Professional Documents
Culture Documents
BARAUNI REFINERY(HISTORY):
It was built in collaboration with Russia and Romania with an initial cost of Rs.49.40
crore. It was commissioned in 1964 with a refining capacity of 1 million metric tonnes
per annum and was dedicated to nation by then union minister for petroleum
Prof.Humayun Kabir.
After debottlenecking, revamping and expansion project its capacity today is 6 MMTPA.
The refinery receives crude oil by pipeline from Paradip on the east coast via Haldia.
Services:
1. Refining
2. Pipelines
3. Marketing
4. Training
5. Research & Development
BARAUNI REFINARY INTRODUCTION
Objective:
The establishment of a totally electronic-based communication system within
the refinery. To set up eco-friendly refinery, as indicated by a green belt outside it.
1. Hot Permit – for hot jobs like welding, gas cutting, etc.
2. Height permit – to work at heights
3. Soil Excavation Permit
4. Cold Permit
•Learnt about various units required for obtaining variety of products from crude oil.
•Practical experience.
• Nevertheless, we did enjoy the training to the fullest and are very sure that this training
will help us in our future endeavors.
THANKYOU