Professional Documents
Culture Documents
OM Scharffen Berger Case Facts
OM Scharffen Berger Case Facts
Scharffenberger
The vision was to produce of highest quality
chocolate from the finest beans available
Established at 27000-square-foot brick warehouse in
Berkeley, California
In 2003, Jim Harris recruited as COO to lead the
business and manage companys growth
The company 60 employees, 24 working in production
area, 18 at retail stores and 18 in Administrative
functions
Scharffen Berger sold its chocolate through its 5 retail
stores, various other retail outlets and its own website
Bean Cleaning
Roasting
Winnowing
Melangeur
Conche
Tempering
Molding
200 kg
beans
8hr/day
Bean
Cleane
r
250 kg in 1.5
hrs 8 hr/day
Capacity 450 kg in 1
hr
Input is 250 kg 8
hr/day
Roaster
Winnower
192 kg
in 15
mins
140 kg in 1 hr
Capacity 200kg/hr
16 hrs/day
Conche (1)
1400 kg in 2436 hrs
effectively.
24 /day
Temperin
g
Conche (2)
Molding
140 kg in
2 hrs
8hrs/day
Packagin
g
185
kg
nibs
Melangeu
r
115 kg in 1.25
hrs 16hrs/day
Bean cleaner
Roaster
Winnower
It could process 450 kg of whole beans each hour
Each batch was approximately 250 kg, from which 185
kg nibs were recovered
It operated during 8 hour shift, 7 days a week
Output = (185*8)/0.56 = 2642kg/day
Melangeur
Melangeur ground nibs in 115 kg batches and each
batch stayed in the machine for approximately 1.25 hrs
The Melangeur was used seven days a week in two 8 hr
shift
Output = (115*2*8)/1.25 = 1472kg/day
Conche
Scharffen Berger used 2 Conches to refine, mix and
aerate the chocolate
Each conche processes approximately 1400 kg batch
of single recipe
99% conching process contains 1400 kg of nibs
whereas 62% contains 850 kg of nibs. Average 1050kg
of nibs is used in batch with approximately 35%
additives
Each batch spent between 48-72 hrs in the conche
The conche was staffed 24 hrs a day, 7 days a week
Output = (1050*24)/30 = 840kg of cocoa
processed/day
Output = 840 * 1.35 = 1134 Kg of final chocolate/day
Tempering
It could process up to 200 kg/hr run at 140kg/hr
Tightly coupled with Moulding
Moulding
The moulding machine processed about 140 kg/
hour
It operated in two 8 hr shifts, seven days a week
Packaging
Scharffen Berger did the packaging for 35% of its
products, remaining 65 % were outsourced
It operated in one 8 hr shift, six days a week
Bean Cleaner
Tempering
and Molding
Packaging
Roaster
Winnower
Conche
Conche
Melangeur