HOW SHOULD WE NEUTRALIZE THE

HAWTHORNE
EFFECT
DURING BASELINING?

www.benchmarksixsigma.com
WHAT IS THE
HAWTHORNE EFFECT?

The Hawthorne Effect states that


the process performance is
unusual if the operators know
they are being observed or
measured. The knowledge of
being watched makes them
perform the tasks differently
(behavioural change), a deviation
from how they normally work,
resulting in improved output.

www.benchmarksixsigma.com
Baselining is essential in the
measure phase and sometimes in
the define phase. We perform
Baselining to assess the current
performance to compare
improved performance with the
baseline later. It is sometimes
done with a time and motion
study, so that time taken in each
step is noted.

www.benchmarksixsigma.com
SETTING THE STAGE

To continue working in a normal


way, staff needs to be genuinely
convinced in their heart of
hearts. These staff will be
convinced only if the
Management demonstrates its
correct intentions and walks its
talk. The right actions are more
effective than a million words
spoken or written.

www.benchmarksixsigma.com
DRAFT BENCHMARK

Management should take the help


of one trusted staff or Supervisor
to have the process executed
away from the floor in private.

The Management should try to get


through their network an idea of
the baseline for similar processes
in other organizations in the same
or similar industrial sectors.

www.benchmarksixsigma.com
RATING DURING
OBSERVATION

Once the draft benchmark is


available, the observation can start
with a trained person rating the work
execution pace. The Management will
need to use the draft benchmark to
check if the results returned by their
current baselining efforts are close to
the ones they assessed earlier. This
checking will need to be done at least
twice a day and can be done once an
hour.

www.benchmarksixsigma.com
FEEDBACK

Once the check is done and it is


observed that the Hawthorne effect
or its reverse is visible, then the
baselining efforts will need to be
temporarily either halted or results
should be ignored temporarily. The
staff involved in the process will need
to be called in again and the
Management needs to re-explain to
them the objective of the baselining
study and their cooperation needs to
be requested again.

www.benchmarksixsigma.com
CONCLUSION:

Steps to be followed for good


baselining -

Set the stage


Develop a draft benchmark
Prepare a draft baseline
Observe and rate the pace
Check and provide feedback

www.benchmarksixsigma.com
Learn about the Hawthorne Effect
in our Green Belt, Black Belt, and
Master Black Belt programs