Structural diagram
1.2. Basic working platform data
Table 1-1. Dimension of working platform items
No Items Dimension
Shape: Rectangle
2 Transverse Beams Dimension: B= 1000mm
H= 1600mm
Shape: Rectangle
3 Longitudinal Beams Dimension: B= 1000mm
H= 1600mm
Live load 1
Live load 2
Live load 3
Live load 4
Current load
1.4. Load combination
Table 1-2. Load combination ULS
LIVE LOAD
COMB DEAD Current
LL 1 LL 2 LL 3 LL 4
TH1 1.35 0.9
TH2 1.35 1.5 0.9
TH3 1.35 1.5 0.9
TH4 1.35 1.5 0.9
TH5 1.35 1.5 0.9
BAO Envelope
LIVE LOAD
COMB DEAD Current
LL 1 LL 2 LL 3 LL 4
TH6 1 0.6
TH7 1 1 0.6
TH8 1 1 0.6
TH9 1 1 0.6
TH10 1 1 0.6
BAO Envelope
Pile cracking
Force
moment D600
Cases Conclusion
M2 M3 Mtc [M]
(Tm) (Tm) (Tm) (Tm)
M2max 0,81 1,57 1,77 29,0 Pass
M2min -0,99 1,89 2,13 29,0 Pass
M3max -0,42 2,49 2,53 29,0 Pass
M3min 0,19 -3,97 3,97 29,0 Pass
Pile cracking
Force
moment D600
Cases Conclusion
M2 M3 Mtc [M]
(Tm) (Tm) (Tm) (Tm)
M2max 1,54 1,99 2,52 29,0 Pass
M2min -1,20 1,13 1,65 29,0 Pass
M3max -0,06 3,25 3,25 29,0 Pass
M3min 1,54 -4,31 4,58 29,0 Pass
1.6.2. Pile bearing capacity based on material
Name of project:
Location:
Investment owner:
Implementing unit:
(PHC)
Pile type: (Pipe Pile) Tròn - DUL
Pile size: D = 0.6 m
t = 0.11 m
Nc,u = nc.n.md.N + Gc = 288.2 T
Gc = 8.31 T N = 223.9 T
VL = 2.50 T/m3 n = 1.25
2
Fc = 0.17 m nc = 1.00
L.W.L = 1.00 m mđ = 1.00
Pile length: L = 32.00 m
Free pile length: L0 = 14.50 m
Length of pile in ground: Lđ = 17.50 m
Pile top elevation: Top = 3.00 m
Pile bottom elevation: Toe = -29.00 m
Dredging elevation: Ground = -11.50 m
GEOLOGICAL DATA, BORE HOLE: HK1 17.50 3.00
Soil Elevation
Name of soil type li (m) Table A1 Calc
layer bottom (IL)
1 very soft grey silty clay 9.50 -21.00 0.70 Sét X -11.50
2 stiff grey clay 2.50 -23.50 0.25 Sét X
3 stiff brownish grey clay 2.50 -26.00 0.25 Sét X
4 hard orangish silty clay 2.50 -28.50 0.25 Sét X
5 very hard red clay 0.50 -35.00 0.00 X
-29.00
Layer 5: very hard red clay
qp = 1215.00
GEOTECHNICAL PILE CAPACITY (COMPRESSION PILE):
Ultimate Pile Resistance is determined by the sum skin friction and base resistance of Pile, according formula:
Rc,u = c (cq . qb. Ab + u . ∑ cf . fi . li) = 437.57 T
In there Symbol Value Explain
c = 1.00 The coefficient of working conditions of the pile in the soil
cq = 1.00 The coefficients of working conditions of the soil under the nose
qb = 1215.00 The resistance strength of the soil below the tip of the pile
Ab = 0.28 The area of the pile against the ground
u = 1.88 The circumference of the cross section of the pile body
cf = 1.00 The coefficients of working conditions on the pile body taking
fi - The average resistance intensity of the "i" soil layer on the pile body
li - The length of the pile segment in the "i" soil layer
Soil Element Mind Lateral Lateral Stop The calculation skin friction of pile
Bottom elevation W.C.C
Layer thickness elevation friction friction condition is carried out by calculating with each small pile section
i lj zj hj fj cf cf .fj.lj in the soil layers
0 0 0 0 0 0 49.89 17.5 Shaft Resistance chart according to depth
1 1 0.5 1 0 1 0 continue
0
1 1 1.5 2 0.55 1 0.55 continue 0
0.3
1 1 2.5 3 0.75 1 0.75 continue 0.45
0 1 19.5 20 0 1 0 stop 0
0
0 1 20.5 21 0 1 0 stop 0
0 1 23.5 24 0 1 0 stop 0
0
0 1 24.5 25 0 1 0 stop 0
0 1 25.5 26 0 1 0 stop 0
0
0 1 26.5 27 0 1 0 stop 0
0 1 27.5 28 0 1 0 stop 0
0
0 1 28.5 29 0 1 0 stop -40
0
0 1 29.5 30 0 1 0 stop 0
0 1 30.5 31 0 1 0 stop 0
0
0 1 31.5 32 0 1 0 stop 0
0 1 32.5 33 0 1 0 stop 0
0
0 1 33.5 34 0 1 0 stop 0
0 1 34.5 35 0 1 0 stop 0
0
0 1 35.5 36 0 1.3 0 stop -50
0
0 1 36.5 37 0 1.3 0 stop
0 1 37.5 38 0 1.3 0 stop
0 1 38.5 39 0 1.3 0 stop
0 1 39.5 40 0 1.3 0 stop
0 1 40.5 41 0 1.3 0 stop
0 1 41.5 42 0 1.3 0 stop
0 1 42.5 43 0 1.3 0 stop -60
Name of project:
Location:
Investment owner:
Implementing unit:
(PHC)
Pile type: (Pipe Pile) Tròn - DUL
Pile size: D = 0.6 m
t = 0.11 m
Nc,u = nc.n.md.N + Gc = 412.7 T
Gc = 8.31 T N = 323.5 T
VL = 2.50 T/m3 n = 1.25
2
Fc = 0.17 m nc = 1.00
L.W.L = 1.00 m mđ = 1.00
Pile length: L = 32.00 m
Free pile length: L0 = 14.50 m
Length of pile in ground: Lđ = 17.50 m
Pile top elevation: Top = 3.00 m
Pile bottom elevation: Toe = -29.00 m
Dredging elevation: Ground = -11.50 m
GEOLOGICAL DATA, BORE HOLE: HK1 17.50 3.00
Soil Elevation
Name of soil type li (m) Table A1 Calc
layer bottom (IL)
1 very soft grey silty clay 9.50 -21.00 0.70 Sét X -11.50
2 stiff grey clay 2.50 -23.50 0.25 Sét X
3 stiff brownish grey clay 2.50 -26.00 0.25 Sét X
4 hard orangish silty clay 2.50 -28.50 0.25 Sét X
5 very hard red clay 0.50 -35.00 0.00 X
-29.00
Layer 5: very hard red clay
qp = 1215.00
GEOTECHNICAL PILE CAPACITY (COMPRESSION PILE):
Ultimate Pile Resistance is determined by the sum skin friction and base resistance of Pile, according formula:
Rc,u = c (cq . qb. Ab + u . ∑ cf . fi . li) = 437.57 T
In there Symbol Value Explain
c = 1.00 The coefficient of working conditions of the pile in the soil
cq = 1.00 The coefficients of working conditions of the soil under the nose
qb = 1215.00 The resistance strength of the soil below the tip of the pile
Ab = 0.28 The area of the pile against the ground
u = 1.88 The circumference of the cross section of the pile body
cf = 1.00 The coefficients of working conditions on the pile body taking
fi - The average resistance intensity of the "i" soil layer on the pile body
li - The length of the pile segment in the "i" soil layer
Soil Element Mind Lateral Lateral Stop The calculation skin friction of pile
Bottom elevation W.C.C
Layer thickness elevation friction friction condition is carried out by calculating with each small pile section
i lj zj hj fj cf cf .fj.lj in the soil layers
0 0 0 0 0 0 49.89 17.5 Shaft Resistance chart according to depth
1 1 0.5 1 0 1 0 continue
0
1 1 1.5 2 0.55 1 0.55 continue 0
0.3
1 1 2.5 3 0.75 1 0.75 continue 0.45
0 1 19.5 20 0 1 0 stop 0
0
0 1 20.5 21 0 1 0 stop 0
0 1 23.5 24 0 1 0 stop 0
0
0 1 24.5 25 0 1 0 stop 0
0 1 25.5 26 0 1 0 stop 0
0
0 1 26.5 27 0 1 0 stop 0
0 1 27.5 28 0 1 0 stop 0
0
0 1 28.5 29 0 1 0 stop -40
0
0 1 29.5 30 0 1 0 stop 0
0 1 30.5 31 0 1 0 stop 0
0
0 1 31.5 32 0 1 0 stop 0
0 1 32.5 33 0 1 0 stop 0
0
0 1 33.5 34 0 1 0 stop 0
0 1 34.5 35 0 1 0 stop 0
0
0 1 35.5 36 0 1.3 0 stop -50
0
0 1 36.5 37 0 1.3 0 stop
0 1 37.5 38 0 1.3 0 stop
0 1 38.5 39 0 1.3 0 stop
0 1 39.5 40 0 1.3 0 stop
0 1 40.5 41 0 1.3 0 stop
0 1 41.5 42 0 1.3 0 stop
0 1 42.5 43 0 1.3 0 stop -60
1.8. Conclusion
The piles of the working platform do not have enough bearing capacity
It is necessary to add piles or increase the pile diameter for the working platform or
the operating load on the working platform must not exceed 2T/m2.
BERTHING AND MOORING DOLPHIN
Structural diagram
2.2. Basic specifications of berthing dolphin
Table 2-14. Dimension of Berthing dolphin items
No Items Dimension
Live load 1
Live load 2
Berthing load
Morring load
Current load load
2.4. Load combination
Table 2-15. Load combination ULS
Live load
Comb Dead Current load Mooring load Berthing load
LL 1 LL 2
TH1 1.35 0.9
TH2 1.35 1.5 0.9
TH3 1.35 1.5 0.9
TH4 1.35 0.9 1.5
TH5 1.35 1.5 0.9 1.5
TH6 1.35 1.5 0.9 1.5
TH7 1.35 0.9 1.5
TH8 1.35 1.5 0.9 1.5
TH9 1.35 1.5 0.9 1.5
BAO Envelope
Live load
Comb Dead Current load Mooring load Berthing load
LL 1 LL 2
TH10 1 0.6
TH11 1 1 0.6
Live load
Comb Dead Current load Mooring load Berthing load
LL 1 LL 2
TH12 1 1 0.6
TH13 1 0.6 1
TH14 1 1 0.6 1
TH15 1 1 0.6 1
TH16 1 0.6 1
TH17 1 1 0.6 1
TH18 1 1 0.6 1
BAO Envelope
Pile cracking
Force
moment D600
Cases Conclusion
M2 M3 Mtc [M]
(Tm) (Tm) (Tm) (Tm)
M2max 16,15 13,97 21,35 29,0 Pass
M2min -17,70 -20,61 27,17 29,0 Pass
M3max 8,74 26,27 27,69 29,0 Pass
M3min -10,27 -26,97 28,86 29,0 Pass
Pile cracking
Force
moment D600
Cases Conclusion
M2 M3 Mtc [M]
(Tm) (Tm) (Tm) (Tm)
M2max 17,07 16,11 23,47 29,0 Pass
M2min -17,93 -22,67 28,90 29,0 Pass
M3max 8,71 26,33 27,73 29,0 Pass
M3min -10,26 -28,45 30,24 29,0 Not Pass
2.6.2. Pile bearing capacity based on material
Name of project:
Location:
Investment owner:
Implementing unit:
(PHC)
Pile type: (Pipe Pile) Tròn - DUL
Pile size: D = 0.6 m
t = 0.11 m
Nc,u = nc.n.md.N + Gc = 275.8 T
Gc = 8.31 T N = 214.0 T
VL = 2.50 T/m3 n = 1.25
2
Fc = 0.17 m nc = 1.00
L.W.L = 1.00 m mđ = 1.00
Pile length: L = 32.00 m
Free pile length: L0 = 14.50 m
Length of pile in ground: Lđ = 17.50 m
Pile top elevation: Top = 3.00 m
Pile bottom elevation: Toe = -29.00 m
Dredging elevation: Ground = -11.50 m
GEOLOGICAL DATA, BORE HOLE: HK1 17.50 3.00
Soil Elevation
Name of soil type li (m) Table A1 Calc
layer bottom (IL)
1 very soft grey silty clay 9.50 -21.00 0.70 Sét X -11.50
2 stiff grey clay 2.50 -23.50 0.25 Sét X
3 stiff brownish grey clay 2.50 -26.00 0.25 Sét X
4 hard orangish silty clay 2.50 -28.50 0.25 Sét X
5 very hard red clay 0.50 -35.00 0.00 X
-29.00
Layer 5: very hard red clay
qp = 1215.00
GEOTECHNICAL PILE CAPACITY (COMPRESSION PILE):
Ultimate Pile Resistance is determined by the sum skin friction and base resistance of Pile, according formula:
Rc,u = c (cq . qb. Ab + u . ∑ cf . fi . li) = 437.57 T
In there Symbol Value Explain
c = 1.00 The coefficient of working conditions of the pile in the soil
cq = 1.00 The coefficients of working conditions of the soil under the nose
qb = 1215.00 The resistance strength of the soil below the tip of the pile
Ab = 0.28 The area of the pile against the ground
u = 1.88 The circumference of the cross section of the pile body
cf = 1.00 The coefficients of working conditions on the pile body taking
fi - The average resistance intensity of the "i" soil layer on the pile body
li - The length of the pile segment in the "i" soil layer
Soil Element Mind Lateral Lateral Stop The calculation skin friction of pile
Bottom elevation W.C.C
Layer thickness elevation friction friction condition is carried out by calculating with each small pile section
i lj zj hj fj cf cf .fj.lj in the soil layers
0 0 0 0 0 0 49.89 17.5 Shaft Resistance chart according to depth
1 1 0.5 1 0 1 0 continue
0
1 1 1.5 2 0.55 1 0.55 continue 0
0.3
1 1 2.5 3 0.75 1 0.75 continue
0.45
1 1 3.5 4 0.85 1 0.85 continue 0.5
5 1 17.5 18 0 1 0 stop 0
0
0 1 18.5 19 0 1 0 stop 0
0 1 19.5 20 0 1 0 stop 0
0
0 1 20.5 21 0 1 0 stop 0
0 1 21.5 22 0 1 0 stop -30
0
0
0 1 22.5 23 0 1 0 stop
0
0 1 23.5 24 0 1 0 stop 0
0 1 24.5 25 0 1 0 stop 0
0
0 1 25.5 26 0 1 0 stop 0
0 1 26.5 27 0 1 0 stop 0
0
0 1 27.5 28 0 1 0 stop 0
0 1 28.5 29 0 1 0 stop -40
0
0
0 1 29.5 30 0 1 0 stop 0
0 1 30.5 31 0 1 0 stop 0
0
0 1 31.5 32 0 1 0 stop
0
0 1 32.5 33 0 1 0 stop 0
0 1 33.5 34 0 1 0 stop 0
0
0 1 34.5 35 0 1 0 stop 0
Name of project:
Location:
Investment owner:
Implementing unit:
(PHC)
Pile type: (Pipe Pile) Tròn - DUL
Pile size: D = 0.6 m
t = 0.11 m
Nc,u = nc.n.md.N + Gc = 154.2 T
Gc = 8.31 T N = 130.0 T
VL = 2.50 T/m3 n = 1.25
2
Fc = 0.17 m nc = 1.00
L.W.L = 1.00 m mđ = 1.00
Pile length: L = 32.00 m
Free pile length: L0 = 14.50 m
Length of pile in ground: Lđ = 17.50 m
Pile top elevation: Top = 3.00 m
Pile bottom elevation: Toe = -29.00 m
Dredging elevation: Ground = -11.50 m
GEOLOGICAL DATA, BORE HOLE: HK1 17.50 3.00
Soil Elevation
Name of soil type li (m) Table A1 Calc
layer bottom (IL)
1 very soft grey silty clay 9.50 -21.00 0.70 Sét X -11.50
2 stiff grey clay 2.50 -23.50 0.25 Sét X
3 stiff brownish grey clay 2.50 -26.00 0.25 Sét X
4 hard orangish silty clay 2.50 -28.50 0.25 Sét X
5 very hard red clay 0.50 -35.00 0.00 X
-29.00
Soil Element Mind Lateral Lateral Stop The calculation skin friction of pile
Bottom elevation W.C.C
Layer thickness elevation friction friction condition is carried out by calculating with each small pile section
i lj zj hj fj cf cf .fj.lj in the soil layers
0 0 0 0 0 0 49.89 17.5 Shaft Resistance chart according to depth
1 1 0.5 1 0 1 0 continue
0
1 1 1.5 2 0.55 1 0.55 continue 0
0.3
1 1 2.5 3 0.75 1 0.75 continue 0.45
0 1 19.5 20 0 1 0 stop 0
0
0 1 20.5 21 0 1 0 stop 0
0 1 23.5 24 0 1 0 stop 0
0
0 1 24.5 25 0 1 0 stop 0
0 1 25.5 26 0 1 0 stop 0
0
0 1 26.5 27 0 1 0 stop 0
0 1 27.5 28 0 1 0 stop 0
0
0 1 28.5 29 0 1 0 stop -40
0
0 1 29.5 30 0 1 0 stop 0
0 1 30.5 31 0 1 0 stop 0
0
0 1 31.5 32 0 1 0 stop 0
0 1 32.5 33 0 1 0 stop 0
0
0 1 33.5 34 0 1 0 stop 0
0 1 34.5 35 0 1 0 stop 0
0
0 1 35.5 36 0 1.3 0 stop -50
0
0 1 36.5 37 0 1.3 0 stop
0 1 37.5 38 0 1.3 0 stop
0 1 38.5 39 0 1.3 0 stop
0 1 39.5 40 0 1.3 0 stop
0 1 40.5 41 0 1.3 0 stop
0 1 41.5 42 0 1.3 0 stop
0 1 42.5 43 0 1.3 0 stop -60
Name of project:
Location:
Investment owner:
Implementing unit:
(PHC)
Pile type: (Pipe Pile) Tròn - DUL
Pile size: D = 0.6 m
t = 0.11 m
Nc,u = nc.n.md.N + Gc = 313.3 T
Gc = 8.31 T N = 244.0 T
VL = 2.50 T/m3 n = 1.25
2
Fc = 0.17 m nc = 1.00
L.W.L = 1.00 m mđ = 1.00
Pile length: L = 32.00 m
Free pile length: L0 = 14.50 m
Length of pile in ground: Lđ = 17.50 m
Pile top elevation: Top = 3.00 m
Pile bottom elevation: Toe = -29.00 m
Dredging elevation: Ground = -11.50 m
GEOLOGICAL DATA, BORE HOLE: HK1 17.50 3.00
Soil Elevation
Name of soil type li (m) Table A1 Calc
layer bottom (IL)
1 very soft grey silty clay 9.50 -21.00 0.70 Sét X -11.50
2 stiff grey clay 2.50 -23.50 0.25 Sét X
3 stiff brownish grey clay 2.50 -26.00 0.25 Sét X
4 hard orangish silty clay 2.50 -28.50 0.25 Sét X
5 very hard red clay 0.50 -35.00 0.00 X
-29.00
Layer 5: very hard red clay
qp = 1215.00
GEOTECHNICAL PILE CAPACITY (COMPRESSION PILE):
Ultimate Pile Resistance is determined by the sum skin friction and base resistance of Pile, according formula:
Rc,u = c (cq . qb. Ab + u . ∑ cf . fi . li) = 437.57 T
In there Symbol Value Explain
c = 1.00 The coefficient of working conditions of the pile in the soil
cq = 1.00 The coefficients of working conditions of the soil under the nose
qb = 1215.00 The resistance strength of the soil below the tip of the pile
Ab = 0.28 The area of the pile against the ground
u = 1.88 The circumference of the cross section of the pile body
cf = 1.00 The coefficients of working conditions on the pile body taking
fi - The average resistance intensity of the "i" soil layer on the pile body
li - The length of the pile segment in the "i" soil layer
Soil Element Mind Lateral Lateral Stop The calculation skin friction of pile
Bottom elevation W.C.C
Layer thickness elevation friction friction condition is carried out by calculating with each small pile section
i lj zj hj fj cf cf .fj.lj in the soil layers
0 0 0 0 0 0 49.89 17.5 Shaft Resistance chart according to depth
1 1 0.5 1 0 1 0 continue
0
1 1 1.5 2 0.55 1 0.55 continue 0
0.3
1 1 2.5 3 0.75 1 0.75 continue
0.45
1 1 3.5 4 0.85 1 0.85 continue 0.5
5 1 17.5 18 0 1 0 stop 0
0
0 1 18.5 19 0 1 0 stop 0
0 1 19.5 20 0 1 0 stop 0
0
0 1 20.5 21 0 1 0 stop 0
0 1 21.5 22 0 1 0 stop -30
0
0
0 1 22.5 23 0 1 0 stop
0
0 1 23.5 24 0 1 0 stop 0
0 1 24.5 25 0 1 0 stop 0
0
0 1 25.5 26 0 1 0 stop 0
0 1 26.5 27 0 1 0 stop 0
0
0 1 27.5 28 0 1 0 stop 0
0 1 28.5 29 0 1 0 stop -40
0
0
0 1 29.5 30 0 1 0 stop 0
0 1 30.5 31 0 1 0 stop 0
0
0 1 31.5 32 0 1 0 stop
0
0 1 32.5 33 0 1 0 stop 0
0 1 33.5 34 0 1 0 stop 0
0
0 1 34.5 35 0 1 0 stop 0
Name of project:
Location:
Investment owner:
Implementing unit:
(PHC)
Pile type: (Pipe Pile) Tròn - DUL
Pile size: D = 0.6 m
t = 0.11 m
Nc,u = nc.n.md.N + Gc = 154.2 T
Gc = 8.31 T N = 130.0 T
VL = 2.50 T/m3 n = 1.25
2
Fc = 0.17 m nc = 1.00
L.W.L = 1.00 m mđ = 1.00
Pile length: L = 32.00 m
Free pile length: L0 = 14.50 m
Length of pile in ground: Lđ = 17.50 m
Pile top elevation: Top = 3.00 m
Pile bottom elevation: Toe = -29.00 m
Dredging elevation: Ground = -11.50 m
GEOLOGICAL DATA, BORE HOLE: HK1 17.50 3.00
Soil Elevation
Name of soil type li (m) Table A1 Calc
layer bottom (IL)
1 very soft grey silty clay 9.50 -21.00 0.70 Sét X -11.50
2 stiff grey clay 2.50 -23.50 0.25 Sét X
3 stiff brownish grey clay 2.50 -26.00 0.25 Sét X
4 hard orangish silty clay 2.50 -28.50 0.25 Sét X
5 very hard red clay 0.50 -35.00 0.00 X
-29.00
Soil Element Mind Lateral Lateral Stop The calculation skin friction of pile
Bottom elevation W.C.C
Layer thickness elevation friction friction condition is carried out by calculating with each small pile section
i lj zj hj fj cf cf .fj.lj in the soil layers
0 0 0 0 0 0 49.89 17.5 Shaft Resistance chart according to depth
1 1 0.5 1 0 1 0 continue
0
1 1 1.5 2 0.55 1 0.55 continue 0
0.3
1 1 2.5 3 0.75 1 0.75 continue 0.45
0 1 19.5 20 0 1 0 stop 0
0
0 1 20.5 21 0 1 0 stop 0
0 1 23.5 24 0 1 0 stop 0
0
0 1 24.5 25 0 1 0 stop 0
0 1 25.5 26 0 1 0 stop 0
0
0 1 26.5 27 0 1 0 stop 0
0 1 27.5 28 0 1 0 stop 0
0
0 1 28.5 29 0 1 0 stop -40
0
0 1 29.5 30 0 1 0 stop 0
0 1 30.5 31 0 1 0 stop 0
0
0 1 31.5 32 0 1 0 stop 0
0 1 32.5 33 0 1 0 stop 0
0
0 1 33.5 34 0 1 0 stop 0
0 1 34.5 35 0 1 0 stop 0
0
0 1 35.5 36 0 1.3 0 stop -50
0
0 1 36.5 37 0 1.3 0 stop
0 1 37.5 38 0 1.3 0 stop
0 1 38.5 39 0 1.3 0 stop
0 1 39.5 40 0 1.3 0 stop
0 1 40.5 41 0 1.3 0 stop
0 1 41.5 42 0 1.3 0 stop
0 1 42.5 43 0 1.3 0 stop -60
2.8. Conclusion
The piles of the berthing + mooring dolphin do not have enough bearing capacity
It is necessary to add piles or increase the pile diameter for the berthing + mooring
dolphin or the operating load on the berthing + mooring dolphin must not exceed
2T/m2.