Professional Documents
Culture Documents
THE PASSPORT
When the equipment is transferred to another owner, along with the equipment is transferred
real passport
2020
CONTENT
Section 4. Completeness 7
Section 10. Repair and accounting of work according to bulletins and instructions
19
2
Section 1. General instructions
1. Before using the equipment, carefully read the Operation and Maintenance Manual.
4. An incorrect entry should be carefully crossed out and a new one should be written next to it,
which is certified by the person responsible for the operation of the equipment, indicating his
name and position.
5. When the equipment is transferred to another enterprise or to another owner, the final
summarizing records of its operating time are certified by the seal of the enterprise
transferring the equipment.
3
Section 2. Product basics
4
TR CU Declaration of Conformity
Document Number
Validity
Issuing authority
Certification information
Designation of documents
(international rules) for
TR CU 010/2011 "On the safety of machinery and
compliance with which
certification was carried out equipment"
(issuance of permits for use)
5
Section 3. Basic technical data
3.1. Specifications
6
Section 4. Completeness
7
4.2. Operational documentation:
8
Section 5. Resources, life and storage life, and manufacturer's warranties
Renovation
5 years
(parameter characterizing the operating time)
Overhaul life
10,000 h.
(parameter characterizing the operating time)
MANUFACTURER'S WARRANTY:
Micon Engineers (Hubli) Pvt Ltd guarantees that the BW CL valve will perform as designed,
subject to the customer's compliance with the operating documentation requirements.
9
Section 6. Conservation
Validity
Position, surname and
the date Job title period,
signature
month
10
Section 7. Packaging Details
PACKING CERTIFICATE
Gate valve
(product name)
BW CL No. V593
(designation) (factory number)
Packed
Micon Engineers (Hubli) Pvt Ltd
(manufacturer's name or code)
M.P.
Quality engineer
___________________
(position) (personal signature) (signature decryption)
11
Section 8. Certificate of acceptance
CERTIFICATE OF ACCEPTANCE
Gate valve
(product name)
BW CL No. V593
(designation) (factory number)
manufactured and adopted in accordance with the mandatory requirements of state standards,
current technical documentation and recognized as fit for use
Test Test
Wedne Test the
Test and control type pressure, temperat Result
sday duration date
MPa ure
Monitoring compliance
with technical double 2020
requirements
Marking control double 2020
Visual inspection double 2020
Material testing double 2020
Hydraulic tests Water 20.5 - - double 2020
Pneumatic tests double 2020
12
CERTIFICATE OF ACCEPTANCE
Gate valve
(product name)
BW CL No. V593
(designation) (factory number)
M.P.
Head of Quality Control Department
___________________
(position) (personal signature) (signature decryption)
M.P.
Head of the enterprise
___________________
(position) (personal signature) (signature decryption)
13
Section 9. Product movement during operation
15
Running time Reason Signature
Manufact of the
Where Withdra from the since after for
uring person who
installed wal date beginning of the last withdraw
date carried out
operation renovation al
the
16
9.2. Receiving and handing over the product
17
9.3. Information on securing the product during operation
Base
product name Position,
(name, number and date of the
(component part) surname and Note
document)
and designation initials
anchorage detach
18
Section 10. Repair and accounting of work according to bulletins and
instructions
19
Position, surname and signature
Bulletin Summary Deadline for date of
who completed who checked
number of work completion completion
the work the work
20
Position, surname and signature
Bulletin Summary Deadline for date of
who completed who checked
number of work completion completion
the work the work
22
Section 12. Notes on use and storage
23
The decision on disposal is made after a set of measures, including an examination of the
state of the reinforcement, an assessment of the residual resource.
24
Section 14. Special marks
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________
25
(on the back of the last page)
________________________
(signature) (decryption of signature)
M. P.
"____" __________ 20 __