CKE.ITP.01.29.(00).
2012
Date Issued : 2nd February 2012
RECORD OF CONTINUITY AND INSULATION
Revision :: -
RESISTANCE TEST
Revision Date :: -
Page :: 1/2
:
This Record Of Continuity and Insulation Resistance Test form shall be used for reporting on the condition of All Final Circuit Wiring
(except Ring Final Circuits) for New Installation before final connection of the swtiches, sockets, electrical accessories, fittings and DB.
A. PARTICULARS OF THE INSTALLATION [Please tick (√ ) the relevant boxes and enter details as appropriate]
Project Name UTHM- MENAIK TARAF INFRASTRUKTUR MEKANIKAL, ELEKTRIKAL SERTA
TEKNOLOGI MAKLUMAT DAN KOMUNIKASI (ICT) DI UTHM PARIT RAJA
Drawing No./Installation
Address JLJ/A3/19/69-C-18(32)
Block No./Floor Blok C2 - BILIK SERVER 'MAIN DB'
DB Designation Submain DB server to Single phase Phase: R Y B 3 phase
DB Genset
System of Wiring Loop-in Tee
system system
B. TEST INSTRUMENT USED
Instrument Brand Model No. Serial No. Calibration Date
Insulation & Continuity Tester KYORITSU 3005A E8300796 30.10.2023
Insulation Tester
C. TEST RESULTS (Please X where not applicable. Please refer to Page 2 for notes and test procedures)
Circuit Number And Phase R Y B N G
Type of Wiring [see note 2] A A A A A
Circuit reference [see note 3] cable cable cable cable cable
Number of Points 1 1 1 1 1
Phase (mm2) 35.0 35.0 35.0 35.0 -
Cable Size
CPC (mm2) - - - - 16.0
C1. CONTINUITY TEST (Chooese either Test Method 1 or 2)
Neutral & CPC,
(ohms) 0.21 0.18 0.12 0.12 0.16
[see Test Method 1]
Neutral & CPC,
(ohms) - - - - -
[see Test Method 1]
Confirmation of CPC in the circuit is continuous
Y Y Y Y Y
(Mark Y for YES and N for No)
C2. INSULATION RESISTANCE TEST
Phase to Neutral ( L - N ) (Mohms) ≥ 2M ≥ 2M ≥ 2M ≥ 2M ≥ 2M
Phase to CPC (L-E) (Mohms) ≥ 2M ≥ 2M ≥ 2M ≥ 2M ≥ 2M
Neutral to CPC (N-E) (Mohms) ≥ 2M ≥ 2M ≥ 2M ≥ 2M ≥ 2M
Phase & Neutral to G.I Conduit/Trunking (Mohms) ≥ 2M ≥ 2M ≥ 2M ≥ 2M ≥ 2M
D1. INSULATION TEST VOLTAGE (Volts) - E. REMARKS (If Any)
D2. INSULATION TEST RESISTANCE (Mohms) -
F. PENGAKUAN ORANG KOMPETEN G. PENGESAHAN JABATAN
(BAGI PIHAK KONTRAKTOR ELEKTRIK)
Diuji Oleh : AIDIEL RAMDZAN BIN ZULKIFLI Disaksi Oleh :
(Nama Pendawai) (Nama)
Tandatangan : Tandatangan :
No. Kekompetenan : PJ-T-2-B-0220-2022 Jawatan :
Tarikh Ujian : Tarikh :
Nama & Cop :
Kontraktor
CKE.ITP.01.29.(00).2012
Date Issued : 2nd February 2012
RECORD OF CONTINUITY AND INSULATION ::
Revision -
RESISTANCE TEST
Revision Date :: -
Page :: 1/2
:
This Record Of Continuity and Insulation Resistance Test form shall be used for reporting on the condition of All Final Circuit Wiring
(except Ring Final Circuits) for New Installation before final connection of the swtiches, sockets, electrical accessories, fittings and DB.
A. PARTICULARS OF THE INSTALLATION [Please tick (√ ) the relevant boxes and enter details as appropriate]
Project Name UTHM- MENAIK TARAF INFRASTRUKTUR MEKANIKAL, ELEKTRIKAL SERTA
TEKNOLOGI MAKLUMAT DAN KOMUNIKASI (ICT) DI UTHM PARIT RAJA
Drawing No./Installation
Address JLJ/A3/19/69-C-18(32)
Block No./Floor Blok C2 - BILIK SERVER 'MAIN DB'
DB Designation Single phase Phase: R Y B 3 phase
System of Wiring Loop-in Tee
system system
B. TEST INSTRUMENT USED
Instrument Brand Model No. Serial No. Calibration Date
Insulation & Continuity Tester KYORITSU 3005A E8300796 30.10.2023
Insulation Tester
C. TEST RESULTS (Please X where not applicable. Please refer to Page 2 for notes and test procedures)
Circuit Number And Phase
Type of Wiring [see note 2]
Circuit reference [see note 3]
Number of Points
Phase (mm2)
Cable Size
CPC (mm2)
C1. CONTINUITY TEST (Chooese either Test Method 1 or 2)
Neutral & CPC,
(ohms)
[see Test Method 1]
Neutral & CPC,
(ohms)
[see Test Method 1]
Confirmation of CPC in the circuit is continuous
(Mark Y for YES and N for No)
C2. INSULATION RESISTANCE TEST
Phase to Neutral ( L - N ) (Mohms)
Phase to CPC (L-E) (Mohms)
Neutral to CPC (N-E) (Mohms)
Phase & Neutral to G.I Conduit/Trunking (Mohms)
D1. INSULATION TEST VOLTAGE (Volts) - E. REMARKS (If Any)
D2. INSULATION TEST RESISTANCE (Mohms) -
F. PENGAKUAN ORANG KOMPETEN G. PENGESAHAN JABATAN
(BAGI PIHAK KONTRAKTOR ELEKTRIK)
Diuji Oleh MOHD TAUFIK BIN SHAM ALI Disaksi Oleh :
(Nama Pendawai) (Nama)
Tandatangan : Tandatangan :
No. Kekompetenan : PJ-T-2-B-0503-2014 Jawatan :
Tarikh Ujian : Tarikh :
Nama & Cop :
Kontraktor