Residential Building [
Month Casted Concrete QTY
Previously
01-May-22 -
01-Jun-22 16.00
01-Jul-22 500.00
01-Aug-22 497.00
01-Sep-22 4,808.00
01-Oct-22 3,762.00
01-Nov-22 642.00
01-Dec-22 171.00
01-Jan-23 925.00
01-Feb-23 2,944.00
01-Mar-23 872.00
01-Apr-23 1,676.00
01-May-23 2,335.00
01-Jun-23 1,537.00
TOTAL 20,685.00
sidential Building [2B+G+2P+14F+Roof] at Erikyah - Lusail City
0
- Lusail City
CONCRETE POURING LOG
Residential Building [2B+
[Link] Casting Date Grade Qty
1 Sunday, June 4, 2023 C50/20 OPC 20
1 Monday, June 5, 2023 C50/20 OPC 54
2 Tuesday, June 6, 2023 C50/20 OPC 45
3 Wednesday, June 7, 2023 C50/20 OPC 97
4 Sunday, June 11, 2023 C40/20 OPC 567
5 Thursday, June 15, 2023 C50/20 OPC 131
6 Saturday, June 17, 2023 C50/20 OPC 65
7 Thursday, June 22, 2023 C40/20 OPC 558
8 Monday, June 26, 2023 C50/20 OPC 54
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
TOTAL QTY 1537
dential Building [2B+G+2P+14F+Roof] at Erikyah - Lusail City
Jun-23
7 DAYS
Location Remark
Send To Lab
Column T-04 to T-05 √
Column T-04 to T-05 Core wall-1 and stair
Column T-04 to T-05 Core wall-2 and stair
Column T-04 to T-05 Core wall-3 and stair
T-05 Slab and Beam
Column T-05 to T-06 Core wall-1,2 and stair
Column T-05 to T-06 Core wall-3 and stair
T-06 Slab and Beam
Column T-06 to T-07
yah - Lusail City
CONCRETE POURING LOG
7 DAYS 28 DAYS
Result Recived Submited Send To Lab Result Recived Submited
Residential Building [2B+
[Link] Casting Date Grade Qty
1 Tuesday, May 2, 2023 C20/20 OPC 3
2 Wednesday, May 3, 2023 C40/20 OPC 576
3 Saturday, May 6, 2023 C50/20 OPC 63
4 Sunday, May 7, 2023 C50/20 OPC 45
5 Monday, May 8, 2023 C50/20 OPC 53
6 Tuesday, May 9, 2023 C50/20 OPC 57
7 Saturday, May 13, 2023 C40/20 OPC 576
8 Monday, May 15, 2023 C20/20 OPC 3
9 Tuesday, May 16, 2023 C50/20 OPC 63
10 Wednesday, May 17, 2023 C50/20 OPC 72
11 Thursday, May 18, 2023 C50/20 OPC 54
12 Saturday, May 20, 2023 C50/20 OPC 15
13 Monday, May 22, 2023 C20/20 OPC 3
14 Tuesday, May 23, 2023 C40/20 OPC 567
15 Wednesday, May 24, 2023 C50/20 OPC 27
16 Thursday, May 25, 2023 C50/20 OPC 70
17 Saturday, May 27, 2023 C50/20 OPC 54
18 Sunday, May 28, 2023 C50/20 OPC 45
19 Wednesday, May 31, 2023 C40/20 OPC 565
14
15
16
17
18
19
20
21
22
23
24
TOTAL QTY 2335
dential Building [2B+G+2P+14F+Roof] at Erikyah - Lusail City
May-23
7 DAYS
Location Remark
Send To Lab
Lintal Beam √
T-01 Level Slab and Beam (Including Stair case) √
Core wall -01 , stair and Column √
Core wall -02 Right side , stair and Column √
Core wall -02 Left side , stair and Column √
Core wall -03 , stair and Column
T-02 Level Slab and Beam (Including Stair case)
Lintal Beam
Column T-02 to T-03 and Core wall -01
Column T-02 to T-03 and Core wall -02
Column T-02 to T-03 and Core wall -03
Column T-02 to T-03
Lintal Beam
T-03 Level Slab and Beam (Including Stair case)
Column T-03 to T-04
Column T-03 to T-05 and Core wall -01
Column T-03 to T-04 and Core wall-02
Column T-03 to T-04 and Core wall-03
T-04 Level Slab and Beam (Including Stair case)
yah - Lusail City
CONCRETE POURING LOG
7 DAYS 28 DAYS
Result Recived Submited Send To Lab Result Recived Submited
Residential Building [2B+G+2P
[Link] Casting Date Grade Qty
1 4/5/2023 C45/20 OPC 693
2 4/9/2023 C50/20 OPC 18
3 4/10/2023 C50/20 OPC 9
4 4/11/2023 C50/20 OPC 18
5 4/11/2023 C50/20 OPC 40
6 4/12/2023 C50/20 OPC 27
7 4/13/2023 C50/20 OPC 36
8 4/15/2023 C50/20 OPC 41
9 4/20/2023
C40/20 OPC 585
10 4/21/2023
11 4/25/2023 C50/20 OPC 26
12 4/26/2023 C50/20 OPC 42
13 4/27/2023 C50/20 OPC 45
14 4/29/2023 C50/20 OPC 63
15 4/30/2023 C50/20 OPC 33
16
17
18
19
20
21
22
23
24
TOTAL QTY 1676
dential Building [2B+G+2P+14F+Roof] at Erikyah - Lusail City
Apr-23
7 DAYS
Location Remark
Send To Lab Result Recived
Podium 1 Level Upper Slab and Beam
√ √
(Including Swimming Pool Wall
Column P1-P2 √ √
Column P1-P2
Column P1-P2 √ √
Column P1-P2 and Core wall-1 √
Column P1-P2 √
Column P1-P2 and Core wall-2 (One Side) √
Core wall-03 and Core wall-2 (One Side) √
Podium -02 slab and Beam, Stair √
Column P2 to T01 √
Column P2-T-01 and Corewall-01 & Stair √
Column P2-T-01 and Corewall-02 Right Side √
Column P2-T-01 and Corewall-02 Left Side √
Column P2-T-01 and Corewall-03
h - Lusail City
CONCRETE POURING LOG
7 DAYS 28 DAYS
Submited Send To Lab Result Recived Submited
SOR FOR CONCRETE
Residential Building [2B+G+2P+
[Link] Casting Date Grade Qty
1 3/2/2023 C60/20 OPC 14
2 3/4/2023 C60/20 OPC 27
3 3/5/2023 C60/20 OPC 27
4 3/5/2023 C45/20 OPC 22
5 3/6/2023 C60/20 OPC 45
3/8/2023 C60/20 OPC 40
6 3/9/2023 C60/20 OPC 18
7 3/9/2023 C45/20 OPC 3
8 3/11/2023 C60/20 OPC 72
9 3/11/2023 C45/20 OPC 5
10 3/12/2023 C60/20 OPC 81
11 3/13/2023 C60/20 OPC 24
12 3/14/2023 C60/20 OPC 27
13 3/15/2023 C45/20 OPC 72
14 3/16/2023 C45/20 OPC 36
15 3/18/2023 C20/20 OPC 9
16 3/19/2023 C45/20 OPC 115
17 3/21/2023 C45/20 OPC 109
18 3/28/2023 C45/20 OPC 81
19 3/29/2023 C50/20 OPC 18
20 3/29/2023 C20/20 OPC 3
21 3/30/2023 C50/20 OPC 24
22
23
24
TOTAL QTY 872
ential Building [2B+G+2P+14F+Roof] at Erikyah - Lusail City
Mar-23
7 DAYS
Location Remark
Send To Lab Result Recived
GF to 1st Podium Column `ETS ROOM √ √
GF to 1st Podium Column √ √
GF to 1st Podium Column
Upstand Slabb & wall GF √ √
GF to 1st Podium Column
GF to 1st Podium Column and upstand slab
GF to 1st Podium Column
Stair Case-04
GF to 1st Podium Column
Stair Case-1 & 2
Core wall-01 and GF to 1st Podium Column
GF to 1st Podium Column
Core wall -02 & Stair -01 GF-P01
Slab & Beam (ETS Room) PT GF-P01 √
Core wall -03 & Stair-02 GF-P01 √
Screet B2
Podium Lower Slab and stair 1,2
Podium Lower Slab and stair 1,2
swimming pool Lower Slab
Column P1-P2
Block and Lintal Beam B1
Column P1-P2
h - Lusail City
CONCRETE POURING LOG
7 DAYS 28 DAYS
Submited Send To Lab Result Recived Submited
√
Residential Building [2B+G+2P+
[Link] Casting Date Grade Qty
1 2/1/2023 C40/20 OPC 9
2 2/1/2023 C45/20 OPC 18
3 2/4/2023 C40/20 OPC 36
4 2/5/2023 C45/20 OPC 18
5 2/9/2023 C45/20 OPC 9
6 2/26/2023 C45/20 OPC 1797
7 2/28/2023 C45/20 OPC 1057
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
TOTAL QTY 2944
ential Building [2B+G+2P+14F+Roof] at Erikyah - Lusail City
Feb-23
7 DAYS
Location Remark
Send To Lab Result Recived
Retaining wall √ √
Substation Trench wall (External) √ √
Retaining wall GF
Substation Trench wall GF √ √
Stair 4 (B1-GF)
GF lower slab and beam
GF Upper slab and beam
√
h - Lusail City
CONCRETE POURING LOG
7 DAYS 28 DAYS
Submited Send To Lab Result Recived Submited
√
Residential Building [2B+G+2P+
[Link] Casting Date Grade Qty
1 1/1/2023 C20/20 OPC GABB 36
2 1/2/2023 C4/20 OPC +30%PFA+CI 45
3 1/2/2023 C60/20 OPC 9
4 1/2/2023 C20/20 OPC 5
5 1/3/2023 C60/20 OPC 147
6 1/4/2023 C20/20 OPC 3
7 1/5/2023 C20/20 OPC 5
8 1/8/2023 C20/20 OPC 9
9 1/9/2023 C20/20 OPC 5
10 1/10/2023 C45/20 OPC 27
11 1/10/2023 C20/20 OPC 13
12 1/11/2023 C40/20 OPC 41
13 1/12/2023 C60/20 OPC 81
14 1/14/2023 C20/20 OPC 3
15 1/15/2023 C20/20 OPC 6
16 1/16/2023 C40/20 OPC+30%PFA+CI 95
17 1/17/2023 C20/20 OPC 9
18 1/17/2023 C40/20 OPC+30%PFA+CI 25
19 1/22/2023 C40/20 OPC+30%PFA+CI 90
20 1/23/2023 C40/20 OPC+30%PFA+CI 48
21 1/28/2023 C45/20 OPC 23
22 1/28/2023 C40/20 OPC 54
23 1/30/2023 C45/20 OPC 59
24 1/31/2023 C40/20 OPC 72
TOTAL QTY 910
ential Building [2B+G+2P+14F+Roof] at Erikyah - Lusail City
Jan-23
7 DAYS
Location Remark
Send To Lab Result Recived
Filling block √ √
Retaining wall √ √
Column
Filling block √ √
Firtank and core wall -1
Filling block
Filling block
Filling block
Filling block
Ramp B2 Mass concrete
Filling Block
Retaining wall (J-M)
Retaing wall and Core wall -03 √
Filling Block √
Filling Block
Storm water tank and RW
Filling Block
Retaining wall
Retaining wall
Retaining wall and Break Tank
Retaining wall and Break Tank
Retaining wall
Substation slab GF
Retaining wall
h - Lusail City
CONCRETE POURING LOG
7 DAYS 28 DAYS
Submited Send To Lab Result Recived Submited