Professional Documents
Culture Documents
26071-100-GPP-GHX-00025-001 Illness Notification and Reporting Procedure
26071-100-GPP-GHX-00025-001 Illness Notification and Reporting Procedure
: 26071-100-GPP-GHX-00025
REVISION LOG
Page 2 of 8
Doc. No. : 26071-100-GPP-GHX-00025
Table of Contents
1. PURPOSE................................................................................................................................................. 4
2. SCOPE ...................................................................................................................................................... 4
3. DEFINITION ........................................................................................................................................... 4
4. REFERENCE ........................................................................................................................................... 5
5. RESPONSIBILITIES .............................................................................................................................. 5
5.1 Project manager ......................................................................................................................................... 5
5.2 Construction Manager ............................................................................................................................... 5
5.3 Construction Superintendent...................................................................................................................... 5
5.4 HSE Manager............................................................................................................................................. 5
5.5 HSE Chief .................................................................................................................................................. 5
5.6 HSE Superintendent & Supervisor ............................................................................................................ 5
5.7 SITE DOCTOR ......................................................................................................................................... 6
5.8 HEALTH/ MEDICAL ADVISOR ............................................................................................................ 6
5.9 PARAMEDIC ............................................................................................................................................ 6
5.10 Employee ................................................................................................................................................... 6
6. DETAILS PROCEDURES ..................................................................................................................... 6
6.1 Notification and Communication Channel ................................................................................................ 7
6.2 Emergency Contact Number ...................................................................................................................... 7
6.3 Reporting and Investigation ....................................................................................................................... 7
Page 3 of 8
Doc. No. : 26071-100-GPP-GHX-00025
1. PURPOSE
This procedure describes the reporting protocol for serious illnesses personnel occurred on site
This procedure also to support prevention, treatment & rehabilitation of illness personnel,
especially for possible work related illness
Occupational illness resulting of exposures to work or work environment, must be handle
carefully due to this is recordable to project achievement
2. SCOPE
This procedure covers the reporting of Serious illness in RDMP Balikpapan JO.Procedure for
reporting injury shall refer to Doc. No : 20671-100-GPP-GHX-00019 (Incident Investigation And
Reporting Procedure)
3. DEFINITION
Page 4 of 8
Doc. No. : 26071-100-GPP-GHX-00025
• Regulation of the Minister of Manpower No. 5/2018 regarding Occupational Health and
Safety
• Goverment Regulation no.7/2019 regarding Occupational Illness
• Regulation of the Minister of Health No. 70/2016 regarding industrial work environment
standards & requirements
• Regulation of the Minister of Manpower No.3/1998 regarding procedure for accident
reporting & investigation
• HSE Plan Doc. No. : 26071-100-G01-GHX-00001
• Project Emergency Handling Procedure Doc. No. : 26071-100-GPP-GHX-00002
• Incident Investigation and Reporting procedure Doc. No. : 26071-100-GPP-GHX-00019
5. RESPONSIBILITIES
Page 5 of 8
Doc. No. : 26071-100-GPP-GHX-00025
5.9 PARAMEDIC
• Respond immediately and deliver initial stabilization for injured / illness person at the scene prior
transfer to site clinic.
• Assist Site Doctor in implementation of health management programs,
• Assist Site Doctor to identify health hazards in the work place, implement control and monitoring
program
5.10 EMPLOYEE
• An employee who sustains an injury or becomes ill as a result of workplace conditions or
work activity must verbally report the injury or illness to any manager/supervisor
immediately (not necessarily their own).
6. DETAILS PROCEDURES
Contractor will provide site clinic for Primary treatment & Health-Medical Program, Any
suspicious work related illness case(s) found, should be evaluated & investigated by Health
Advisor. If still any doubt, Health advisor may consult the case to Medical consultant / specialist.
Contractor will provide site clinic for Primary treatment & Health-Medical Program, Any
suspicious work related illness case(s) found, should be evaluated & investigated by Health
Advisor. If still any doubt, Health advisor may consult the case to Medical consultant / specialist
Health Medical Advisor & Chief HSE should immediately report Confirmed Occupational
illness case(s) to Project Manager, Project HSE Manager& Contruction Manager.
Construction Manager should provide full support to the possible work related illness personnel,
to include: appropriate treatment, transportation & escorting to medical facility, assist insurance
claim process, etc. Site Doctor will provide Medical Notification to explain patient condition &
maintain confidentiality
Page 6 of 8
Doc. No. : 26071-100-GPP-GHX-00025
Serious
illness HSE
Manager
Onsite
Doctor
Contractor under the regulation is to keep a record of all work-related injuries, illnesses, and
dangerous events. Contractor is also required to have effective processes for investigating
workplace-related incidents and illnesses and for the implementation of corrective and preventive
actions.
All workplace incidents, injuries, illnesses and near misses must be recorded as soon as
possible but no more than within two days of occurring; however notifiable incidents must be
reported immediately after becoming aware of the notifiable incident
Detail please refer Incident Investigation and Reporting Procedure Doc. No. : 26071-100-GPP-
GHX-00019
Page 7 of 8
Doc. No. : 26071-100-GPP-GHX-00025
Balikpapan, ……………………….
Medical Examiner
_________________________
Page 8 of 8