You are on page 1of 10
T | if {i D| 5/8 | is ™ DH IMAG I || Fus c} 198 is | tw DH INTERMEDIATE ISSUE || us B | 04/96 Is DWH DH FINAL-DRAFF = EUS A| 06/95 | 1S | DWH | DH ___ ORIGINAL ISSUE - DRAFT PRE | Rev | DATE aut | CHECK ae MODIFICATIONS aoe __ CONTRACTOR DOCUMENT REVIEW a joe REVIEW STATUS. 5 £ [eee A= APPROVED v fae B= APPROVED AS NOTED bate 1 C= NOT APPROVED = = [mee 1S INFORMATION - COMM No, parr. © | conmpactor APPROVAL DOES NOT a oe 7 [RecoRo. RELIEVE CONTRACTOR FOR| * Teonerema RESPONSBILTY FOR ERROR ooh eee _| 2 [hoon OR DEMATIONS TO FULFIL our | 1 [mero His CONTRACTUAL Bee 5 [aPro. OBLIGATIONS PERUSAHAAN UMUM LISTRIK NEGARA AGENCY OF THE MINISTRY OF MINES AND ENERGY OF THE GOVERNMENT OF THE REPUBLIC OF INDONESIA OMBILIN STEAM POWER PLANT - UNITS | & I 2x 100MW CONTRACT No : 058 . PJP/922/1993/M PUSAT PELAYANAN ENJINIRING AYA CM -AHMEYER Fan Somer Li NTERNATIONAL, ce MAINTENANCE MANUAL VOLUME 4 SECTION 4C ASH HANDLING PLANT (820) BOOK 2 SCALE SUPPLIER NAME SUPPUER No size PARTNER No | GEC ALSTHOM Vv Q ‘CEGELEC iE SAEs LON PPG - INGENIERIE : DUMEZ SO RECTRONECANIGUE 3 2 3 ‘ 5 ‘19AF/820-, ae : ig CONT Ne. OBN/00/19AF/820-/MF/005 | | | MICROFILM AL | | test THIS DOCUMENT |S ISSUER PROPERTY IT CANNOT BE USED, REPRODUCED, TT TRANSMITTED AND/OR DISCLOSED WITHOUT PRIOR WRITTEN PERMISSION. > ‘Maintenance Manual ‘System 820 ‘Ash Handling Plant v |OBN/00/19AF/820-/MF/005 GEC ALSTHOM Drawings ENGINEERING SYSTEMS Page 16-1 OMBILIN Steam Power Plant Unit 1 and 2 (2 x 100MW) 16. DRAWINGS TITLE BOOK 2 DRAWING NO. This binder contains the following listed drawings Coal, Ash and Fuel Oil System General Layout - Plan ©BN/00/19AF/00--/IG/001 Pulley Schedule (Drives) OBN/00/19AF/815-/LE/010 Pulley Schedule (Non-Drives) OBN/00/19AF/815-/LE/011 Technical Specification for Switchgear Mechanical Safety Interlock Scheme Coal and Ash 6kV Distribution Board OBN/00/19AF/815-/MS/703 Conveyor DOL MCC Starter With PLC Interface OBN/00/19AF/815-/SD/001 Conveyor DOL MCC Starter With PLC Interface OBN/00/19AF/815-/SD/002 Motor Anti-Condensation Heating Power and Cubicle Heater Circuit OBN/00/19AF/815-/SD/003 MV/LV Power Distribution Single Line Diag. OBN/00/1 9AF/815-/SU/001 6kV Power Single Line Diagram OBN/00/19AF/815-/SU/002 MY Safety Key Interlock Scheme 6kV Distribution Board OBN/00/19AF/815-/SU/003 MV/LV Switchgear Mechanical Safety Key Interlocking Scheme OBN/00/1 9AF/815-/SU/004 48VDC Power Distribution Single Line Diagram OBN/00/19AF/815-/SU/005 220VDC Power Distribution Single Line Diagram OBN/00/19AF/815-/SU/006 Revision A B c D Date of Issue 6/95. A196 na 4/98 [Map5674/9714 a ‘Maintenance Manual System 820 Vv GEC ALSTHOM ENGINEERING SYSTEMS Ash Handling Plant }OBN/00/19AF/820-/MF/005 Drawings Page 16 - 2 OMBILIN Steam Power Plant Unit 1 and 2 (2 x 100MW) TITLE 220VAC UPS Distribution Single Line Diagram 220VAC Utility Power Distribution Single Line Diagram Ash Distribution Mimic Diagram PLC System Block Diagram PLC Connections and Switch Settings 380V LV Power Single Line Diagram PWR Distribution and Motor Control Centre 380V LV Power Single Line Diagram PWR Distribution and Motor Control Centre Vacuum Extraction Flow Diagram BOOK 3 DRAWING NO. OBN/00/19AF/815-/SU/007 OBN/00/19AF/815-/SU/008 OBN/00/19AF/820-/CH/701 OBN/00/1 9AF/820-/FM/700 OBN/00/19AF/820-/FM/701 & 702 OBN/00/19AF/820-/SU/001 OBN/00/19AF/820-/SU/002 OBN/00/19AF/FAX-/SP/004 This binder contains the following listed drawings Ash Mimic Control! Desk Ash Mimic Control Desk Ash Plant - B.I.D. Ash Plant - B..D. BOOK 4 OBN/09/19AF/820-/EQ/700 to OBN/09/19AF/820-/EQ/706 OBN/09/19AF/820-/RC/050 to OBN/09/19AF/820-/RC/069 This binder contains the following listed drawings Ash Plant - B.I.D. OBN/09/19AF/820-/RC/070 to 094 Revision A B c D Date of Issue 6/95. 4/96 97 4/98 (V0p5674/97]4 ra Maintenance Manual ‘OBN/00/19AF/820-/MF/005 ‘System 820 v GEC ALSTHOM Drawings —— ‘Ash Handling Plant ee Page 16 - 3 OMBILIN Steam Power Plant Unit 1 and 2 (2 x 100MW) TITLE BOOK 5 DRAWING NO. This binder contains the following listed drawings Comm Equipment Distribution Cet Diag ‘Comm Equipment Distribution Cet Diag Fly Ash Silo System and Ash Handling Blower System Cet Diag Input Cards Ash Handling Blower System Cet Diag Input Cards Fly Ash Silo Unloading System Cet Diag Input Cards Fly Ash Silo System Cet Diag Analogue Card Fly Ash Silo Unloading System Cet Dia Input Card Fly Ash Silo System and Ash Handling Blower System Cet Diag Output Card Ash Handling Mimic Cet Diag Output Card Power Supplies Fly Ash Silo System and Ash Handling Blower System Cet Diag Relay Outputs Common Equipment PLC Distribution Remote Supplies PLC Block Interconnection Diagram Arrangement of Mill Reject Hopper Silo Aeration Blowers Local Control Panel Silo Aeration Heater Local Control Panel OBN/09/19AF/820-/SD/001 OBN/09/19AF/820-/SD/002 OBN/09/19AF/820-/SD/003 OBN/09/19AF/820-/SD/004 OBN/09/19AF/820-/SD/005 OBN/09/19AF/820-/SD/006 OBN/09/19AF/820-/SD/007 OBN/09/19AF/820-/SD/008 OBN/09/19AF/820-/SD/010 to 012 OBN/09/19AF/820-/SD/013 OBN/09/19AF/820-/SD/015 OBN/09/19AF/820-/SD/016 OBN/09/19AF/820-/SP/102 & 103 OBN/09/19AF/B10-/CA/003 OBN/09/19AF/FES-/RC/016 OBN/09/19AF/FES-/RC/017 Revision Date of Issue 6/95 4/96 A B c ws 4/98 [ep5674/971 e ‘Maintenance Manual }OBN/00/19AF/820-/MF/005 System 820 v . GEC ALSTHOM Drawings ——— ‘Ash Handling Plant Cee ete Page 16-4 OMBILIN Steam Power Plant Unit 1 and 2 (2 x 100MW) TITLE BOOK 6 DRAWING NO. This binder contains the following listed drawings Main PLC Distribution Cet Diag Fly Ash Silo System and Ash Handling Blower System Cet Dia Input Cards Ash Handling Blower System and Economiser System Cet Diag Input Cards Economiser System and Fly Ash Handling System Cet Diag Input Cards Ash Handling Blower System Cet Diag Fly Ash Silo System Cet Diag Output Card Economiser System and Fly Ash Handling System Cet Diag Output Cords ‘Ash Handling Blower System and Water Recirculation System Cet Diag Input Cards ‘Ash Handling Blower System and Water Recirculation System Cct Diag Output Cards Power Supplies Ash Handling Mimic Cet Diag Output Cards Power Supplies Ash Handling Mimic Cet Diag Output Cards Power Supplies Fly Ash Distribution Circuit Diagram OBN/12/19AF/820-/SD/001 to 003 OBN/12/19AF/820-/SD/004 OBN/12/19AF/820-/SD/005 OBN/12/19AF/820-/SD/006 OBN/12/19AF/820-/SD/007 OBN/12/19AF/820-/SD/008 OBN/12/19AF/820-/SD/009 OBN/12/19AF/820-/SD/010 OBN/12/19AF/820-/SD/011 OBN/12/19AF/820-/SD/013 OBN/12/19AF/820-/SD/018 to 022 OBN/12/19AF/820-/SD/026 OBN/12/19AF/820-/SD/029 to 32 OBN/12/19AF/820-/SD/037 OBN/12/19AF/820-/SD/039 Revision Date of Issue. 6/95 4/96 97. 4/98 [ap5674/97}A eo Maintenance Manual System 820 Ash Handling Plant v GEC ALSTHOM ENGINEERING SYSTEMS. ‘OBN/00/1 9AF/820-/MF/005 Drawings Page 16-5 OMBILIN Steam Power Plant Unit 1 and 2 (2 x 100MW) TITLE Fly Ash Handling System Cet Diag Input Cards Fly Ash Handling System Cet Diag Output Cards Power Supplies Bottom Ash Distribution Cct Diag Bottom Ash Mill Rejects Cct Diag Input Cards BOOK 7 DRAWING NO. OBN/12/19AF/820-/SD/040 to 042 OBN/12/19AF/820-/SD/043 OBN/12/19AF/820-/SD/046 OBN/12/19AF/820-/SD/047 OBN/12/19AF/820-/SD/048 & 049 This binder contains the following listed drawings Economiser System Cct Diag Input Cards Bottom Ash Mill Rejects and Economiser System Cet Diag Output Cards Water Recirculation System Cct Diag Input Cards Water Recirculation System Cct Diag Output Card Power Supplies Bottom Ash Handling System Cet Dia Relay Outputs Water Recirculation System Cct Diag Input Cards Water Recirculation System Cct Diag Analogue Card Water Recirculation System Cct Diag Output Card OBN/12/19AF/820-/SD/050 OBN/12/19AF/820-/SD/051 OBN/12/19AF/820-/SD/052 to 054 OBN/12/19AF/820-/SD/055 OBN/12/19AF/820-/SD/056 OBN/12/19AF/820-/SD/057 OBN/12/19AF/820-/SD/058 to 063 OBN/12/19AF/820-/SD/064 OBN/12/19AF/820-/SD/065 Revision Date of Issue 197 6/95 4/96 4/98 [V0p5674/97]4 Mairtenance ‘Manual v ‘OBN/00/19AF/820-/MF/005 GEC ALSTHOM Orawings oe Ash Handling Plant eee Page 16-6 OMBILIN Steam Power Plant Unit 1 and 2 (2 x 100MW) TITLE DRAWING NO. Power Supplies OBN/12/19AF/820-/SD/066 Bottom Ash Handling System Cct Dia Relay Inputs OBN/12/19AF/820-/SD/067 Main PLC Distribution Remote Supplies ae 2/1 9AF/820-/SD/070 & 71 Main PLC Distribution Heating Supplies OBN/12/19AF/820-/SD/075 ~~ Bottom Ash PLC Distribution Heating OBN/12/19AF/820-/SD/077 & Supplies BA Make-Up Water Marshalling Box OBN/12/19AF/FDT-/RC/010 BA Sump Marshalling Box OBN/12/19AF/FDT-/RC/011 BA Heater Exchanger Marshalling Box OBN/12/19AF/FDT-/RC/012 BA Recirculation Pumps Local Control Panel © OBN/12/19AF/FDT-/RC/013 BA Slurry Pumps Local Control Panel OBN/12/19AF/FDT-/RC/014 BA Pyrites Sluice Pumps Local Control Panel == OBN/12/19AF/FDT-/RC/014 BA Conveyor Local Control Panel OBN/12/19AF/FDT-/RC/016 C Economiser Transport Blowers Local Control Panel OBN/12/19AF/FDT-/RC/017 Vacuum Blowers Local Control Panel OBN/12/19AF/FDT-/RC/018 BA Conveyor Pullwire Circuit Diagram Panel No. 01(02) FDT 029TB) OBN/12/19AF/FDT-/SD/005 BOOK 8 This binder contains the following listed drawings Bottom Ash Transport Conveyor OBN/12/19AF/FDT-/SL/001 & 002 SSC Make-up Water Valve OBN/12/19AF/FDT-/SL/003 C Revision A 8 c D Date of Issue. 6/95, 4/96 a7 4/98. 1Vap5674/97)4 e Maintenance Manual System 820 Ash Handling Plant v GEC ALSTHOM [ENGINEERING SYSTEMS, (OBN/00/19AF/820-/MF/005 Drawings Poge 16-7 OMBILIN Steam Power Plant Unit 1 and 2 (2x 100MW) TITLE Bottom Ash Re-Circulation Pumps System Bottom Ash Re-Circulation Pump A Bottom Ash Re-Circulation Pump A Mimic Indication Lamps Bottom Ash Re-Circulation Pump B Bottom Ash Re-Circulation Pump B Mimic Indication Lamps Bottom Ash Slurry Pumps System Bottom Ash Slurry Pump A Bottom Ash Slurry Pump A Mimic Indication Lamps Bottom Ash Slurry Pump B BOOK 9 DRAWING NO. OBN/12/19AF/FDT-/SL/004 OBN/12/19AF/FDT-/SL/005 & 006 OBN/12/19AF/FDT-/SL/007 & 008 OBN/12/19AF/FDT-/SL/009 OBN/12/19AF/FDT-/SL/010 & on OBN/12/19AF/FDT-/SL/012 OBN/12/19AF/FDT-/SL/013 to 016 OBN/12/19AF/FDT-/SL/017 to 019 OBN/12/19AF/FDT-/SL/020 OBN/12/19AF/FDT-/SL/021 to 023 This binder contains the following listed drawings Bottom Ash Slurry Pump B Mimic Indication Lamps Surge Make-up Valve Submerged Scraper Conveyor Bottom Ash Hopper Seal Trough OBN/12/19AF/FDT-/SL/024 OBN/12/19AF/FDT-/SL/025 OBN/12/19AF/FDT-/SL/026 to 028 OBN/12/19AF/FDT-/SL/029 Revision Date of Issue 6/95 4196 197 4/98 [v0p5674/97)4 Mointenance Manual ont . Neinonor 7 IN/00/1 9AF/820-/MF/005 GEC ALSTHOM Drawings & Ash Handling Plant hecenaneenaiaiate Page 16 - 8 OMBILIN Steam Power Plant Unit 1 and 2 (2 x 1OOMW) TITLE DRAWING NO. Bottom Ash Pyrites Sluice Pumps OBN/12/19AF/FDT-/SL/030 to 032 Bottom Ash Pyrites Sluice Pump A OBN/12/19AF/FDT-/SL/033 & 034 Bottom Ash Pyrites Sluice Pump A Mimic Indication Lamps OBN/12/19AF/FDT-/SL/035 o Bottom Ash Pyrites Sluice Pump B OBN/12/19AF/FDT-/SL/036 Bottom Ash Pyrites Sluice Pump B Mimic Indication Lamps OBN/12/19AF/FDT-/SL/038 Heat Exchanger Valve Mimic Lamps. OBN/12/19AF/FDT-/SL/039 & 040 Bottom Ash Hopper Gates OBN/12/19AF/FDT-/SL/041 & 042 High-Head Fire Protection Valve OBN/12/19AF/FDT-/SL/043 Setteing Sump Make-Up Water Valve OBN/12/19AF/FDT-/SL/044 Water Recirculation Valve OBN/12/19AF/FDT-/SL/045 c Instrument & Control Flow Diagram BA Transfer Conveyor OBN/12/19AF/FDT-/SP/002 Process Diagram Closed Cooling Water ‘System OBN/12/GEFR/SRI-/SM/342 a : Revision A 8 G . Date of Issue 6/95 4196 97 4/98 [Vop5674/9718

You might also like