You are on page 1of 34

CCTV System

for Radiation Work Management

Yonggwang NPP Unit 5 & 6

Contents
. YGN Unit 5 & 6

. Brief Overview of Radiation Protection


. Description of CCTV system . Cases for use of CCTV system . Effects . IAEA OSART Good Practice . Conclusion

. YGN Unit 5 & 6


Key Features
Type : PWR

Power Level : 1,050MWe 2 Loops, 2 S/Gs, 4 RCPs 177 Fuel Assys, 16 16 tubes S/G : Vertical U-tube with Economizer Condenser Heat Sink : Sea water

. Brief Overview of Radiation protection


Statutory Exposure Dose limit
Category Effective Dose Limit Workers 100mSv per 5 years Frequent Visitors 12mSv per year General Public 1mSv per year

Site Exposure Dose limit


Category Effective Dose Limit Workers 16 mSv per year Frequent Visitors 10 mSv per year General Public 1 mSv per year

. Brief Overview of Radiation protection [contd]


Radiation Work Control
Anticipated Exposure (man-mSv) < 10 10 ~ 70 70 ~ 200 > 200 Counter plan Review and check work order Work Order Approval ALARA Acting Level Committee Review ALARA Committee review

. Brief Overview of Radiation protection [contd]


Collective Radiation Exposure

Year

. Description of CCTV system


Purpose Radiation Exposure Reduction Efficient Radiation Safety Control in RCA Continuous Check-up for important works and facilities integrity Characteristics Real-time information by LAN Movable Cameras can support important or high radiation work anywhere

. Description of CCTV system [contd]


Composition Item Monitoring System Announcement System Camera #5 1 Set 1 Set #6 1 Set 1 Set RWB -

Fixed
Movable

7 Sets
2 Sets 3.3 Km

7 Sets
2 Sets 3.3 Km

4 Sets
1.1 Km

Data Cable

. Description of CCTV system


Network

[contd]

LAN

LAN

Movable or Fixed

HP Room Console Lack Office Lobby Monitor

. Description of CCTV system


Location (Fixed Camera)
Building Elevation Location Details
ACB SAB FHB PAB 100 100 100 77 100 142 144 100 RWB 100 100 70 Locker Room Area Entrance to RCA General Access Area General Access Area Truck Bay Area Storage Area Personal Airlock Area Hot Machine Shop Entrance of RCA Truck Bay Area Access Area

[contd]

Main Function
Prevention of robbery Check-up personnel coming in and out Check up entry and exit of equipment and person Controlling entry and exit in high radiation area Check-up personnel coming in and out Controlling entry and exit in high radiation area Check-up entry and exit of equipment and person Check-up personnel coming in and out

. Description of CCTV system


Location (Movable Camera)

[contd]

Movable Cameras are communicated with main control center by using connecting jack

Building Elevation
100
RCB

Number of jacks
2

Main Function
Installation and removal of SG Nozzle dam Installation and removal of SG man-way ECT (Eddy current test) Maintenance of RCP and related works Lancing and FOSAR in secondary side of SG Reactor Maintenance fuel loading and withdrawal Check-up entry and exit of equipment and person

125

142

. Description of CCTV system


View of Fixed Camera

[contd]

. Description of CCTV system


View of Movable Camera

[contd]

. Description of CCTV system


CCTV system Diagram
MONITOR ACB 100 LOCKER AREA ROOM MATRIX SWITCHER

[contd]

HP ROOM
MONITOR

ACB 100 Entrance of RCA

MONITORING SERVER(DVR)

11SET SAB 100 GEN ACCESS AREA

SAB 77 GEN ACCESS AREA FHB 100 TRUCK BAY AREA

KEYBOARD

KEYBOARD

PAB 144
LINK FACILITY

4SET

FHB 142 STORAGE AREA PAB 144 PERSONAL AIRLOCK AREA LINK FACILITY to RWB

. Description of CCTV system


Real time Monitoring all places where cameras are located. Recording important works Announcing

[contd]

HP Room Console Rack (Main control center)

Auto Recording when any movement is detected.

. Description of CCTV system


Monitoring in HP Room Console Rack

[contd]

All locations under surveillance

The main work place

. Description of CCTV system


Comparison (use or not)
Work
SG Nozzle Dam

[contd]

Year
2003 2006 2003

Number of workers
61 52 435

Working Time (man-hr)


101 62 1,044

Exposure Dose (man-mSv)


11.02 6.30 38.3

CCTV use or not


Not Use Not

ECT 2006
SG Man-way 2003 2006

290
83 81

698
156 177

23.41
6.23 4.33

Use
Not Use

. Cases for use of CCTV system

Case 1
Removal of remaining Thermal Sleeve (T/S) 2005.05 Unit 5 third Planned Outage (37 days)
<Related event description>
During the first outage of unit 5, a metal object was discovered in the Reactor Bottom Head. (conformed by Remote Video Inspection) As a result of the specific inspection, three metal objects were discovered. These objects have been identified as missing thermal sleeves from the Safety Injection Nozzle. A remaining T/S was planned to be removed during the third Outage

. Cases for use of CCTV system


Material : Inconel 690 Size (mm) : 304(W)554(H)4.5(T) Weight (kg) : 20Kg Dose rate (removal): 6mSv/hr

. Cases for use of CCTV system [contd]


Monitoring T/S Work through CCTV System

. Cases for use of CCTV system [contd]


Result of ALARA Control
Target (mSv) Dose 160 Result (mSv) 73.91 % 53.8

Reason of exposure Reduction Content


Work control (Lead shielding and vest) Reduction of the Number of person( Effect of CCTV)
Reduction Rate(%)

10 10

Optimization of Working time (Effect of CCTV)


Cancellation of some work SUM

6
28.8 53.8

. Cases for use of CCTV system [contd]


Effect of using CCTV System
Reduction of Exposure : 16 man-mSv (10%)
About 15 persons supervised the work through CCTV during the working period (11days) = persons x staying time x Radiation level in the area

Optimization of Working Time : 9.6 man-mSv (6%)

Reduction of Radioactive Waste : 1 Drum


About 220 pairs of Rubber gloves / paper protection Clothes

. Cases for use of CCTV system [contd]

Case 2
Maintenance of leak Valve (SI-V522) in SI System Date : 07. 7.17(unit 6 fourth outage) Work Description
At the time of NOT/NOP, SI- check Valve 522 of High Presser Safety injection Header leaked Piping was isolated throughout Ice plugging and Valve was Maintained CCTV System was used to monitor the maintenance work and ALARA Control

. Cases for use of CCTV system [contd]


Result of ALARA Control
Target (mSv) Dose 6.69 Result (mSv) 5.75 % 14

Number of workers : 16 Total working time : 6 hrs

. Effects
Reduction of the number of person coming in and out
Reduction of exposure dosage Reduction of radioactive waste Savings in protection supplies Real-time checkup in the office

Radiation safety control in high radiation areas

. OSART GOOD PRACTICE


IAEA OSART Review
Duration : 2007. 4.16 ~ 5.3 Reviewed items - 7 items besides management, organization, & administration sections of YGN 5&6 Result of review in Radiation Protection Section - 2 good practices out of 10 good practices (No proposal for improvement) - CCTV System was evaluated as Good Practice
the other is RIS (Radiation Information System)

. Conclusion
Radiation safety control is requisites for lasting nuclear industry Our various efforts will help to improve radiation safety control whether it is large or not

Actually, CCTV system is small effort but the such effort will makes a good fruit

Our will and endeavor should be followed

Maintenance of Leak Valve (SI-V522)

Maintenance of leak Valve (SI-V522)

KHNP Overview
KHNP(Korea Hydro & Nuclear Power) Organization
Headquarters

President & CEO QA Office Audit Office PI Office Project Div. Radwaste Project Div.
Hydro Power Ulchin Han-gang Hydro Power

Auditor

Plan & Admin Div.


Branches

Power Gen. Div.

Nuclear Power Site Kori Wolsong

Yonggwang

Gen. Admin. Office Comm. & Envir. Off. Plant 1 (Unit1&2)

New York Office


Paris Office

Nuclear Power Environ. Tech. Inst. Radiation Health Research Inst.

Radwaste Project Site Office

Plant 2 (Unit3&4)
Plant 3 (Unit5&6)

Nuclear Power Education Inst.

KHNP Overview
Status of Nuclear Power Plants
Site Kori

[contd]

Under In Operation Const/Planed 4 (3,137) 4 (2,779) 2 (2,000), 2 (2,800)/ 2 (2,000)/ / 2(2,800) 8 (9,600)

Total Unit (MW) 8 (7,937) 6 (4,779) 6 (5,900) 8 (8,700) 24 (21,716)

Wolsong

Yonggwang 6 (5,900) Ulchin

6 (5,900) 20 (17,716)

Seoul

Total Ulchin #1,2,3,4,5,6 (Shin-Ulchin #1,2)

Wolsong #1,2,3,4 (Shin-Wolsong #1,2) Yonggwang #1,2,3,4,5,6 Kori #1,2,3,4 (Shin-Kori #1,2,3,4)

KHNP Overview [contd]


Nuclear Power Plants in Operation
Project Unit
#1 #2 #3 #4 #5 #6 #1 #2 #3 #4 #1 #2 #3 #4 #1 #2 #3 #4 #5 #6

20 units (17,716 MW)


A/E
Bechtel/KOPEC Bechtel/KOPEC KOPEC KOPEC KOPEC KOPEC Gilbert Gilbert Bechtel/KOPEC Bechtel/KOPEC AECL AECL/KOPEC AECL/KOPEC AECL/KOPEC Framatome Framatome KOPEC KOPEC KOPEC KOPEC

Reactor Type
PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PHWR PHWR PHWR PHWR PWR PWR PWR PWR PWR PWR

Capacity (Mwe)
950 950 1,000 1,000 1,000 1,000 587 650 950 950 679 700 700 700 950 950 1,000 1,000 1,000 1,000

NSSS Supplier
W/H W/H DOOSAN DOOSAN DOOSAN DOOSAN W/H W/H W/H W/H AECL AECL AECL AECL Framatome Framatome DOOSAN DOOSAN DOOSAN DOOSAN

COD
Aug. 1986 Jun. 1987 Mar. 1995 Jan. 1996 May 2002 Dec. 2002 Apr. 1978 July 1983 Sep. 1985 Apr. 1986 Apr. 1983 Jun. 1997 Jun. 1998 Sep. 1999 Sep.1988 Sep. 1989 Aug. 1998 Dec. 1999 July 2004 Apr. 2005

Yonggwang

Kori

Wolsong

Ulchin

KHNP Overview [contd]


NPP planned or under Construction
Project Unit
#1

8 units (9,600 MW)


COD
Dec. 2010
Dec. 2011 Sep. 2013 Sep. 2014 Oct. 2011 Oct. 2012 Dec. 2014 Planned Dec. 2015 Under Construction Under Construction

Reactor Type
PWR
PWR PWR PWR PWR PWR PWR PWR

Capacity (Mwe)
1,000
1,000 1,400 1,400 1,000 1,000 1,400 1,400

Plant Type
*OPR1000
OPR1000 *APR1400 APR1400 OPR1000 OPR1000 APR1400 APR1400

Remark

ShinKori

#2 #3 #4

ShinWolsong ShinUlchin

#1 #2 #1 #2

* OPR : Optimized power Reactor * APR : Advanced power Reactor