CHILLED/HOT WATER PIPING HYDRO TEST REPORT

PIPING PRESSSURE TEST DETAILS


Customer Name Test Report No
Project Name Test date
Chilled Water Piping /Manifold
Drawing No Test Line
/ Hot Water Piping /Manifold
INSTRUMENT DETAILS
Instrument Used Serial No
Calibrated on Calibration Due on

ACCEPTANCE CRITERIA
Test shall be performed for a minimum period of 8 hours with no fluctuation in pressure
PRESSURE TEST DATA
Design Pressure Tested Pressure Test Duration Time Observed Pressure
Kg/cm2 Kg/cm2 From To Kg/cm2

OBSERVATION REPORT
Pressure Drop Observed YES NO
Whether any leakages found in pipelines/manifolds YES NO

The test Carried out found Satisfactory Not Satisfactory


CUSTOMER COMMENTS:

Test Conducted By: Test Witnessed By: Test Reviewed & Approved By:
For For For
Sign & Date Sign & Date Sign & Date

Name: Name: Name:


Designation: Designation: Designation: