IBS Training Module

The document provides an overview of in-building solution (IBS) or distributed antenna system (DAS) projects. It discusses IBS planning processes including site surveys, link budget calculations, and implementation. Key aspects covered include identifying suitable building types, required tools, survey steps, propagation modeling, component losses, and examples of antenna and cabling diagrams. The goal is to train technicians on best practices for IBS planning, design, and optimization.

Uploaded by

Akhtar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views58 pages

IBS Training Module

The document provides an overview of in-building solution (IBS) or distributed antenna system (DAS) projects. It discusses IBS planning processes including site surveys, link budget calculations, and implementation. Key aspects covered include identifying suitable building types, required tools, survey steps, propagation modeling, component losses, and examples of antenna and cabling diagrams. The goal is to train technicians on best practices for IBS planning, design, and optimization.

Uploaded by

Akhtar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
  • IBS Survey
  • Link Budget Calculation
  • Repeater
  • Implementation
  • Conclusion

ADA Cellworks

IBS TRAINING
PREPARED BY:
JAYAN.Y
ADA CELLWORKS,PUNE

ADA Cellworks

CONTENTS

IBS SURVEY
LINK BUDGET CALCULATION
IMPLEMENTATION
QUALITY CHECKLIST
VENDOR HANDLING TIPS
REPEATER
BASIC OF LOS SURVEY
BASIC OF RF SURVEY

ADA Cellworks
What is IBS/DAS ?
1.In-building Solution (IBS) / Distributed Antenna System
(DAS)
2.Small Cell Coverage within building premises
3.Signal is restricted inside the building
4.Antenna installed inside the building
5.Low Transmit Power of Antenna
6.Smaller Antenna size

ADA Cellworks

What drives the need for IBS ?


1. Demand of Continuous coverage
2. Indoor Activities generating high traffic
3. Poor indoor coverage of outdoor sites
4. Offloading outdoor cells with high utilization
5. Improvement of Network Performance.

ADA Cellworks
IBS Project
1.Site Survey (IBS and LOS)
2.Design report preparation of the survey
3.Implementation work
4.Frequency planning and database
preparation
5.Walk test
6.Optimization and site handover

ADA Cellworks

PLANNING PROCESS
Survey, IBS Planning

ADA Cellworks
IBS Planning Process Flow
Chart
SITE ACQUISITION
Customer request
1. With target buildings

-> Preliminary site survey

2.

-> Area survey to locate possible

Without target buildings


target buildings

-> Approval: customer accepts


target buildings

ADA Cellworks

PRELIMINARY SITE SURVEY/PRE- PLANNING


1.
2.
3.
4.

Building Information.
Surrounding Network Information.
Draft Solution Design.
Budgetary Cost Estimation.

ADA Cellworks

SITE SURVEY
1.
2.
3.
4.

Propagation Measurement.
Final BTS & Antenna location.
Final Cable routing.
Photos of Antenna Location, BTS Location, Microwave
Pole location.

ADA Cellworks

DETAIL DESIGN REPORT


1.
2.
3.
4.

System Diagram (Trunking Diagram).


Power Budget Calculation.
Solution Description Template.
TSSR (Technical Site Survey Report) for BTS & Microwave
details.

ADA Cellworks
TYPES OF TYPICAL BUILDINGS COVERED IN
IBS
1.Office Complex
2.Shopping Malls.
3.Hotels & Restaurants.
4.Hospitals.
5.VIP Guest House.
6.Exhibition Centre.
7.Government Buildings.
8.Airports.
9.Railway Stations.
10.Corporate Residential Complex.
11.Factories & Industries

ADA Cellworks

IBS SURVEY & PRE-PLANNING

ADA Cellworks
TOOLS REQUIRED FOR IBS SURVEY
1. GPS
2. Digital Camera.
3. Magnetic Compass.
4. Binoculars.
5. Measuring Tape.
6. Net Monitor Phone.
7. Floor Plan of that Particular Site

ADA Cellworks
STEPS IN IBS SURVEY
1. Study the building architecture, with the help of floor plans &
guidance from
Building authorities
2. Understand the requirements need in terms of Coverage, Capacity,
future
Subscriber growth etc.
3. Identify the duct for the cable routing & component location.
4. Survey on each floor using net monitor and floor plan.
5. Mark the present signal level and the antenna location to be
installed in the
floor plan.
6. Note down all the present serving cell information like CELL ID,
BCCH, Rx.
Level, etc.
7. Identify the BTS location, antenna locations and mark on the floor
plan.
8. Also not down the type of ceiling, whether pop cutting is required
or not

ADA
Cellworks
LOS SURVEY

MAKE TERRACE LAY OUT


TAKE LAT LONG BY GPS
ASK FOR FAR END TO SURVEY CO ORDINATOR
DECIDE TOWER HEIGHT( e. g POLE,RTT, GBT )REQUIREMENT
( ALSO CONSIDER CUSTOMER SPECIFICATION , NOT MENDATORY )
CHECK POSSIBILITY OF CABLE ROUTING UPTO BTS LOCATION
IF PCM CABLE OR A-BTS IS REQUIRED FOR TX ,THEN MAKE NOTE THAT PCM CABLE LENGTH
IS NOT EXCEEDING BY THAT OF GIVEN SPECIFICATION( UPTO 250 M).
( DO NOT COMPROMISE WITH BTS LOCATION IT AFFECTS POWER CALCUTAION )

ADA Cellworks
INDOOR PROPOGATION
Indoor channels are different from traditional mobile radio
channels in two different ways
The distances covered are much smaller
The variability of the environment is much greater for a
much
smaller range of Tx-Rx separation distances.
The propagation inside a building is influenced by
Layout of the building
Construction materials
Typical building type
Sports arena, residential home, factory,...
Indoor propagation is dominated by the same mechanisms as
outdoor
reflection, scattering, diffraction.

ADA Cellworks
However, conditions are much more variable
Doors/windows open or not
The mounting place of antenna
On the wall, ceiling, etc.
The level of floors
In building path loss factors
Partition losses (same floor)
Partition losses between floors

ADA Cellworks
PARTITION LOSSES
There are two kind of partition at the same floor:
Hard partitions: the walls of the rooms
Soft partitions: moveable partitions that does not
span to the
ceiling
The path loss depends on the type of the partitions
PARTITION LOSSES BETWEEN FLOORS
The losses between floors of a building are determined by
External dimensions and materials of the building
Type of construction used to create floors
External surroundings
Number of windows
Presence of tinting on windows

ADA
Cellworks

o Antenna System used in IBS


Integrated Antenna System
An Indoor area covered by one location e.g., open premises like
sports
arena, railway station where BTS is mounted on the wall connected
to the Integrated antenna system
Antennas Distributed Via Coax Feeder Network
This is the most simplified method used in IBS. It has some
advantage like
low cost, flexibility in the
Design when shaping the coverage area, robust and well proven
technique
Leaky Cable
This type is mainly used in Train tunnels, where it is tough to install
with Coax feeder network. It also has flexible design but it is costly
Antennas Distributed Via Fibre Optic Network
Low attenuation is the key factor for the deploying IBS thro fibre

ADA
Cellworks
14M
SP4W5F01
27M
SP3W5F01

24M

15M

AN6F001
3M

SP2W5F03
10M
25M

10M
J

SP4W5F02

5M

AN5F001

14M

10dB
CP10dB5F01

SP3W5F03

AN5F006
AN5F007
AN5F008
AN5F009

09M

11M
6M

7dB

08M

CP7dB5F01

AN5F015

SP2W5F05 13M

19M

AN5F012

AN5F014

04M

AN5F011

AN5F016

AN5F021

08M

12M

23M
SP3W5F02

14M

AN5F013
AN5F025

09M

AN5F010

30M

03M

SP2W5F04

17M

AN5F002J

SP2W5F02 06M

06M
11M

AN5F004
AN5F003

9M

15M

08M

SP2W5F01

AN5F005

7dB

SP2W5F06 07M
CP7dB5F02

AN5F022
AN5F023

10M

20M

7dB

CP7dB5F03

AN5F017
J

15M
15M

SP4W5F03 10M
21M

AN5F018
AN5F019
AN5F020
AN5F025

ADA
Cellworks

11M

17M

AN5F011

AN5F010

10M

15M

23M

AN5F018

AN5F0139

21M

SP4W5F01

SP3W5F02

AN5F003

13M

5M

7M

AN5F019

SP2W5F03

10M
SP2W5F01

CP7dB5F01

AN5F002

SP2W5F02
14M
6M
8M

AN5F001

10dB

23M

AN5F012

25M

AN5F004

7dB

30M

AN5F013

08M

AN5F020

14M

AN5F008

8M

8M

AN5F022

7dB

CP7dB5F02
19M

AN5F016

SP2W5F06

09M
SP3W5F03 SP2W5F05
3M

CP10dB5F01 SP4W5F02

23M

AN5F021

4M

AN5F140
AN5F006

DUCT 1( ELECTRICAL)

AN5F007

AN5F014

AN5F023

11M

13M

09M
14M

10M

14M

20M

SP3W5F01

3M

AN5F005

J
7dB

CP7dB5F03

AN5F009

24M

SP2W5F04

18M

AN5F017

Cable goes to the sixth floor

08M

SP4W5F03

AN5F015

LINK BUDGET CALCULATION

ADA
Cellworks

IT IS BASICALLY FOR POWER THAT REQUIRED AT ANTENNA END.IT DEPENDS ON THE COMPONENTS
THAT HAS BEEN USED FROM BTS TO ANTENNA THAT IS ERP( EFFECTIVE RADIATED POWER ).
We generally deal with EIRP ( Effective Isotropic Radiated Power ),which is defined below.

EIRP( Effective Isotropic Radiated Power )= ERP( Effective Radiated Power ) + Gain of that component

LIST OF COMPONENTS WITH LOSSES ARE AS FOLLOWS::


1)
2)
3)
4)
5)
6)

SPLITTERS
COUPLERS
CABLES
ANTENNAS
COMBINER
JUMPER CABLE

ADA
Cellworks

1) SPLITTERS::

Generally 3 types of splitters are used in IBS which are as follows.

LOSS (dB)

TYPE

2 WAY

-3.25

3 WAY

-5.05

4 WAY

-6.25

ADA
Cellworks

1) SPLITTERS ( Continue )::

2 WAY

3 WAY

4 WAY

ADA
Cellworks

2) COUPLERS::

TYPE

7 dB
10 dB
15 dB

LOSS AT
COUPLE PORT (dB)

-7
-10
-15

LOSS AT
THROUGH PORT (dB)

-1.5
-0.5
-0.3

NOTE: Ideally there should be 0 dB loss at through port. But there is always some loss, which is
mentioned in table.

ADA
Cellworks

2) COUPLERS ( Continue )::

THROUGH PORT

COUPLED PORT

INPUT

ADA
Cellworks

3) CABLES::

TYPE

( LDF4-50 A)
7/8 ( LDF5-50 A )
1-5/8 ( LDF7-50 A )

LOSS (dB per meter)

-0.11
-0.06
-0.03

3) CABLES ( Continue )::

ADA
Cellworks

ADA
Cellworks

4) ANTENNAS::

Generally 3 types of antenna are used in IBS, which are as follows.

Gain (dBi )

TYPE

PANEL ANTENNA

2
7

FLAT PATCH OMNI


ANTENNA

OMNI ANTENNA

ADA
Cellworks

4) ANTENNAS ( Continue )::

OMNI ANTENNA

ADA
Cellworks

4) ANTENNAS ( Continue )::

PANEL ANTENNA

ADA
Cellworks

4) ANTENNAS ( Continue )::

12 cm

12 cm

FLAT PATCH OMNI ANTENNA ( Vendor : Kaweri )

ADA
Cellworks

5) COMBINER::

A combiner is the device that enables several transmitters to transmitter from the same antenna.

TYPE

LOSS

HYBRID COMBINER( 2 I/P,1


O/P )

TX 1

e. g TRX

TX 2

A
N
T
E
N
N
A

3 dB

ADA
Cellworks
6) LINK BUDGET CALCULATION :: Example with Trunking Diagram:

ADA
Cellworks

NOTE:BTS POWER IS MENTIONED AS 37 CONSIDERING 3dB COMBINER LOSS.

6) DIFFERENT CONNECTOR USED IN IMPLEMENTATION:

ADA
Cellworks

( 1 ) N MALE CONNECTOR( L4PNM-RC )

Connect with antenna port


Or splitter port.

Connect with cable

To connect female port of other component like our antennas and splitter.

( 2 ) N FEMALE CONNECTOR( L4PNF-RC )

ADA
Cellworks

Connect with male port like


7/8 to inch connector
Or Kaveri combiner

Connect with cable

To connect male port of other component like 7/8 to connector.

( 3 ) 7/8 to inch CONNECTOR( L5PNM-RC )

ADA
Cellworks

Connect with female port like


Our antannas and splitter

Connect with 7/8 cable( LDF 5-50A )


To connect female port of 7/8 cable at one side and female port of cable or splitter

( 4 ) DIN Male for LDF5-50 A 7/8 inch Cable( L5PDM-RPC )

ADA
Cellworks

Connect with female port of


jumper cable or directly to
Port of BTS which is
Generally at the top of Ultra BTS

Connect with 7/8 cable( LDF 5-50A )


To connect female port of 7/8 cable at one side and BTS port or jumper cable

( 5 ) EXTERNAL COMBINER(AVANTEL)

ADA
Cellworks
Female Port

Female Port

Female Port

( 6 ) EXTERNAL COMBINER(KAVERI)

( 6 ) EXTERNAL COMBINER(KAVERI)

ADA
Cellworks
Female Port

Female Port

Female Port

( 7 ) EXTERNAL JUMPER CABLE

ADA
Cellworks
THIS PORT HAS SIZE SAME AS 7/8 CABLE

AT COMBIER END

AT BTS END

7) BTS Types:
Generally 3 types of BTS Available.
1) Ultra BTS

ADA
Cellworks

Configuration: 4+4+4
Power: 43 dBm

Nominal Voltage:230AC/-48VDC

Cabinet Max. power Demand:1.8KVVAC / 1.5KVADC

ADA
Cellworks

2) METRO BTS

85cm

25cm
35cm
Configuration: 2+2
Power: 40 dBm

ADA
Cellworks
SECTORS JUMPER CABLE

MW CABLE FOR CONNECTIVITY

3) ULTRA MINI BTS

It looks same as Ultra BTS.


Configuration: 2+2
Power: 43 dBm

ADA
Cellworks

ADA Cellworks
DETAILED DESIGN REPORT
1. Building Information: Co-ordinates, No. of Floors, Basements,
Lobbies.
2. BTS Information: BTS Type, BTS O/P power, TRX Configuration,
Sectorization.
3. TSSR Form Transmission & RF details if planned with outdoor
sectors also)
4. Trunking Diagram - Schematic Presentation of Antenna to BTS
connection via different components like, splitters, combiners &
couplers.
5. Link Budget Calculations EIRP calculation at all antenna ports,
considering all the losses.
6. Planned Antenna Location with coverage area.
7. Bill of Quantity - Material Requirement for the Implementation of
DAS.

ADA
Cellworks

REPEATER :
Generally used where capacity required is low.

It amplifies and converts weak signal into stronger signal by adding some gain to it.

There are 2 types of repeaters.


1) BAND SELECTIVE:
It amplifies and boost frequency of particular BAND

2) FREQUENCY SELECTIVE:
It amplifies and boost particular frequencies only (Generally 2 / 3 frequency.

ADA Cellworks
TYPICAL REPEATER INSTALLATION

ADA
Cellworks
PICK UP ANTENNA(HIGHLY DIRECTIONAL )
NEARER SITE

ADA
Cellworks
CONNECTED TO ANTENNA

CONNECTED TO PEAK
UP ANTENNA
POWER: 2W GENERALLY.( 33 dBm )
BAND SELECTIVE

INDOOR REPEATER

ADA Cellworks

IBS IMPLEMENTATION

ADA Cellworks
TYPICAL IBS INSTALLATION

ADA Cellworks
GENERAL IMPLEMENTATION ISSUE IN IBS
OPEN CONNECTION
Antenna, splitter, coupler port is open
COUPLER
Couple port/through port is reversed
Input port/through port is reversed

LABELING
All the splitters and couplers should be labeled for easy identification
ANTENNA PLACEMENT OR ORIENTATIONS IS NOT AS PER PLAN
Shift in antennas if any due to route / customer problem.
THERE IS NO PROPER SADDLING, TYING OF CABLES
No Saddling/tying done on site, typical requirement is as follows
i.e., every 1mtr or 1.5mtr cable is to be tied
REQUIREMENT OF EXTRA MATERIAL
Clamps FOR Antennas/cable

ADA Cellworks
VENDOR HANDLING
1. Handover site to vendor with all details like work permission,
material storage
space, proper cable routing.
2. Generate MRF for delivery of material to this site.
3. Ask vendor for daily update.
4. Must visit site 2-3 day in week.
5. Ask all details after completion of full site.
6. Get the material details from the vendor
7. Get the BOM (Bill of Material) from the vendor and generate cam
Form for
the site after reconciling the material

ADA Cellworks
IMPLIMENTATION AUDIT
Visit site daily if possible otherwise 2-3 day in week
Check installation is as par plan or change
Decide any changes in antenna location (if require according to
aesthetic,
permission, cable routing etc..)

ADA Cellworks

IBS IMPLEMENTATION QUALITY STANDARDS.


1. No Extra Cable is left rolled near the BTS Equipment.
2. Feeder Cable and components have to be independently & properly
clamped
(saddling) to the wall or laid over the cable tray .
3. Combiner is clamped and the various cables to and from the
combiner are
secured properly on the Cable tray or Wall mount.
4. Feeder Installation for all the sectors should have appropriate
bending radius
for both 1/2 & 7/8.
5. Connector have to be weather proofed
6. Feeders & components should be anchored at fixed intervals by
saddling/cable tie
7. Aesthetic rectification should be completed with cleanliness

ADA
Cellworks

THANK YOU

ADA
ADA  Cellw
Cellwoorks
rks
IBS TRAINING
PREPARED BY:
JAYAN.Y
ADA CELLWORKS,PUNE
ADA
ADA  Cellw
Cellwoorks
rks

IBS SURVEY
IBS SURVEY

LINK BUDGET CALCULATION
LINK BUDGET CALCULATION

IMPLEMENTATION 
IMP
ADA
ADA  Cellw
Cellwoorks
rks
What is IBS/DAS ?
1.In-building Solution (IBS) / Distributed Antenna System 
(DAS)
2.Small Cell
ADA
ADA  Cellw
Cellwoorks
rks
What drives the need for IBS ?
1. Demand of Continuous coverage
2. Indoor Activities generating
ADA
ADA  Cellw
Cellwoorks
rks
IBS Project
1.Site Survey (IBS and LOS)
2.Design report  preparation of the survey
3.Implementa
ADA
ADA  Cellw
Cellwoorks
rks
PLANNING PROCESS
Survey, IBS Planning
ADA
ADA  Cellw
Cellwoorks
rks
IBS Planning Process Flow 
Chart
SITE ACQUISITION
 Customer request
1. With target buildings
ADA
ADA  Cellw
Cellwoorks
rks
PRELIMINARY SITE SURVEY/PRE- PLANNING
1. Building Information.
2. Surrounding Network Informati
ADA
ADA  Cellw
Cellwoorks
rks
SITE SURVEY
1. Propagation Measurement.
2. Final BTS & Antenna location.
3. Final Cable routing
ADA
ADA  Cellw
Cellwoorks
rks
DETAIL DESIGN REPORT
1. System Diagram (Trunking Diagram).
2. Power Budget Calculation.
3. Solu