You are on page 1of 13

SIMULATION THEORY

SIMULATE THE SEWING PANTS BAGS


PRODUCTION BY ARENA SOFTWARE
INSTRUCTOR: DR. Huynh Nhat To
TEAM: Florentino
GOAL

SYSTEM DESCRIPTION

COLLECTED DATA

CONCLUSION
GOAL Optimizing the number of machining stations,
workers and increasing the fastest production
speed
 Ensuring cycle time of product machining and
meeting the demand.
Understanding the operation of the sewing
line

Finding out the best product processing


method
Through simulation results and actual
operation of the line
Conclusion on the effectiveness of the
production line
SYSTEM DESCRIPTION

ENTITIES MACHINES, MATERIALS

PRODUCTION RHYTHMES,
ATTRIBUTES FALURE RATE

ACTIVITIES SEWING

EVENTS FAILURE

SYSTEM STATE VARIABLES BOTTLENECKS, SLOWLY


MODEL SEWING PANTS BAGS PRODUCTION LINE
ECTED DATA

TARGET •500 products/day

TOTAL TIME
PRODUCTION IN ONE •T = 540mins*60s = 32400s
DAY

FAILURE RATE •15%

PROCESSING • 52 stages and 28 stations


COLLECTED
DATA

SEWING PRODUCTION
PROCESSING
COLLECTED
DATA

SEWING PRODUCTION
PROCESSING
COLLECTED
DATA

SEWING PRODUCTION
PROCESSING
Use Random(Exponential) and
Exponential* for time processing at
stages in the line
Use Random(Exponential) and
Exponential* for time processing at
stages in the line

The random distribution function and


the function are distributed
exponentially
CONCLUSION

After we run the simulation model of each line, we will:

 Determine the number of workers and sewing machines


needed at each stage is how many lines to operate effectively
 Without bottle neck, slowly at stages

You might also like