Designed Temporary maintain

LOOP maintaining temperature during HGO Loop condition during HGO circulation
temperature circulation
CKT-01 CLD 130 50
CKT-02 CLD 130 50
CKT-03 CLD 130 50
CKT-04 CLD 130 50
CKT-05 CLD 130 50
CKT-13 CLD 130 50
CKT-14 CLD 130 50
CKT-17 CLD 130 50
CKT-30 CLD 130 50

CKT-06 PIT 220 50 PIT product to BL & to V-04


P-06A/B common discharge to LV-012A (up to its downstream isolation) & LV-012B (up to its upstream isolation) & PV-024 (up to its
CKT-07 PIT 220 50
downstream isolation)
CKT-08 PIT 220 50 P-06B suction (downstream the strainer) & discharge & PSV & spillback & common discharge up to the 8''x6'' reducer
CKT-09 PIT 220 50 T-04 outlet & 06B suction (up to downstream the strainer) & 06B drains & 06A suction (up to the 1st isolation valve)
CKT-10 PIT 220 50 06A suction & PSV & drains & long circulation line
CKT-11 PIT 220 50 Short circulation line & spillback header to T-04 & 06A discharge & spillback & PV-024 outlet
CKT-12 PIT 220 50 T-04 inlet (PV-018 inlet & outlet & vent)
CKT-18 PIT 220 50 PSV-008 on T-04 inlet & its HPS line
CKT-19 PIT 220 50 HPS & LPS lines to T-04
CKT-23 PIT 220 50 06A/B warm-up lines & header
CKT-27 PIT 220 50 PI-211 on E-08 outlet
CKT-28 PIT 220 50 PT-017 on T-04 inlet
CKT-29 PIT 220 50 Portion of PIT product line downstream LV-012A
CKT-32 PIT 131 50 T-04 inst. Nozzles

CKT-24 RES 130 50 V-01 outlet & common suction & 01A suction & PSV
CKT-25 RES 130 50 01B suction & PSV & 01A/B drains

CKT-20 PRO 130 50


CKT-21 PRO 75 50
CKT-22 PRO 130 50 Required for P-10 circulation to PSVs with HGO
CKT-26 PRO 130 50
CKT-31 PRO 130 50

CKT-15 ATS 20 - Not required


CKT-16 ATS 20 -

06A/B on-skid EHT 220