Professional Documents
Culture Documents
Simulation Theory: Simulate The Sewing Pants Bags Production by Arena Software
Simulation Theory: Simulate The Sewing Pants Bags Production by Arena Software
SYSTEM DESCRIPTION
COLLECTED DATA
CONCLUSION
GOAL Optimizing the number of machining stations,
workers and increasing the fastest production
speed
Ensuring cycle time of product machining and
meeting the demand.
Understanding the operation of the sewing
line
PRODUCTION RHYTHMES,
ATTRIBUTES FALURE RATE
ACTIVITIES SEWING
EVENTS FAILURE
TOTAL TIME
PRODUCTION IN ONE •T = 540mins*60s = 32400s
DAY
SEWING PRODUCTION
PROCESSING
COLLECTED
DATA
SEWING PRODUCTION
PROCESSING
COLLECTED
DATA
SEWING PRODUCTION
PROCESSING
Use Random(Exponential) and
Exponential* for time processing at
stages in the line
Use Random(Exponential) and
Exponential* for time processing at
stages in the line