25.5 = 141.4 mm
2
Ast = MEd/0.87fyz = 741.8 mm
2
Provide 16 mm dia bars at 150 mm c/c = 1339.7 mm at bottom
12 mm dia bars at 150 mm c/c 2 nos
1507.2 mm2 at top
=
Min % reqd. = 254.4 mm2
2
197.6 mm
bw = 1000 mm
d = 152 mm
fck = 35 N/ mm2
K = 1+ 200 < 2
d
= 2.15 > 2
2
Asl = Area of tensile reinforcement = 1507.2 mm
= 109188.4 N = 109.19 kN