IR Format

The inspection report details the electrode qualification test for the Dahej Parvat Ethane Pipeline Project, conducted by Corrtech Energy Limited for Reliance Ethane Pipeline Project. It includes specifications of the electrodes, welding details, test results for visual inspection, radiography, tensile tests, impact tests, and chemical analysis. The report is signed by representatives from both the contractor and client.

Uploaded by

Chaudhari Minhal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views2 pages

IR Format

The inspection report details the electrode qualification test for the Dahej Parvat Ethane Pipeline Project, conducted by Corrtech Energy Limited for Reliance Ethane Pipeline Project. It includes specifications of the electrodes, welding details, test results for visual inspection, radiography, tensile tests, impact tests, and chemical analysis. The report is signed by representatives from both the contractor and client.

Uploaded by

Chaudhari Minhal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

INSPECTION REPORT

ELECTRODE QUALIFICATION TEST


Project: DAHEJ PARVAT ETHANE PIPELINE(DPEPL) PROJECT
Client: M/S. RELIANCE ETHANE PIPELINE PROJECT (REPL)
CSM: M/S. SANMARG PROJECTS PRIVATE LIMITED (SPPL)
Contractor: M/S. CORRTECH ENERGY LIMITED (CEL)
Doc no.- DPEP000-CEL-PPN-EQT-FR-003
Report No.:
Date:
Tested at (Site Name):
Date: Test Period:
ELECTRODE /FILLERWIRE DETAILS
AWS Classification: Batch No. Current Conditions
Brand Name: MTC No. Welding Currents
Electrode No & Size of Electrodes:
MANUFACTRURE DETAILS
Name:
TEST SPECIMEN DETAILS
Material Specification:
Thickness: Joint Type:
Code of reference (Used for testing):
WELDING DETAILS:
Filler Metal Ampere Volt Travel Speed
Layers Process Current Type
Class Dia Range Range Range

Test Results
Visual Inspection Report No
Radiography Test Report No

All weld Tensile Test Results:


Sr.No. Identification No. U.T.S. Yield Point Elongation Remarks

Conts….
INSPECTION REPORT
ELECTRODE QUALIFICATION TEST
Project: DAHEJ PARVAT ETHANE PIPELINE(DPEPL) PROJECT
Client: M/S. RELIANCE ETHANE PIPELINE PROJECT (REPL)
CSM: M/S. SANMARG PROJECTS PRIVATE LIMITED (SPPL)
Contractor: M/S. CORRTECH ENERGY LIMITED (CEL)
Doc no.- DPEP000-CEL-PPL-EQT-FR-003
Conts…

Impact Test Results


Test
Notch in:
Temperature
Type of Size of
specimens Specimens:

Specimen No. Impact Value Average

Chemical Analysis Result


Electrode Size Used:
Batch No.:

%C %S %P %Si %Mn %Cr %Ni %MO

For CEL For SPPL / REPL


Sign: Sign:
Name: Name:
Date: Date: