Pakpattan Degraded Patches Re drive .

3G Drive test Report

> Internal
Only
> Internal
Only

Introduction & Summary .


Re Drive test has been conducted for degraded patches of Pakpttan city after changes on
sites after mutual discussion with counter part to improve throughput and EC/NO degra
ded patches .
Improvement has been observed after changes as mentioned in trailing slides.

ZTE
Corporation. All
reserved.
ZTE
Corporation.
Allrights
rights
reserved.

Patch 1
Slight Improvement observed after changes on site 5175_2 and 5921 _1 . This patch can not be improved
through 4869 due to low height of 1st and 3rd and Null factor . Changes and audit mentioned in slide # 9.

Patch 2
Improvement observed after changes on site 5989 _2 after small down tilting sector 2.

Patch 3
Improvement observed after changes on site 5989 _3 after changes azimuth 290 to 250 .

Patch 4
Slight Improvement observed after changes electrical tilt 4915_3 .Azimuth can not be changed due to 2G antenna blocking in front of 3G
antenna if changed 280 to 300 azimuth .Snap of antenna attached in next slide .

4915 _3 antenna Blocking


Antenna blocking occurs if we change azimuth 280 to 300 of 4915_3

AS EC/No Patch
EC/No degraded patch has been improved after changes on sites through 5175 ,4869 and 5921 _1 .

Sites Audit for degraded patches

Pre

Post

Azimuth

M.

Azimuth

Height

5175-2

220

220

43m

5989-2

150

150

43m

5989-3

290

250

43m

4915_3

280

280

41m

5921-1

60

NA

NA

50

42m

4869-1

60

60

29m

4869-3

290

290

23m

Site ID

Thank you