Professional Documents
Culture Documents
Plumbing: Welcome Students!
Plumbing: Welcome Students!
Welcome Students!
Lecture Note 3 Reservoir
RE 091307
Plumbing
2010/2011 Department of Environmental Engineering ITS 2
2010/2011 Plumbing Department of Environmental Engineering ITS 3
Ground Reservoir
Plumbing
2010/2011 Department of Environmental Engineering ITS 6
Sistem tangki tekan
Plumbing
2010/2011 Department of Environmental Engineering ITS 7
Bagan Reservoir
Manhole
Pipa Inlet
Pipa Overflow
Lubang
Pengurasan
Pipa Outlet
Plumbing
2010/2011 Department of Environmental Engineering ITS 8
Penentuan Kapasitas Reservoir
Kapasitas tangki air bawah (Noerbambang &
Morimura (1993) hal 96):
VR = Qd Qs T atau
Vr = T . Qd . % suplai air bersih
Plumbing
2010/2011 Department of Environmental Engineering ITS 9
Kapasitas tangki air atas (Noerbambang & Morimura
(1993) hal 97) :
VE = (Qp Qmax) Tp + Qpu Tpu
VE : Kapasitas efektif tangki atas (m3)
Qp : Kebutuhan puncak (liter/menit) atau Qmmax
Qmax : Kebutuhan jam puncak (liter/menit) = Qpu
Qpu : Kapasitas pompa pengisi (liter/menit) = Qh max
(l/jam)
Tp : Jangka waktu kebutuhan puncak (menit)
Tpu : Jangka waktu kerja pompa pengisi (menit)
Plumbing
2010/2011 Department of Environmental Engineering ITS 10
Lets Have a Great Sem!