Aluminium and pvc production center Creaw Formation and Standard daily Production Out Put

1. Standard Of Production Out Put per day Data


By hand By machine
Quantity Quantity
member Standard Out Put Standard Out Put
Production Crew time /day time /day
IT.no Type formed Standard Size take(hr) take(hr) Unit Remark
1 Aluminium 3 1.2m*1.2m 1.6 5 0.571429 14 pcs
Window
2 Aluminium 3 2.1m*0.9m 4 2 1 8 pcs
Door
3 Aluminum 4 15m*3m 11.83 33.27 8 67.5 m2
Partition
4 1.2m*1.2m 8 50 Pcs
Pvc Window 15

2. Standard Fixing out put data per day

member Quantity
Production Crew Fixing / day
IT.no Type formed Standard Size Unit Remark
1 Aluminium 3 1.2m*1.2m 10 pcs
Window
2 Aluminium 3 2.1m*0.9m 5 pcs
Door
3 Aluminum 4 15m*3m 3 m2
Partition
4 3 1.2m*1.2m 10 Pcs
Pvc Windw
27.5 7.2

11 3.78

72
Aluminium
Partition 33.27
Aluminium
Door 3.78

Aluminum
Window 7.2
PVC
Windows 72
በአንድ ቀን በትራፊክ ምልክት ክፍል ወስጥ በኤክስፐርት የሚሰሩ ስራዎች
ተ.ቁ የስራው ዝርዘር በቀን የሚሰራው መጠን

1 አሉሚኒዬም ማጠብ ሰርክልና ትሪአንግል ከሆነ በቀን ከ25 አስከ 30 መስራት ይቻላል

2 መደብ ማልበስ ሰርክል ከ 15 እስከ 20 ይሰራል


3 መደብ ማልበስ ትሪአንግል 20 እስከ 25 ይሰራል
4 ጠርዝ መለጠፍ ሰርክል ከ 15 እስከ 25 ይሰራል
5 ጠርዝ መለጠፍ ትሪአንግል ከ 20 እስከ 25 ይሰራል
6 ከመደብ ጀምሮ ሙሉ ስራ ሰርክል ከሆነ በ ቀን 4 ይሰራል
7 ከመደብ ጀምሮ ሙሉ ስራ ትሪአንግል ከሆነ በቀን 5 ይሰራል
8 ምልክት መንደፍ በቀን ከ 20-25 መስራት ይቻላል
9 ምልክት መቅረጽ በቀን ከ 17-20 መስራት ይቻላል

10 ነባር ምልክቶችን አንስቶ ለሌላ ምልክት ዝግጁ ማድረግ በ ቀን ከ 7- 10 መስራት ይቻላል

11 ተነድፈው፣ተቀርጸው ያሉ ቃላቶችን ምልክት መለጠፍ በቀን ከ 15 እስከ 20 መስራት ይቻላል

የትራፊክ ምልክቶች በቀን በአንድ በክፍሉ ኤክስፐርት የምሰሩ ሥራዎች


ተ.ቁ የሥራው ዓይነት በቀን በ አንደ ሰው የሚመረተው
1 ሰርክል መደብ ጠርዝ ማልበስ 8
2 ትሪአንግል መደብ ጠርዝ ማልበስ 15
ቡድን አንድ በድን ሁለት
ተ.ቁ ስም የስራ መደብ
1 እለፈው በላይ ሁን ኤክስፐርት 2
2 ጌታቸው ካሳ ኤክስፐርት 1
3 ያሬድ መንገሻ ረዳት
ተ.ቁ ስም የስራ መደብ
1 ንግስት ያለው ኤክስፐርት 2
2 ኢሳያስ ታመነ ኤክስፐርት 1
3 ሎሚቱ ደበሉ ረዳት
ምርመራ

ምርመራ
80%
80%
Issue No: 1

No Description of Product
1 Metal curved panel
2 Metal window with grill
3 Metal door with grill
4 Metal door with grill
5 Steel Bridge with bracing & saddle
6 160*200*600cm (Whl)
Metal truss with bracing
7 Off take (Canal gete)
8 Sitting Basin Gate D/Size
9 Sitting Basin Gate D/Size
10 Metal bed
11 Curve stone mould
12 Cross regulator D/S
14 Window grill D/S
15 Fence grill
16 pannel
17 metal ladder
18 double bank bed
19 cctv camera pole
20 manufacture anchor nut Φ 30
cutting
turning
drilling
rubber inserting

21 washer plate small


Cutting
welding
drilling
22 barrel D50mm
Cutting
Turning
23 wadge D30mm
Cutting
Tapering
Milling
24 washer plate medium
Cutting
welding
drilling
Total product
Company Name:
የኢትዮጵያ ኮንስትራክሽን ሥራዎች ኮርፖሬሽን
ETHIOPIAN CONSTRUCTION WORKS CORPORATION

Document Title: የ2014 ዓ.ም የብረታ ብረት ወርክ ሾፕ የምርት ስታ


Date

Size Standard Hour Unit


ⵁ 100 *200cm 2 day
180*104cm 1 day
220*120cm 1.5 day
210*90cm 1.5 day
160*200*600cm 5 day
6m long 2 day
230*72cm 5 day
100-225 cmWidth 20-25 day
145-235 cm Height 20-25 day
100 *190cm 2 day
45*200cm 4 hour
1870*2074mm 2 weeks
150*140cm
300cm 2 day
100*200cm 1 day
850*75cm
90*170*200cm 1 day
6meter
8cm 27 minutes
4 min/piece
15 min/piece
5 min/piece
3 min/piece

50x50x5mm 5 min/piece
1 min/piece
2 min/piece
2 min/piece
8cm 30 minutes
10 min/piece
20 min/piece
8cm 45 minutes
1 min/piece
14 min/piece
30 min/piece
80x80x8 mm 10 minutes
2 min/piece
3 min/piece
5 min/piece
Document No.:
ች ኮርፖሬሽን OF/ECWC/BTCS/
WORKS CORPORATION

ረታ ብረት ወርክ ሾፕ የምርት ስታንዳርድ Page No.:

No. Of
Technician
4
2
2
2
8
4
2
2
2
2
2
6

2
4

2
1
1
1
1

2
1
1
1
1
1
1
1
1
1
2
2
1
1
65
TOTAL -
Page 1 of 1
production capacity per day with production capacity per day
No Description of Product UNIT
out accelerator with in accelerator

1 Curbstone (50*40*15) Pcs


2 Curbstone (80*25*15) Pcs
3 F2 Pcs 2 2
4 F3 Pcs 2 2
5 Column 2W Pcs 6 24
6 Slab34N Pcs 4.5 9
7 Canti Slab S34/CL Pcs 1.5 3
8 Canti Slab S34/CR Pcs 1.5 3
9 Canti Slab S34/CM Pcs 2 4
10 Canti Slab S34/CB Pcs
11 Edge Girder 34/G1 Pcs 10 20
12 Edge Girder 34/G2 Pcs
13 Edge Girder 34/G4 Pcs 1 2
14 Landing Pcs 0.5 1
15 Stair case Pcs 2 4
16 Shear wall normal Pcs 3.5 7
production capacity per production capacity per day
day with in Boilers with in night shift +bioler
+accelerator +accelerator

18 27
No Description of Product UNIT production capacity per day

1 Hcb Class C 20*20*40 Pcs 3026


2 Hcb Class C 15*20*40 Pcs 3783
3 Hcb Class C 10*20*40 Pcs 4539
WOOD WORK SHOP PRODUCTION PRODUCT STANDARD IN AVERAGE

Total Unit
Item Description UNIT Quantity/we Quantity/Da No of Crue No of Employers Working hours Remark
ek y

Tech-3 = 1
Timber cladding Carpenry-2 =1
carpntry1 =1
Laborer 3
1 PCS 55 10 1 8 8 Painter 2 forman =14903
2 Wooden flesh door with one side openi PCS 11 2 1 8 24 Clerk =4550
3 Wooden flesh door with two side openi PCS 5.5 1 1 8 24 Tech 3=10903
4 MDF Cupboard PCS 11 2 1 8 16 Tech 2=8885
5 Wooden purlin PCS 605 110 1 8 8 Tech 1=5495
6 Wooden button PCS 605 110 1 8 8 Painter =4550

Tech-3 1
Tech 2 1
Wooden Parky
Tech-1 1
Laborer 2
7 PCS 385 70 1 8 8 Painter 1 Labour =160/day
8 Wooden mostra PCS 82.5 15 1 8 8 Labour =100/day
9 Wooden pallet PCS 55 10 1 8 8 Labour =70/day
10 Wooden corner list PCS 412.5 75 1 8 8 ASS.Carp. =3771
11 laminated Wooden shelf PCS 11 2 1 8 24
12 Form work PCS 137.5 25 1 8 8
13 File cabinet PCS 16.5 3 1 8 16 Tech-3 1
Tech 2 1
14 Notice board PCS 16.5 3 1 8 12 Tech-1 1
Laborer 2
Book shelf
15 PCS 22 4 1 8 12 Painter 1
16 MDF partion PCS 27.5 5 1 8 8
17 Coffee table PCS 16.5 3 2.5 8 12
18 Wooden stair PCS 16.5 3 1 8 8
19 D/t works like provision box PCS 22 4 1 8 12
20 Chip wood for corner list PCS 550 100 1 8 12
21 Joint desk with table PCS 11 2 1 8 8
22 MDF shelf PCS 11 2 1 8 12
23 Food table PCS 5.5 1 1 8 8
24 Sofa table PCS 11 2 1 8 8
25 laminated wooden Cupboard PCS 11 2 1 8 16
26 Bed PCS 5.5 1 1 8 12
27 TV stand mdf PCS 16.5 3 1 8 16
28 Cheast drawer PCS 11 2 1 8 16
29 Comedina PCS 16.5 3 1 8 12
30 kitchen cabinet PCS 5.5 1 1 8 16
31 Wooden table PCS 22 4 1 8 12
32 Wooden chair PCS 27.5 5 1 8 8

Product Monitoring and Control Officer Product Monitoring and Control Officer
Sign_________________________ Sign_________________________
Date ________________________ Date ________________________
GYPSUM WORK SHOP PRODUCTION PRODUCT STANDARD IN AVERAGE

Total Unit
Quantity/ Quantity/
Item Description Unit week Day No of Crue No of Employers Working hours Remark
1 Gypsum Ceiling pcs 220 40 1 11 8
2 Gypsum Block pcs 275 50 1 2 8
Total per week 495 90
PAVING WORK SHOP PRODUCTION PRODUCT STAND ARD IN AVERAGE

Total Unit
Quantity/ Quantity/
Item Description Unit week Day No of Crue No of Employers Working hours Remark
1 Paving 25*25*5 pcs 478 87 1 8 8
2 Paving 30*30*6 pcs 478 87 1 8 8
3 Paving 40*40*5 pcs 478 87 1 8 8
Total per week 1434 261