DDA - Structural Inspection Log

The document is a structural inspection log that outlines the responsibilities of the contractor and consultant regarding the inspection of construction works. It specifies that both parties are liable for any errors in design and execution, and the contractor must notify the Dubai Development Authority prior to concrete pouring. Additionally, the log must be maintained on-site during construction and submitted with the completion of the structural inspection request.

Uploaded by

arbaazrasalkar01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

DDA - Structural Inspection Log

The document is a structural inspection log that outlines the responsibilities of the contractor and consultant regarding the inspection of construction works. It specifies that both parties are liable for any errors in design and execution, and the contractor must notify the Dubai Development Authority prior to concrete pouring. Additionally, the log must be maintained on-site during construction and submitted with the completion of the structural inspection request.

Uploaded by

arbaazrasalkar01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

STRUCTURAL INSPECTION LOG

Plot No. Consultant:

Base Slab Demarcation Date: Contractor:

INSPECTION TRACKING PASS (P)/ REMARKS


WORK INSPECTED NAME OF ENGINEER SIGNATURE
DATE NUMBER REJECTION (R) (REASONS FOR REJECTION, IF ANY)

Note:
1. The structural engineer & Dubai Development Authority Zoning Affairs shall bear no liability on checking drawings and calculations or on inspection of the works at site. Both contractor & consultant shall
bear the full liability of errors in design, execution and stability & safety of the construction during execution and then after completion.
2. The contractor should inform Dubai Development Authority Zoning Affairs – structural engineer prior to casting, through submitting Structural Inspection Request duly signed and stamped by both
contractor & consultant certifying inspection of works and approval for concrete pouring.
3. This record is to be kept at site during the construction of the project and finally to be attached with completion of structural inspection request (ZADC 74).

Public. ZA-DC-F-13 Issue 7, Rev 0