You are on page 1of 3
C Hyder 22 August 2017 Our Ref: DN001-P02-HYD-HBK-LET-A11550 Hamad Bin Khalid Contracting Company WL. P.O. Box 1362 Doha, Qatar FAO. Mr. Mohamed Ahmed Mohamed Mahmoud Elgemiei Project Director Dear Sir, PROJECT: General Engineering Consultancy (GEC) Services Area 3 Doha North DN001-P02: Road and Infrastructure in Bani Hajer North, Phase 1 & 2— Package 02 1A 12/13 C 017 ST SUBJECT: KM Approval - Material for the Potable Water Lines With reference to the above mentioned subject , please find attached the copy of Kahramaa letter ref. TW/TWM/10628/2017 dated 21 August 2017, regarding their approval for the proposed Valves manufactured by M/s Duker, Germany. This is for your information and further necessary action Yours faithfully, Hyder y Z— Sia Can) Jas Gila 9S ala tyder Consulting Middle East Ltd. shrafElSayed 0.80%: 1854, Dona atar Senior Resident Enginveerne 4245000 Fax 44245001 |EC Contract 2 Area 3, Doha North “© Hyder Consulting Midale East Limited ce Flemai77 Mohamed Totba - PWA Hamad Al Bader- PA ‘Abdel Rahim Alzubeidi - PBI Encl: Copy of KM leter TWTWM/10628/2017 dated 21 August 2017 He axles ‘aon mt conmucrovor nase 82 raAL crema 2 Otsu FED MELAS ARO [MATERIAL FOR THE POTABLE WATER LINES. 30" Page ota uy 7001 Fax HRANDAK Was De piletell, ll KARRI MAR oy, epilabl—g theta oat aenestit aie She SAS cular General Betty & Wale Corporation ph kaya € se ‘Tet=(874) 4845363 Eax (81444845383 Ref. No. TWw/rww/i0628/2017. Date: 21/08/2017. CONSTRUCTION DIRECTOR MIS. HYDER P.O BOX: 1854 FAX NO: 444245001 DOHA-QATAR PROJECT: A 12/13 C_017 ST DNOO1-P02: ROAD AND INFRASTRUCTURE IN BANI HAJER NORTH PHASES 1 & 2 PACKAGE 2 SUBJECT: MATERIAL APPROVAL REQUEST With reference to the above captioned subject and to your letter ref. no. DNOO1-P02-HYD-KAW- LET-A11832 dated 15.08.2017, please find'below our comments: Germany Note‘: Following comments made on the above proposed material submitted: 1. Casting should be carried out in Duker approved Foundries. 2. Logo of Factory & Foundry should be casted in Valve body (Marking). Note: The above materials must comply with WP-P5/S1_(issue#2 19/6/2015) General Specifications at the time of supply. This is for your information and further necessary action. Regards, MOHAMMED RASHID AL-KUWARI HEAD, SECONDARY WATER PROJECTS SECTION ccocrws, SH ‘ag WORAMES/340872017 20.08.17 batter living wey Transmittal Note ‘Transmittal No. ‘DNO001-P02-HYD-HBK-TML-04598 Subject KM Approval - Material for the Potable Water Lines Sent Date 22-Aug-2017 ‘Submission No. (as of 22-Aug-2017) CNS101109 Project Title Roads and Infrastructure in Bani Hajer North - Phases 1 & 2 - Package 02 Project No DNoo1-Po2 From Ashraf El Sayed Senior Resident Engineer Hyder Consulting Middle East Limited P.O. Box 1854, Doha, Qatar To Mohamed Ahmed Mohamed Mahmoud Eigemiei Project Director Hamad Bin Khalid Contracting Company W.L.L Po Box 1362 Doha, Qatar cc Comments Distribution Company Issued For Date Task Hamad Bin Khalid Contracting information 22-Aug-2017 This's for your information and further necessary action, Company Attachments Document Number Rev. Title Medium Attachment Remark Type ‘DNOO1-P02-HYD-HBK-LET- LET: KM Approval- Material forthe Hard Copy Ai1850 Potable Water Lines Tw-Twiw-10628-2017 LET: Material Approval Request Hard Copy ‘Sent by Aldren DelaCruz (Aldren.DelaCruz@arcadis.com) on 22-Aug-2017 at 13:44

You might also like