Professional Documents
Culture Documents
Mostar
...............
sekraz.ephzhb@tel.net.ba
Telephone* ++38736335701
Fax ++38736335789
City* Mostar
2500
0
energy GWh
2000
-500
1500
-1000
1000
500
-1500
0 -2000
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
-2500
year 93
94
95
96
97
98
99
00
01
02
03
04
05
06
19
19
19
19
19
19
19
20
20
20
20
20
20
20
peak load demand generating electricity year
7000 900
800
6000
700
5000
600
Optereenje [MW]
Potronja [GWh]
4000
500
400
3000
300
2000
200
1000
100
0 0
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
potronja - ostvarenje potronja - prognoza maksimalno optereenje - ostvarenje maksimalno optereenje - prognoza
WF GLAMO
WF DEBELO BRDO
PSPP KABLI SHPP STRANJ
SHPP MOKRONOGE
WF BOROVA GLAVA WF MOKRONOGE
PSPP VRILO WF SRANI
TPP Kongora WF POKLEANI
WF MESIHOVINA WF PLONO
WF VLAJNA
WF PLANINICA
SHPP MODRO OKO
SHPP KLOKUN
SHPP KOUAHPP MOSTARSKO BLATO
SHPP KRAVICE
SHPP STUBICA
WF CRKVINA
WF VELJA MEA
WF BELENII
WF IVANJICA
TABLE of energy power plants under construction and planned
Number Annual
of units Capacity
No. Name production Year
power (MW)
(MWh)
(MW)
1. HPP Mostarsko Blato 2x30 62 169000 2010
2. SHPP Koua 2x2,4 4,78 18304 2010
3. SHPP Klokun 2x1,75 3,50 12592 2010
4. SHPP Dubrava 2x2,5 5,00 12524 2010
5. SHPP Luke 2x1 2,00 5149 2010
6. SHPP Kravica 2x2,5 5,00 21805 2011
7. SHPP Stubica 2x1,5 3,00 12750 2012
8. SHPP Modo Oko 2x1,85 3,75 12224 2012
9. SHPP Stranj 2x3,65 7,30 20800 2012
10. SHPP Mokronoge 2x1,65 3,30 6607 2013
11. V F Velika Vlajna 16x2 32 89356 2010
12. V F Mesihovina 22x2 44 128527 2010
13. V F Livno (Borova Glava) 26x2 52 149617 2010
14. V F Mokronoge 35x2 70 197400 2012
15. V F Srdani 15x2 30 76512 2012
16 V F Poklecani 20x2 40 115632 2012
17. V F Planinica 14x2 28 64940 2012
18. V F Crkvine 12x2 24 64210 2015
19. V F Velja Mea 9x2 18 35630 2015
20. PSPP Vrilo 1x52 52 92591 2014
21. PSPP Kablic 1x52 52 73442 2015
22. HPPHan Skela 2x5,5 11 54000 2015
23. HPP Ugar Ue 1x15 15 60000 2015
24. HPP Vrletna Kosa 2x12,5 25 65000 2015
25. TPP Kongora 2x275 550 3000000 2015
26. NEW RENEWABLE 592,622 1558611,1
2010-
27. NEW CAPACITY SUM 1143 4558611 2015
Existing HPP New HPP WindFarm TPP Consumption EP
Diagram source: Integral development Study of JP Elektroprivreda HZHB Inc. Mostar for
the period of 2006 2010 with projection to Year 2020; Energy institute Inc. April 2007.
EP HZHB activities on new RES Projects
Level of projecting of the future hydro generating capacities by river basins
Name Level of projecting Project house Year of realisation
Project
documentation
R. BASIN T-M-T
SHPP MODRO OKO Prefeasibility study PU EPHZHB - Research and
development department
2008
SHPP KLOKUN* Feasibility study PORY ENERGY GmbH Wien,
Austria 2007
SHPP KOUA* Feasibility study PORY ENERGY GmbH Wien,
Austria 2007
SHPP KRAVICA* Feasibility study PORY ENERGY GmbH
Salzburg, Austria 2th q of 2009
SHPP STUBICA* Feasibility study PORY ENERGY GmbH
Salzburg, Austria 2th q of 2009
R.BASIN LITICA
SHPP DUBRAVA* Feasibility study PORY ENERGY GmbH Wien,
Austria 2th q of 2009
SHPP LUKE I FRIARS* Feasibility study PORY ENERGY GmbH Wien,
Austria 2th q of 2009
R. BASIN UPPER CETINA
SHPP STRANJ Prefeasibility study PU EPHZHB - Research and
development department
3th q of 2009
SHPP MOKRONOGE Prefeasibility study PU EPHZHB - Research and
development department
4th q of 2008
PSPP VRILO* Feasibility study Elektroprojekt d.d. Zagreb,
Croatia 4th q of 2009
PSPP KABLI Prefeasibility study PU EPHZHB - Research and
development department
3th q of 2009
R.BASIN VRBAS
HPP HAN SKELA Prefeasibility study Elektroprojekt d.d. Zagreb,
Croatia 2007
HPP on river Ugar Prefeasibility study Elektroprojekt d.d. Zagreb,
Croatia 2008
Notes:
Arranged by Contract from our own budget
* Prefeasibility study designed by PU EPHZHB - Research and development department
Level of projecting of the future wind generating capacities: FEASIBILITY STUDY
DURATION
WIND FARM Months Year of realisation PROJECT HOUSE
MOKRONOGE 12 2007
SRANI 12 2007
PLANINICA 12 2007
POKLEANI 12 2008
PLONO 12 2008
CRKVINA 12 2008
IVANJICA 12 2008
Notes:
Pre-feasibility study prepared by PU EPHZHB - Research and development department, Year 2005-2007
Level of projecting of the future wind generating capacities : FINAL DESIGN
Name Level of projecting Project house Year of realisation
Project documentation
Wind energy Project
110kV Substation for wind
farms Tomislavgrad, Livno and Final design Energocontrol d.d. Zagreb 2th q of 2009
Velika Vlajna*
Notes:
Arranged by Contract from own budget
PRESENT ACTIVITIES
In cooperation with our company (technical and administrative
support) the KfW bank carry out activities:
updating of a feasibility study to take into account the latest
wind measurements at the site. This assessment was prepared
by Consultant Anemos Jacob and finished in October 2008.
CAPACIT
RENEVABL NETGHG
NAME Y INITIAL COST
E ENERGY REDUCTION
FACTOR
CAPACITY
MW MWh % tCO2/year
SHPP MODRO OKO 3,746 12.224 37% 9.772 7.443.012,365
SHPP KLOKUN 3,451 12.592 42% 9.847 8.528.811,586
SHPP KOUA 4,782 18.304 44% 14504 9.952.427,749
SHPP KRAVICE 4,996 21.805 50% 17.431 10.061.108,14
SHPP STUBICA 2,946 12.750 49% 10.192 7.603.341,455
R. BASIN T-M-T 19,921 77.674 61.746,7 43.588.701,3
LITICA RIVER BASIN
Hidrology stations, springs and defined sinkholes area
Map of SHPP in Litica river basin
SHPP Dubrava & Luke - 3D model
Design parameters of SHPP on Litica river basin
CAPACIT
RENEVABL NETGHG
NAME Y INITIAL COST
E ENERGY REDUCTION
FACTOR
CAPACITY
MW MWh % tCO2/year
SHPP DUBRAVA 5,203 12,524 27% 10.012 11.962.797,00
SHPP LUKE 1,998 5,149 29% 3.293 5.708.125,671
R. BASIN LITICA 7,201 17,673 13.304,596 17.670.922,67
UPPER CETINA RIVER BASIN
BORDER OF UPPER CETINA RIVER BASIN
Hidrology stations
Map of SHPP & PSPP in Upper Cetina river basin
Design parameters of SHPP & PSPP on river basin Upper Cetina
CAPACIT
RENEVABL NETGHG
NAME Y INITIAL COST
E ENERGY REDUCTION
FACTOR
CAPACITY
MW MWh % tCO2/year
CAPACIT
RENEVABL NETGHG
NAME Y INITIAL COST
E ENERGY REDUCTION
FACTOR
CAPACITY
MW MWh % tCO2/year
The most of studies and analysis were performed by "NIP, SA", Madrid
in cooperation with EP HZ HB. The review of these studies was
conducted by "GARRAD HASSAN" Zaragoza
WIND ENERGY PROJECT
VELIKA VLAJNA
VLAJNA
Total gross annual Total net annual energy Total net annual energy
Full load equivalent Capacity Proportional
energy production production (GWh) production (GWh) considering
hours/year factor wake loss (%)
(GWh) considering wake losses other sources of losses
MESIHOVINA
MESIHOVINA
Total gross annual Total net annual energy Total net annual energy
Full load equivalent Capacity Proportional
energy production production (GWh) production (GWh) considering
hours/year factor wake loss (%)
(GWh) considering wake losses other sources of losses
LIVNO
LIVNO
Total gross annual Total net annual energy Total net annual energy
Full load equivalent Capacity Proportional
energy production production (GWh) production (GWh) considering
hours/year factor wake loss (%)
(GWh) considering wake losses other sources of losses
AREA OF
COAL DEPOSIT
KONGORA LIGNITE MINE AND THERMAL POWER PlANT YEAR 2007
In the area of Kongora in the Duvno Plain, there are large amounts of coal
with a low calorific value. The first research was done in 1956 and 1957,
then in the period 1975 1978 when most of the research work was carried out and
appropriate analyses and studies were prepared.Taking into consideration the results
of the research and environmental protection principles, in 1997, Elektroprivreda
Hrvatske zajednice Herceg Bosne gave Rheinbraun Engineering und Wasser GmbH
Cologne, Germany the charge of preparing the pre-feasibility study Integrated Lignite
Mining and Power Project Kongora. The study was prepared in June,1998 and proved
that it is possible to extract energy coal in the Kongora coal deposit. The coal would
be used as a fuel for a thermal power plant with the capacity of over 550 MW in the
period of 40 years.
JP Elektroprivreda HZ HB provided the necessary funds to keep on the detailed
research in this site with the objective of establishing the coal quantity and quality.
Other research was also done for the needs of the Kongora lignite mine and thermal
power plant. The work was carried out according to the Study on Detailed Additional
Geological Research of Kongora Lignite Deposit near Tomislavgrad (the Faculty of
Mining Engineering-Geology-Civil Engineering of Tuzla University, 2006) on the basis
of the approval given by the Ministry of Economic Affairs of HB Canton.
1956 6 boreholes (K-1, K-2, K-3, K-16, K-17 i K-18), total 1518,83 m. Geoinenjering Sarajevo- Institut for geology Sarajevo ,
B&H
1975 14 boreholes (K-21 - K-34), total 1512,70 m Geoinenjering Sarajevo- Institut for geology Sarajevo ,
B&H
1976 6 boreholes (K-35 - K-40) total 864,75 m Geoinenjering Sarajevo- Institut for geology Sarajevo ,
B&H
1977 5 boreholes (K-41 - K-45) total od 683 m, Geoinenjering Sarajevo- Institut for geology Sarajevo ,
B&H
2007 Exploration drilling with coring and extracting of prospecting PU Geo-Mari d.o.o. - Geotehnika 94 d.o.o. Mostar, B&H
trench, 49 boreholes total 6039,50m
PROJECT DOCUMENTATIONS
Year Project documentations Project house
1978 Elaborate on the classification, categorisation and calculation on the lignite Geoinenjering Sarajevo- Institut for geology
reserves in the Kongora deposits Sarajevo
1998 Pre - Feasibility Study Integrated lignite mining and power project Kongora Rheinbraun Enginering und Wasser GmbH
/ Zalede, June 1998 Koln Njemaka
2006 Project Detailed geological investigation of lignite deposit Kongora near Faculty of Mining, Geology and Civil
Tomislavgrad, Engineering, Tuzla, B&H, year
2007 - 2008 Laboratory testing of coal and completion of Elaboration on coal quality Inspekt RGH, Sarajevo, B&H, year 2007-2008.
(total nr. of analysys 972 were conducted)
2007- 2008 Laboratory testing of physical mechanical characteristics of coal and Mining institute, Tuzla, B&H, year
accompanying sediments and completion of Geo-mechanical Elaborate
(total nr. of analysys 699 were conducted),
2009 Elaborate on classification and categorisation of lignite deposit Kongora Faculty of Mining, Geology and Civil
Engineering (FMGCE), Tuzla; JP PHZHB
COAL DEMAND
PRELIMINARY LOAD SCHEDULE AND UNIT NET GENERATION ( 275 MW )
FALLOW:
With mentioned coal demand per year, time limitation of surface pit
is 169 071 885 tons: 3 657 000 = 46,23 years ~ 46 years
COST EVALUATION FOR ENTIRE PERIOD OF USE
The cah flow analysis has been carried out for main and power plant
together.
Item Total expenditure (million )
Estimated total cost with investment for entire period of 46 years is: 4 252 638
075
Evaluation of exploration costs
In average, during the working period of the mine costs of coal production
are:
- 11,31 EUR/tons that is
- 1,532 EUR/GJ
ENERGY INFRASTRUCTURE PROJECTS IN THE EBNERGY
COMMUNITY, UNDER IMPLEMENTATION, OR WITH
FINANCING IDENTIFIED
VE GLAMO
VE
DEBELO BRDO
VE
BOROVA GLAVA VE MOKRONOGE
VE SRANI
VE MESIHOVINA
VE POKLEANI
VE PLONO
110 kV network topology Area South 2007-2015
VE POKLEANI VE PLONO
VE
VELIKA VLAJNA
VE PLANINICA
VE MERDAN
GLAVA
VE KAMENA
110 kV network topology Area S-I 2007-2015
VE CRKVINA
VE
VELJA MEA
VE BELENII
VE IVANJICA
Integration of Wind
Power into Electricity Grids
SYSTEM PLANNING AND NETWORK DEVELOPMENTS