You are on page 1of 10

Quality aspects for Technical

Standards for construction of


Electrical Plants & Transmission
Lines -CEA Regulations, 2010

Sri B.K.Sarkar
A.C.E. – I, Engg. Dept.
WBSETCL
Quality of Planning &
Designing-
Optimum designing of high quality equipments using
latest software/ technology

Proper cost estimation of designed equipment for


budget assessment

Best quality infrastructures like modern drawing/


drafting/ editing facility for the employers supported
by latest IS/ IEC Documents to improve output in
proper time schedule.

Proper preparation of Quality Assurance Plan


Quality of Raw Materials used-
Proper Stage inspection of major equipment.
Encourage manufacturers for remote inspection
through VMS (Visual Monitoring System)

Review of regular stage inspection/ in house


process report
Quality of Assembled
Equipment used-
Proper inspection/ witnessing testing of major
equipment as per relevant IS/ IEC

Encourage manufacturers for remote inspection


through VMS (Visual Monitoring System)
Quality of Manpower-

Compulsory training and motivational program &


procedure at regular interval.

Presentation/ Seminar on different new technologies


to enrich knowledge as well as adoption of the same
in new products to save space/ cost/ time.
Quality of Construction-

Regular interaction with grass-root level


construction workers and extend CSR (Company
Social Responsibility) scheme to them

Signature analysis of constructed 400kV & above


class Transmission line before commissioning

In-built continuous UHF PD monitoring device in


220kV & above class GIS equipment
Quality of Operation &
Maintenance-
Preparation and Maintenance of Work Calendar

Adoption of best quality tools and tackles

Proper Safety measure for equipment and


maintenance personnel

Proper security arrangement in substation

Regular visit to substations


Quality of Safety gears-

Proper safety guard, proper name plate and safety


board with sign or symbol
Quality of documentation-
Preservation and proper management of both hard
and soft copies of documents like Drawing/ Quality
assurance plan/ Test report etc
Thank you
for your kind attention!!!