You are on page 1of 6
C } aaaalammialler = Hyder sa Fa 974 ve yer 30 August 2017 Our Ref: DNO01-P02-HYD-HBK-LET-A11567 Hamad Bin Khalid Contracting Company WiLL P.O. Box 1362 Doha, Qatar F.AO.: Mr. Mohamed Ahmed Mohamed Mahmoud Elger Project Director Dear Sir, PROJECT: General Engineering Consultancy (GEC) Services Area 3 Doha North DNO01-P02: Road and Infrastructure in Bani Hajer North, Phase 1 & 2— Package 02 1A 12113 C 017 ST SUBJECT: MME-PPD Approval - Materials for the Landscaping Works With reference to the above mentioned subject , please find attached the copy of MME-PPD letter ref. 2017/218476 dated 28/8/2017, regarding their approval for the proposed alternative suppliers for Polyethylene Driplines, Gate Valve & Valve Boxes those manufactured by Rainbird, USA and Flowflex Components Ltd, UK. This is for your information and further necessary action. Yours faithfully, ‘Hyder y te — ee Seal se itll gS saa jder Consulting Middle E: AP ashraf E\Sayed | poor ny Doha ea Senior Resident Enginddberbons sccscn es teas — GEC Contract 2 Area 3, Doha North Hyder Consulting Middle East Limited Heme Toba PA Hamad Al Bader - PWA ‘Abdel Rahim Alzubeid ~ PBI | Encl: Copy of MME-PPD letter en = See "YA on001 702 CONSTRUCTION OF PHASE 2 PACKAGE 02\4Cates\AO5Contractor1\0D2 Outing OrsNONODLPE2-O.HBK-LETA2I987 MME PPD DAPPROUAL- MATERIAL Fo THE LANDSCAPING WORE docx Page 1 of 1 28/28/2017 11:12 4d266434 Ministry of Municipality & Environment 7 25656 Fax 6544 PO, Box 72D =O Public Parks Dept. GARDENS DEPT PAGE el/aq Atty Aptis Byl59 Had kag WV age HETMUTE SEMIN gh AaLat) Gatdot! 3313 Hyder Consulting Middle East Ltd. DM enw 18R4, Gav Nn 4474 5001 Doha, Qatar. Attention Mr. Ashraf El Sayed, Senior Resident Engineer. Dear Sir, Project : DNOO1-P02: General Engineering Consultancy Services For Area_3_: Doha North: Roads and Infrastructure in Bani Hajer North ‘28/08/2017 :fu,8y se NOMEN 2017/248476 B cc: 1 P; 2 1A 12/13 C017 ST z [Rees TBS ‘Subject: Material Approval for Landscaping Works Copied te. aR] Ay Reference is made to your letter No DNOO1-PO2-HYD-MME-LET-A115; PPD-MME Technical Committee has reviewed submitted documer below Status of Review and comments in the material submissions: S.No. | Material Description raeae Review Code zy_ | Pelvethviene Driving _| M/s. Raln bird International, | Approved As Gate Valve (Brass) __| M/s. Flowfiex Components Ltd, 2 m4 Approved Valve Box M/s. Rain bird International, 3) i | Approved Please also be advised that Material Approval Request shall be attached with each Material submissions, stating recommendations from the Consultant and a separate Section shalll be kept blank for PPD Recommendations. Non-compliance of which will force PPD- MME to retuin any Material submissions without review. ‘The Hard copy Material Submission should be collected at 3rd floor, PPD-MME, ‘Administrative Annex, B Ring Road, Muntaza Area (collection of Documents between 7 to 11 ‘am, please call Tel. No. 4426 3235), This is for your information and necessary action. Should you have any queries, please contact our Engineers Gihan Ibrahim (Mob. 55978937), Myassar Hayawi (Mob. 55537613), Majeed Ali (Mob. 55213239). [

You might also like