member Quantity
Production Crew Fixing / day
IT.no Type formed Standard Size Unit Remark
1 Aluminium 3 1.2m*1.2m 10 pcs
Window
2 Aluminium 3 2.1m*0.9m 5 pcs
Door
3 Aluminum 4 15m*3m 3 m2
Partition
4 3 1.2m*1.2m 10 Pcs
Pvc Windw
27.5 7.2
11 3.78
72
Aluminium
Partition 33.27
Aluminium
Door 3.78
Aluminum
Window 7.2
PVC
Windows 72
በአንድ ቀን በትራፊክ ምልክት ክፍል ወስጥ በኤክስፐርት የሚሰሩ ስራዎች
ተ.ቁ የስራው ዝርዘር በቀን የሚሰራው መጠን
1 አሉሚኒዬም ማጠብ ሰርክልና ትሪአንግል ከሆነ በቀን ከ25 አስከ 30 መስራት ይቻላል
ምርመራ
80%
80%
Issue No: 1
No Description of Product
1 Metal curved panel
2 Metal window with grill
3 Metal door with grill
4 Metal door with grill
5 Steel Bridge with bracing & saddle
6 160*200*600cm (Whl)
Metal truss with bracing
7 Off take (Canal gete)
8 Sitting Basin Gate D/Size
9 Sitting Basin Gate D/Size
10 Metal bed
11 Curve stone mould
12 Cross regulator D/S
14 Window grill D/S
15 Fence grill
16 pannel
17 metal ladder
18 double bank bed
19 cctv camera pole
20 manufacture anchor nut Φ 30
cutting
turning
drilling
rubber inserting
50x50x5mm 5 min/piece
1 min/piece
2 min/piece
2 min/piece
8cm 30 minutes
10 min/piece
20 min/piece
8cm 45 minutes
1 min/piece
14 min/piece
30 min/piece
80x80x8 mm 10 minutes
2 min/piece
3 min/piece
5 min/piece
Document No.:
ች ኮርፖሬሽን OF/ECWC/BTCS/
WORKS CORPORATION
No. Of
Technician
4
2
2
2
8
4
2
2
2
2
2
6
2
4
2
1
1
1
1
2
1
1
1
1
1
1
1
1
1
2
2
1
1
65
TOTAL -
Page 1 of 1
production capacity per day with production capacity per day
No Description of Product UNIT
out accelerator with in accelerator
18 27
No Description of Product UNIT production capacity per day
Total Unit
Item Description UNIT Quantity/we Quantity/Da No of Crue No of Employers Working hours Remark
ek y
Tech-3 = 1
Timber cladding Carpenry-2 =1
carpntry1 =1
Laborer 3
1 PCS 55 10 1 8 8 Painter 2 forman =14903
2 Wooden flesh door with one side openi PCS 11 2 1 8 24 Clerk =4550
3 Wooden flesh door with two side openi PCS 5.5 1 1 8 24 Tech 3=10903
4 MDF Cupboard PCS 11 2 1 8 16 Tech 2=8885
5 Wooden purlin PCS 605 110 1 8 8 Tech 1=5495
6 Wooden button PCS 605 110 1 8 8 Painter =4550
Tech-3 1
Tech 2 1
Wooden Parky
Tech-1 1
Laborer 2
7 PCS 385 70 1 8 8 Painter 1 Labour =160/day
8 Wooden mostra PCS 82.5 15 1 8 8 Labour =100/day
9 Wooden pallet PCS 55 10 1 8 8 Labour =70/day
10 Wooden corner list PCS 412.5 75 1 8 8 ASS.Carp. =3771
11 laminated Wooden shelf PCS 11 2 1 8 24
12 Form work PCS 137.5 25 1 8 8
13 File cabinet PCS 16.5 3 1 8 16 Tech-3 1
Tech 2 1
14 Notice board PCS 16.5 3 1 8 12 Tech-1 1
Laborer 2
Book shelf
15 PCS 22 4 1 8 12 Painter 1
16 MDF partion PCS 27.5 5 1 8 8
17 Coffee table PCS 16.5 3 2.5 8 12
18 Wooden stair PCS 16.5 3 1 8 8
19 D/t works like provision box PCS 22 4 1 8 12
20 Chip wood for corner list PCS 550 100 1 8 12
21 Joint desk with table PCS 11 2 1 8 8
22 MDF shelf PCS 11 2 1 8 12
23 Food table PCS 5.5 1 1 8 8
24 Sofa table PCS 11 2 1 8 8
25 laminated wooden Cupboard PCS 11 2 1 8 16
26 Bed PCS 5.5 1 1 8 12
27 TV stand mdf PCS 16.5 3 1 8 16
28 Cheast drawer PCS 11 2 1 8 16
29 Comedina PCS 16.5 3 1 8 12
30 kitchen cabinet PCS 5.5 1 1 8 16
31 Wooden table PCS 22 4 1 8 12
32 Wooden chair PCS 27.5 5 1 8 8
Product Monitoring and Control Officer Product Monitoring and Control Officer
Sign_________________________ Sign_________________________
Date ________________________ Date ________________________
GYPSUM WORK SHOP PRODUCTION PRODUCT STANDARD IN AVERAGE
Total Unit
Quantity/ Quantity/
Item Description Unit week Day No of Crue No of Employers Working hours Remark
1 Gypsum Ceiling pcs 220 40 1 11 8
2 Gypsum Block pcs 275 50 1 2 8
Total per week 495 90
PAVING WORK SHOP PRODUCTION PRODUCT STAND ARD IN AVERAGE
Total Unit
Quantity/ Quantity/
Item Description Unit week Day No of Crue No of Employers Working hours Remark
1 Paving 25*25*5 pcs 478 87 1 8 8
2 Paving 30*30*6 pcs 478 87 1 8 8
3 Paving 40*40*5 pcs 478 87 1 8 8
Total per week 1434 261